메뉴 건너뛰기




Volumn 135, Issue 8, 2009, Pages 746-753

Relationship between automation and integration of construction information systems and labor productivity

Author keywords

Automation; Construction management; Information technology (IT); Labor; Productivity

Indexed keywords

APPLICATION SPECIFIC; CONSTRUCTION INDUSTRY INSTITUTES; CONSTRUCTION INFORMATION; CONSTRUCTION MANAGEMENT; CONSTRUCTION PRODUCTIVITY; CONSTRUCTION PROJECTS; INDUSTRIAL CONSTRUCTION; IT APPLICATIONS; IT IN CONSTRUCTION; LABOR; LABOR PRODUCTIVITY; OVERALL COSTS; PROJECT PERFORMANCE; STRUCTURAL STEELS;

EID: 67651207819     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000024     Document Type: Article
Times cited : (54)

References (27)
  • 1
    • 0029496983 scopus 로고
    • Quantifying process benefits of electronic data management technologies
    • 10.1061/(ASCE)0733-9364(1995)121:4(415)
    • Back, W., and Bell, L. (1995). " Quantifying process benefits of electronic data management technologies.." J. Constr. Eng. Manage., 121 (4), 415-421. 10.1061/(ASCE)0733-9364(1995)121:4(415)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 415-421
    • Back, W.1    Bell, L.2
  • 3
    • 0027883457 scopus 로고
    • The productivity paradox of information technology
    • 10.1145/163298.163309
    • Brynjolfsson, E. (1993). " The productivity paradox of information technology.." Commun. ACM, 36 (12), 67-77. 10.1145/163298.163309
    • (1993) Commun. ACM , vol.36 , Issue.12 , pp. 67-77
    • Brynjolfsson, E.1
  • 4
    • 0346788758 scopus 로고    scopus 로고
    • Paradox lost? Firm-level evidence on the returns to information systems spending
    • Brynjolfsson, E., and Hitt, L. (1996). " Paradox lost? Firm-level evidence on the returns to information systems spending.." Manage. Sci., 42 (4), 541-558.
    • (1996) Manage. Sci. , vol.42 , Issue.4 , pp. 541-558
    • Brynjolfsson, E.1    Hitt, L.2
  • 5
    • 33745325795 scopus 로고    scopus 로고
    • Using global positioning systems to improve materials locating processes on industrial projects
    • 10.1061/(ASCE)0733-9364(2006)132:7(741)
    • Caldas, C., Torrent, D., and Haas, C. (2006). " Using global positioning systems to improve materials locating processes on industrial projects.." J. Constr. Eng. Manage., 132 (7), 741-749. 10.1061/(ASCE)0733- 9364(2006)132:7(741)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.7 , pp. 741-749
    • Caldas, C.1    Torrent, D.2    Haas, C.3
  • 6
    • 67651209248 scopus 로고    scopus 로고
    • Attracting and maintaining a skilled construction work force
    • Construction Industry Institute.. Attract/maintain skilled work force research team
    • Construction Industry Institute. (2000). Attract/maintain skilled work force research team, " Attracting and maintaining a skilled construction work force.." Research Summary 135-1.
    • (2000) Research Summary , pp. 135-141
  • 8
    • 33646197492 scopus 로고    scopus 로고
    • Firm performance and information technology utilization in the construction industry
    • 10.1061/(ASCE)0733-9364(2006)132:5(499)
    • El-Mashaleh, M., O'Brien, W. J., and Minchin, R. E. (2006). " Firm performance and information technology utilization in the construction industry.." J. Constr. Eng. Manage., 132 (5), 499-507. 10.1061/(ASCE)0733- 9364(2006)132:5(499)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 499-507
    • El-Mashaleh, M.1    O'brien, W.J.2    Minchin, R.E.3
  • 9
    • 33846821572 scopus 로고    scopus 로고
    • Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
    • Ergen, E., Akinci, B., and Sacks, R. (2007). " Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS.." Autom. Constr., 16 (3), 354-367.
    • (2007) Autom. Constr. , vol.16 , Issue.3 , pp. 354-367
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 10
    • 2342443555 scopus 로고    scopus 로고
    • Partial factor productivity and equipment technology change at the activity level in the U.S. construction industry
    • 10.1061/(ASCE)0733-9364(2002)128:6(463)
    • Goodrum, P., and Haas, C. (2002). " Partial factor productivity and equipment technology change at the activity level in the U.S. construction industry.." J. Constr. Eng. Manage., 128 (6), 463-472. 10.1061/(ASCE)0733- 9364(2002)128:6(463)
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.6 , pp. 463-472
    • Goodrum, P.1    Haas, C.2
  • 11
    • 13944271409 scopus 로고    scopus 로고
    • The long-term impact of equipment technology on labor productivity in the U. S. construction industry at the activity level
    • 10.1061/(ASCE)0733-9364(2004)130:1(124)
    • Goodrum, P., and Haas, C. (2004). " The long-term impact of equipment technology on labor productivity in the U. S. construction industry at the activity level.." J. Constr. Eng. Manage., 130 (1), 124-133. 10.1061/(ASCE)0733-9364(2004)130:1(124)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.1 , pp. 124-133
