-
1
-
-
0029496983
-
Quantifying process benefits of electronic data management technologies
-
10.1061/(ASCE)0733-9364(1995)121:4(415)
-
Back, W., and Bell, L. (1995). " Quantifying process benefits of electronic data management technologies.." J. Constr. Eng. Manage., 121 (4), 415-421. 10.1061/(ASCE)0733-9364(1995)121:4(415)
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 415-421
-
-
Back, W.1
Bell, L.2
-
3
-
-
0027883457
-
The productivity paradox of information technology
-
10.1145/163298.163309
-
Brynjolfsson, E. (1993). " The productivity paradox of information technology.." Commun. ACM, 36 (12), 67-77. 10.1145/163298.163309
-
(1993)
Commun. ACM
, vol.36
, Issue.12
, pp. 67-77
-
-
Brynjolfsson, E.1
-
4
-
-
0346788758
-
Paradox lost? Firm-level evidence on the returns to information systems spending
-
Brynjolfsson, E., and Hitt, L. (1996). " Paradox lost? Firm-level evidence on the returns to information systems spending.." Manage. Sci., 42 (4), 541-558.
-
(1996)
Manage. Sci.
, vol.42
, Issue.4
, pp. 541-558
-
-
Brynjolfsson, E.1
Hitt, L.2
-
5
-
-
33745325795
-
Using global positioning systems to improve materials locating processes on industrial projects
-
10.1061/(ASCE)0733-9364(2006)132:7(741)
-
Caldas, C., Torrent, D., and Haas, C. (2006). " Using global positioning systems to improve materials locating processes on industrial projects.." J. Constr. Eng. Manage., 132 (7), 741-749. 10.1061/(ASCE)0733- 9364(2006)132:7(741)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.7
, pp. 741-749
-
-
Caldas, C.1
Torrent, D.2
Haas, C.3
-
6
-
-
67651209248
-
Attracting and maintaining a skilled construction work force
-
Construction Industry Institute.. Attract/maintain skilled work force research team
-
Construction Industry Institute. (2000). Attract/maintain skilled work force research team, " Attracting and maintaining a skilled construction work force.." Research Summary 135-1.
-
(2000)
Research Summary
, pp. 135-141
-
-
-
8
-
-
33646197492
-
Firm performance and information technology utilization in the construction industry
-
10.1061/(ASCE)0733-9364(2006)132:5(499)
-
El-Mashaleh, M., O'Brien, W. J., and Minchin, R. E. (2006). " Firm performance and information technology utilization in the construction industry.." J. Constr. Eng. Manage., 132 (5), 499-507. 10.1061/(ASCE)0733- 9364(2006)132:5(499)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 499-507
-
-
El-Mashaleh, M.1
O'brien, W.J.2
Minchin, R.E.3
-
9
-
-
33846821572
-
Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
-
Ergen, E., Akinci, B., and Sacks, R. (2007). " Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS.." Autom. Constr., 16 (3), 354-367.
-
(2007)
Autom. Constr.
, vol.16
, Issue.3
, pp. 354-367
-
-
Ergen, E.1
Akinci, B.2
Sacks, R.3
-
10
-
-
2342443555
-
Partial factor productivity and equipment technology change at the activity level in the U.S. construction industry
-
10.1061/(ASCE)0733-9364(2002)128:6(463)
-
Goodrum, P., and Haas, C. (2002). " Partial factor productivity and equipment technology change at the activity level in the U.S. construction industry.." J. Constr. Eng. Manage., 128 (6), 463-472. 10.1061/(ASCE)0733- 9364(2002)128:6(463)
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.6
, pp. 463-472
-
-
Goodrum, P.1
Haas, C.2
-
11
-
-
13944271409
-
The long-term impact of equipment technology on labor productivity in the U. S. construction industry at the activity level
-
10.1061/(ASCE)0733-9364(2004)130:1(124)
-
Goodrum, P., and Haas, C. (2004). " The long-term impact of equipment technology on labor productivity in the U. S. construction industry at the activity level.." J. Constr. Eng. Manage., 130 (1), 124-133. 10.1061/(ASCE)0733-9364(2004)130:1(124)
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.1
, pp. 124-133
-
-
Goodrum, P.1
Haas, C.2
-
12
-
-
62549118247
-
The relationship between changes in material technology and construction productivity
-
10.1061/(ASCE)0733-9364(2009)135:4(278).
-
Goodrum, P., Zhai, D., and Yasin, M. (2009). " The relationship between changes in material technology and construction productivity.." J. Constr. Eng. Manage., 135 (4), 278-287 10.1061/(ASCE)0733-9364(2009)135:4(278).
