메뉴 건너뛰기




Volumn 57, Issue 4, 2009, Pages 893-904

The value of multistage stochastic programming in capacity planning under uncertainty

Author keywords

Equipment planning: Capacity expansion; Facilities; Production; Programming: Stochastic; Scheduling: Planning

Indexed keywords

ANALYTICAL BOUNDS; APPROXIMATION SCHEME; ASYMPTOTICALLY OPTIMAL; CAPACITY EXPANSION; CAPACITY PLANNING; COMPUTATIONAL EXPERIMENT; GENERAL CLASS; INTEGER PROGRAM; MULTI-STAGE MODELS; MULTI-STAGE STOCHASTIC INTEGER PROGRAMMING; MULTISTAGE STOCHASTIC PROGRAMMING; PROBLEM INSTANCES; PROGRAMMING: STOCHASTIC; SCENARIO TREE; SEMICONDUCTOR TOOLS; TWO STAGE;

EID: 69949103828     PISSN: 0030364X     EISSN: 15265463     Source Type: Journal    
DOI: 10.1287/opre.1080.0623     Document Type: Article
Times cited : (103)

References (28)
  • 1
    • 69949088123 scopus 로고    scopus 로고
    • SIPLIB: A stochastic integer programming test problem library
    • Ahmed, S. 2004. SIPLIB: A stochastic integer programming test problem library. http://www.isye.gatech.edu/~sahmed/siplib/.
    • (2004)
    • Ahmed, S.1
  • 2
    • 1942539743 scopus 로고    scopus 로고
    • An approximation scheme for stochastic integer programs arising in capacity expansion
    • Ahmed, S., N. V. Sahinidis. 2003. An approximation scheme for stochastic integer programs arising in capacity expansion. Oper. Res. 51 461-471.
    • (2003) Oper. Res , vol.51 , pp. 461-471
    • Ahmed, S.1    Sahinidis, N.V.2
  • 3
    • 0012246407 scopus 로고    scopus 로고
    • Robust capacity planning in semiconductor manufacturing
    • IBM Corporation, Yorktown Heights, New York
    • Barahona, F., S. Bermon, O. Gunluk, S. Hood. 2005. Robust capacity planning in semiconductor manufacturing. Technical Report RC22196, IBM Corporation, Yorktown Heights, New York.
    • (2005) Technical Report RC22196
    • Barahona, F.1    Bermon, S.2    Gunluk, O.3    Hood, S.4
  • 4
    • 0000541726 scopus 로고
    • Capacity expansion under stochastic demands
    • Bean, J. C., J. L. Higle, R. L. Smith. 1992. Capacity expansion under stochastic demands. Oper. Res. 40 S210-S216.
    • (1992) Oper. Res. , vol.40
    • Bean, J.C.1    Higle, J.L.2    Smith, R.L.3
  • 5
    • 9644308639 scopus 로고
    • Partitioning procedures for solving mixed variables programming problems
    • Benders, J. F. 1962. Partitioning procedures for solving mixed variables programming problems. Numersiche Mathematik 4 238-252.
    • (1962) Numersiche Mathematik , vol.4 , pp. 238-252
    • Benders, J.F.1
  • 6
    • 0028446466 scopus 로고
    • A stochastic optimization model for planning capacity expansion in a service industry under uncertain demand
    • Berman, O., Z. Ganz, J. M. Wagner. 1994. A stochastic optimization model for planning capacity expansion in a service industry under uncertain demand. Naval Res. Logist. 41 545-564.
    • (1994) Naval Res. Logist , vol.41 , pp. 545-564
    • Berman, O.1    Ganz, Z.2    Wagner, J.M.3
  • 7
    • 0022129190 scopus 로고
    • Decomposition and partitioning methods for multistage stochastic linear programs
    • Birge, J. R. 1985. Decomposition and partitioning methods for multistage stochastic linear programs. Oper. Res. 33 989-1007.
    • (1985) Oper. Res , vol.33 , pp. 989-1007
    • Birge, J.R.1
  • 9
    • 0024700442 scopus 로고
    • A scenario approach to capacity planning
    • Eppen, G. D., R. K. Martin, L. Schrage. 1989. A scenario approach to capacity planning. Oper. Res. 37 517-527.
    • (1989) Oper. Res , vol.37 , pp. 517-527
    • Eppen, G.D.1    Martin, R.K.2    Schrage, L.3
  • 10
    • 0001599465 scopus 로고
    • Optimal investment in product-flexible manufacturing capacity
    • Fine, C. H., R. M. Freund. 1990. Optimal investment in product-flexible manufacturing capacity. Management Sci. 36 449-466.
    • (1990) Management Sci , vol.36 , pp. 449-466
    • Fine, C.H.1    Freund, R.M.2
  • 11
    • 0019585180 scopus 로고
    • MULTIREGION DYNAMIC CAPACITY EXPANSION PROBLEM - 1.
    • Fong, C. O., V. Srinivasan. 1981a. The multiregion dynamic capacity expansion problem: Part I. Oper. Res. 29 787-799. (Pubitemid 12471864)
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 787-799
    • Fong, C.O.1    Srinivasan, V.2
  • 12
    • 0019587229 scopus 로고
    • MULTIREGION DYNAMIC CAPACITY EXPANSION PROBLEM - 2.
    • Fong, C. O., V. Srinivasan. 1981b. The multiregion dynamic capacity expansion problem: Part II. Oper. Res. 29 800-816. (Pubitemid 12471865)
    • (1981) Operations Research , vol.29 , Issue.4 , pp. 800-816