    • Goodrum, P.1    Haas, C.2
  • 12
    • 62549118247 scopus 로고    scopus 로고
    • The relationship between changes in material technology and construction productivity
    • 10.1061/(ASCE)0733-9364(2009)135:4(278).
    • Goodrum, P., Zhai, D., and Yasin, M. (2009). " The relationship between changes in material technology and construction productivity.." J. Constr. Eng. Manage., 135 (4), 278-287 10.1061/(ASCE)0733-9364(2009)135:4(278).
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.4 , pp. 278-287
    • Goodrum, P.1    Zhai, D.2    Yasin, M.3
  • 15
    • 67651227813 scopus 로고    scopus 로고
    • Impacts of automation and integration technologies on project and company performance
    • Re No. GCR 06-900
    • Kang, Y., Thomas, S., and O'Brien, W. (2006). " Impacts of automation and integration technologies on project and company performance.." National Institute of Standards and Technology (NIST) Rep. No. GCR 06-900.
    • (2006) National Institute of Standards and Technology (NIST)
    • Kang, Y.1    Thomas, S.2    O'brien, W.3
  • 16
    • 0018663078 scopus 로고
    • Productivity and technology in construction
    • Koch, J., and Moavenzadeh, F. (1979). " Productivity and technology in construction.." J. Constr. Div., 105 (4), 351-366.
    • (1979) J. Constr. Div. , vol.105 , Issue.4 , pp. 351-366
    • Koch, J.1    Moavenzadeh, F.2
  • 17
    • 0032823915 scopus 로고    scopus 로고
    • Information technology and its impact on productivity: Firm-level evidence from government and private data sources, 1977-1993
    • Lehr, B., and Lichtenberg, F. (1999). " Information technology and its impact on productivity: Firm-level evidence from government and private data sources, 1977-1993.." Can. J. Econ., 32 (2), 335-362.
    • (1999) Can. J. Econ. , vol.32 , Issue.2 , pp. 335-362
    • Lehr, B.1    Lichtenberg, F.2
  • 18
    • 13944258129 scopus 로고    scopus 로고
    • Project performance versus use of technologies at project and phase levels
    • 10.1061/(ASCE)0733-9364(2004)130:3(322)
    • O'Connor, J. T., and Yang, L. (2004). " Project performance versus use of technologies at project and phase levels.." J. Constr. Eng. Manage., 130 (3), 322-329. 10.1061/(ASCE)0733-9364(2004)130:3(322)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 322-329
    • O'connor, J.T.1    Yang, L.2
  • 19
    • 23044480215 scopus 로고    scopus 로고
    • Benchmarking of construction productivity
    • 10.1061/(ASCE)0733-9364(2005)131:7(772)
    • Park, H., Thomas, S., and Tucker, R. (2005). " Benchmarking of construction productivity.." J. Constr. Eng. Manage., 131 (7), 772-778. 10.1061/(ASCE)0733-9364(2005)131:7(772)
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.7 , pp. 772-778
    • Park, H.1    Thomas, S.2    Tucker, R.3
  • 20
    • 0026228851 scopus 로고
    • Services under siege-The restructuring imperative
    • September-October
    • Roach, S. (1991). " Services under siege-The restructuring imperative.." Harvard Business Review 68, (September-October) 82-91.
    • (1991) Harvard Business Review 68 , pp. 82-91
    • Roach, S.1
  • 21
    • 0003286176 scopus 로고
    • Is construction technologically stagnant?
    • Lange, J. and Mills, D., eds., Lexington Books, Lexington, Mass
    • Rosefielde, S., and Mills, D. (1979). " Is construction technologically stagnant? ", Lange, J., and, Mills, D., eds., The construction industry: Balance wheel of the economy, Lexington Books, Lexington, Mass.
    • (1979) The Construction Industry: Balance Wheel of the Economy
    • Rosefielde, S.1    Mills, D.2
  • 25
    • 0038897362 scopus 로고    scopus 로고
    • Information technology and the U. S. productivity revival: What do the industry data say?
    • 10.1257/000282802762024638
    • Stiroh, K. J. (2002). " Information technology and the U. S. productivity revival: What do the industry data say? " Am. Econ. Rev., 92 (5), 1559-1576. 10.1257/000282802762024638
    • (2002) Am. Econ. Rev. , vol.92 , Issue.5 , pp. 1559-1576
    • Stiroh, K.J.1
  • 26
    • 13944258130 scopus 로고    scopus 로고
    • Impacts of design/information technology on project outcomes
    • 10.1061/(ASCE)0733-9364(2004)130:4(586)
    • Thomas, S., Lee, S., Spencer, J., Tucker, R., and Chapman, R. (2004). " Impacts of design/information technology on project outcomes.." J. Constr. Eng. Manage., 130 (4), 586-597. 10.1061/(ASCE)0733-9364(2004)130:4(586)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.4 , pp. 586-597
    • Thomas, S.1    Lee, S.2    Spencer, J.3    Tucker, R.4    Chapman, R.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.