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.4
, pp. 278-287
-
-
Goodrum, P.1
Zhai, D.2
Yasin, M.3
-
13
-
-
2342432839
-
-
Research Re No. 106-11, Construction Industry Institute (CII), Austin, Tex
-
Griffis, F. H., Hogan, D. B., and Li, W. (1995). " An analysis of the impacts of using three dimensional computer models in the management of construction.." Research Rep. No. 106-11, Construction Industry Institute (CII), Austin, Tex.
-
(1995)
An Analysis of the Impacts of Using three Dimensional Computer Models in the Management of Construction
-
-
Griffis, F.H.1
Hogan, D.B.2
Li, W.3
-
14
-
-
0003585297
-
-
Morgan Kaufman Publishers, San Francisco, Calif
-
Han, J., Kamber, M. (2000). Data mining: Concepts and techniques, Morgan Kaufman Publishers, San Francisco, Calif.
-
(2000)
Data Mining: Concepts and Techniques
-
-
Han, J.1
Kamber, M.2
-
16
-
-
0018663078
-
Productivity and technology in construction
-
Koch, J., and Moavenzadeh, F. (1979). " Productivity and technology in construction.." J. Constr. Div., 105 (4), 351-366.
-
(1979)
J. Constr. Div.
, vol.105
, Issue.4
, pp. 351-366
-
-
Koch, J.1
Moavenzadeh, F.2
-
17
-
-
0032823915
-
Information technology and its impact on productivity: Firm-level evidence from government and private data sources, 1977-1993
-
Lehr, B., and Lichtenberg, F. (1999). " Information technology and its impact on productivity: Firm-level evidence from government and private data sources, 1977-1993.." Can. J. Econ., 32 (2), 335-362.
-
(1999)
Can. J. Econ.
, vol.32
, Issue.2
, pp. 335-362
-
-
Lehr, B.1
Lichtenberg, F.2
-
18
-
-
13944258129
-
Project performance versus use of technologies at project and phase levels
-
10.1061/(ASCE)0733-9364(2004)130:3(322)
-
O'Connor, J. T., and Yang, L. (2004). " Project performance versus use of technologies at project and phase levels.." J. Constr. Eng. Manage., 130 (3), 322-329. 10.1061/(ASCE)0733-9364(2004)130:3(322)
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.3
, pp. 322-329
-
-
O'connor, J.T.1
Yang, L.2
-
19
-
-
23044480215
-
Benchmarking of construction productivity
-
10.1061/(ASCE)0733-9364(2005)131:7(772)
-
Park, H., Thomas, S., and Tucker, R. (2005). " Benchmarking of construction productivity.." J. Constr. Eng. Manage., 131 (7), 772-778. 10.1061/(ASCE)0733-9364(2005)131:7(772)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.7
, pp. 772-778
-
-
Park, H.1
Thomas, S.2
Tucker, R.3
-
20
-
-
0026228851
-
Services under siege-The restructuring imperative
-
September-October
-
Roach, S. (1991). " Services under siege-The restructuring imperative.." Harvard Business Review 68, (September-October) 82-91.
-
(1991)
Harvard Business Review 68
, pp. 82-91
-
-
Roach, S.1
-
21
-
-
0003286176
-
Is construction technologically stagnant?
-
Lange, J. and Mills, D., eds., Lexington Books, Lexington, Mass
-
Rosefielde, S., and Mills, D. (1979). " Is construction technologically stagnant? ", Lange, J., and, Mills, D., eds., The construction industry: Balance wheel of the economy, Lexington Books, Lexington, Mass.
-
(1979)
The Construction Industry: Balance Wheel of the Economy
-
-
Rosefielde, S.1
Mills, D.2
-
25
-
-
0038897362
-
Information technology and the U. S. productivity revival: What do the industry data say?
-
10.1257/000282802762024638
-
Stiroh, K. J. (2002). " Information technology and the U. S. productivity revival: What do the industry data say? " Am. Econ. Rev., 92 (5), 1559-1576. 10.1257/000282802762024638
-
(2002)
Am. Econ. Rev.
, vol.92
, Issue.5
, pp. 1559-1576
-
-
Stiroh, K.J.1
-
26
-
-
13944258130
-
Impacts of design/information technology on project outcomes
-
10.1061/(ASCE)0733-9364(2004)130:4(586)
-
Thomas, S., Lee, S., Spencer, J., Tucker, R., and Chapman, R. (2004). " Impacts of design/information technology on project outcomes.." J. Constr. Eng. Manage., 130 (4), 586-597. 10.1061/(ASCE)0733-9364(2004)130:4(586)
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.4
, pp. 586-597
-
-
Thomas, S.1
Lee, S.2
Spencer, J.3
Tucker, R.4
Chapman, R.5
|