    • Fong, C.O.1    Srinivasan, V.2
  • 13
    • 84925923110 scopus 로고
    • Capacity expansion when demand is a birth-death random process
    • Freidenfelds, J. 1980. Capacity expansion when demand is a birth-death random process. Oper. Res. 28 712-721.
    • (1980) Oper. Res , vol.28 , pp. 712-721
    • Freidenfelds, J.1
  • 15
    • 0038630719 scopus 로고    scopus 로고
    • Capacity planning under demand uncertainty for semiconductor manufacturing
    • Hood, S. J., S. Bermon, F. Barahona. 2003. Capacity planning under demand uncertainty for semiconductor manufacturing. IEEE Trans. Semiconductor Manufacturing 16(2) 273-280.
    • (2003) IEEE Trans. Semiconductor Manufacturing , vol.16 , Issue.2 , pp. 273-280
    • Hood, S.J.1    Bermon, S.2    Barahona, F.3
  • 16
    • 69949094223 scopus 로고    scopus 로고
    • Ph.D. thesis, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta
    • Huang, K. 2005. Multi-stage stochastic programming models in production planning. Ph.D. thesis, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta.
    • (2005) Multi-Stage Stochastic Programming Models in Production Planning
    • Huang, K.1
  • 17
    • 0000951157 scopus 로고
    • Sequential production planning over time at minimum cost
    • Johnson, S. M. 1957. Sequential production planning over time at minimum cost. Management Sci. 3 435-437.
    • (1957) Management Sci , vol.3 , pp. 435-437
    • Johnson, S.M.1
  • 18
    • 4344689081 scopus 로고    scopus 로고
    • Coordinating strategic capacity planning in the semiconductor industry
    • Karabuk, S., S. D. Wu. 2003. Coordinating strategic capacity planning in the semiconductor industry. Oper. Res. 51 839-849.
    • (2003) Oper. Res , vol.51 , pp. 839-849
    • Karabuk, S.1    Wu, S.D.2
  • 19
    • 0028508290 scopus 로고
    • Dynamic capacity expansion problem with multiple products: Technology selection and timing of capacity additions
    • Li, S., D. Tirupati. 1994. Dynamic capacity expansion problem with multiple products: Technology selection and timing of capacity additions.Oper. Res. 42 958-976.
    • (1994) Oper. Res , vol.42 , pp. 958-976
    • Li, S.1    Tirupati, D.2
  • 20
    • 0020183161 scopus 로고
    • Operations research and capacity expansion problems:A survey
    • Luss, H. 1982. Operations research and capacity expansion problems:A survey. Oper. Res. 30 907-947.
    • (1982) Oper. Res , vol.30 , pp. 907-947
    • Luss, H.1
  • 21
    • 0000072606 scopus 로고
    • Capacity expansion and probabilistic growth
    • Manne, A. S. 1961. Capacity expansion and probabilistic growth. Econometrica 29 632-649.
    • (1961) Econometrica , vol.29 , pp. 632-649
    • Manne, A.S.1
  • 22
    • 0010355745 scopus 로고
    • Capacity expansion with alternative technology choices
    • Rajagopalan, S. 1994. Capacity expansion with alternative technology choices. Eur. J. Oper. Res. 77 392-403.
    • (1994) Eur. J. Oper. Res , vol.77 , pp. 392-403
    • Rajagopalan, S.1
  • 23
    • 69649105932 scopus 로고    scopus 로고
    • Stochastic Programming
    • Ruszczyński, A., A. Shapiro, eds Elsevier Science, Amsterdam
    • Ruszczyński, A., A. Shapiro, eds. 2003. Stochastic Programming. Handbooks in Operations Research and Management Science, Vol.10. Elsevier Science, Amsterdam.
    • (2003) Handbooks in Operations Research and Management Science , vol.10
  • 24
    • 69949093420 scopus 로고    scopus 로고
    • Column-generation for capacity-expansion planning of electricity distribution networks. A. Mason, ed
    • Auckland
    • Singh, K. J. 2004. Column-generation for capacity-expansion planning of electricity distribution networks. A. Mason, ed. Proc. 39th Annual Oper. Res. Soc. New Zealand Conf., Auckland, 76-85.
    • (2004) Proc. 39th Annual Oper. Res. Soc. New Zealand Conf. , pp. 76-85
    • Singh, K.J.1
  • 26
    • 0033889013 scopus 로고    scopus 로고
    • Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
    • Swaminathan, J. 2000. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. Eur. J. Oper. Res. 120 545-558.
    • (2000) Eur. J. Oper. Res , vol.120 , pp. 545-558
    • Swaminathan, J.1
  • 27
    • 0036468753 scopus 로고    scopus 로고
    • Stochastic tool procurement planning for wafer fabrication facilities: A scenario-based approach
    • Swaminathan, J. 2002. Stochastic tool procurement planning for wafer fabrication facilities: A scenario-based approach. IIE Trans. 34 145-155.
    • (2002) IIE Trans , vol.34 , pp. 145-155
    • Swaminathan, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.