메뉴 건너뛰기




Volumn , Issue , 2008, Pages

Modeling the repair process of a power distribution system

Author keywords

Maintenance; Power distribution reliability; Reliability modeling

Indexed keywords

FAILURE PROCESS; HOMOGENEOUS POISSON PROCESS; MEAN WAITING TIME; MONTE CARLO SIMULATION; MONTE CARLO SIMULATION METHODS; OPTIMAL SCHEDULING; POINT PROCESS; POWER DISTRIBUTION RELIABILITY; POWER DISTRIBUTION SYSTEM; QUEUING THEORY; RELIABILITY INDEX; RELIABILITY MODELING; REMEDIAL ACTIONS; REPAIR PROCESS; SERVICE RELIABILITY;

EID: 67650496388     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/TDC-LA.2008.4641852     Document Type: Conference Paper
Times cited : (34)

References (28)
  • 1
    • 0025411288 scopus 로고
    • The economic aspect of reliability in distribution system planning
    • Kjolle G, Rolfsegn L, Dahl E, "The economic aspect of reliability in distribution system planning", IEEE Trans. Power Delivery, Vol. 5, No. 2,1990.
    • (1990) IEEE Trans. Power Delivery , vol.5 , Issue.2
    • Kjolle, G.1    Rolfsegn, L.2    Dahl, E.3
  • 3
    • 0032072859 scopus 로고    scopus 로고
    • An integrated framework for managing emergency-response logistics: The case of the electric utility companies
    • May
    • Zografos K. G, Doulgeris C, Tsoumpas P, "An integrated framework for managing emergency-response logistics: the case of the electric utility companies", IEEE Transactions on Engineering Management, vol. 45, May, 1998.
    • (1998) IEEE Transactions on Engineering Management , vol.45
    • Zografos, K.G.1    Doulgeris, C.2    Tsoumpas, P.3
  • 9
    • 0026854269 scopus 로고
    • RELRAD - An analytical approach for distribution system reliability assessment
    • Kjolle G, Sand K, "RELRAD - An analytical approach for distribution system reliability assessment", IEEE Transactions on Power Delivery, Vol. 7, No.2, 1992.
    • (1992) IEEE Transactions on Power Delivery , vol.7 , Issue.2
    • Kjolle, G.1    Sand, K.2
  • 12
    • 0032682344 scopus 로고    scopus 로고
    • Teaching distribution system reliability evaluation using Monte Carlo simulation
    • Billinton, R., Wang Peng, "Teaching distribution system reliability evaluation using Monte Carlo simulation", IEEE Transactions on Power Systems, Vol. 14, No.2, 1999.
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.2
    • Billinton, R.1    Peng, W.2
  • 13
    • 67650385448 scopus 로고    scopus 로고
    • Zapata C. J, Montealegre P. A, Technical problems on the quality of electricity service, Revista Mundo Eléctrico, No. 68, 2007. (In Spanish).
    • Zapata C. J, Montealegre P. A, "Technical problems on the quality of electricity service", Revista Mundo Eléctrico, No. 68, 2007. (In Spanish).
  • 15
    • 0032255230 scopus 로고    scopus 로고
    • Spurious exponentially observed when incorrectly fitting a distribution to nonstationary data
    • December
    • Ascher H. E, Hansen C. K, "Spurious exponentially observed when incorrectly fitting a distribution to nonstationary data", IEEE Transactions on Reliability, Vol. 47, No.4, December 1998.
    • (1998) IEEE Transactions on Reliability , vol.47 , Issue.4
    • Ascher, H.E.1    Hansen, C.K.2
  • 20
    • 0026837006 scopus 로고
    • Goodness-of-fit tests for the power law process
    • March
    • Park W. J, Kim Y. G, "Goodness-of-fit tests for the power law process", IEEE Transactions on Reliability, Vol. 41, No.1, March 1992.
    • (1992) IEEE Transactions on Reliability , vol.41 , Issue.1
    • Park, W.J.1    Kim, Y.G.2
  • 21
    • 0028446682 scopus 로고
    • More goodness-of-fit tests for the power law process
    • June
    • Park W. J, Kim Y. G, "More goodness-of-fit tests for the power law process", IEEE Transactions on Reliability, Vol. 43, No.2, June 1994.
    • (1994) IEEE Transactions on Reliability , vol.43 , Issue.2
    • Park, W.J.1    Kim, Y.G.2
  • 22
    • 0026995128 scopus 로고
    • Goodness-of-fit tests for the power law process based on the TTT plot
    • December
    • Klefsjo B, Kumar U, "Goodness-of-fit tests for the power law process based on the TTT plot", IEEE Transactions on Reliability, Vol. 41, No. 4, December 1992.
    • (1992) IEEE Transactions on Reliability , vol.41 , Issue.4
    • Klefsjo, B.1    Kumar, U.2
  • 25
    • 33947301253 scopus 로고    scopus 로고
    • Sequential Probabilistic Methods for Power System Operation and Planning
    • CIGRE Task Force, Aug
    • CIGRE Task Force, "Sequential Probabilistic Methods for Power System Operation and Planning", Electra, No. 179, pp. 69-97, Aug. 1998.
    • (1998) Electra , Issue.179 , pp. 69-97
  • 26
    • 67650461466 scopus 로고    scopus 로고
    • Assessing the performace of the repair process of a power distribution system
    • Universidad Tecnológica de Pereira, Available:, in Spanish
    • Zapata C. J, Burbano O. L, Silva S. C, "Assessing the performace of the repair process of a power distribution system", Revista Scientia et Thecnica, No.37, Universidad Tecnológica de Pereira, 2007. Available: http://www.utp.edu.co. (in Spanish).
    • (2007) Revista Scientia et Thecnica , Issue.37
    • Zapata, C.J.1    Burbano, O.L.2    Silva, S.C.3
  • 28
    • 67650455440 scopus 로고    scopus 로고
    • Hernández J. A, Study of the repair process of the power distribution system in the San Juan de Pasto Municipality, Universidad de los Andes, 2008.
    • Hernández J. A, "Study of the repair process of the power distribution system in the San Juan de Pasto Municipality", Universidad de los Andes, 2008.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.