-
3
-
-
33845654063
-
Hydrologic applications of MRAN algorithm
-
Amenu, G. G., Markus, M., Kumar, P. and Demissie, M. (2007) Hydrologic applications of MRAN algorithm. ASCE Journal of Hydrologic Engineering, 12:1, pp. 124-129.
-
(2007)
ASCE Journal of Hydrologic Engineering
, vol.12
, Issue.1
, pp. 124-129
-
-
Amenu, G.G.1
Markus, M.2
Kumar, P.3
Demissie, M.4
-
4
-
-
34250658949
-
Application of support vector machines in assessing conceptual cost estimates
-
An, S., Park, U., Kang, K., Cho, M. and Cho, H. (2007) Application of support vector machines in assessing conceptual cost estimates. ASCE Journal of Computing in Civil Engineering, 21:4, pp. 259-264.
-
(2007)
ASCE Journal of Computing in Civil Engineering
, vol.21
, Issue.4
, pp. 259-264
-
-
An, S.1
Park, U.2
Kang, K.3
Cho, M.4
Cho, H.5
-
5
-
-
26644445248
-
Predicting the outcome of construction litigation using boosted decision trees
-
Arditi, D. and Pulket, T. (2005) Predicting the outcome of construction litigation using boosted decision trees. ASCE Journal of Computing in Civil Engineering, 19:4, pp. 387-393.
-
(2005)
ASCE Journal of Computing in Civil Engineering
, vol.19
, Issue.4
, pp. 387-393
-
-
Arditi, D.1
Pulket, T.2
-
6
-
-
0033156950
-
A comparison of case-based reasoning and artificial neural networks
-
Arditi, D. and Tokdemir, O. B. (1999) A comparison of case-based reasoning and artificial neural networks. ASCE Journal of Computing in Civil Engineering, 13:3, pp. 162-169.
-
(1999)
ASCE Journal of Computing in Civil Engineering
, vol.13
, Issue.3
, pp. 162-169
-
-
Arditi, D.1
Tokdemir, O.B.2
-
7
-
-
67650337208
-
Analysis of construction claims that lead to litigation
-
St Petersburg, Russia
-
Arditi, D., Tunca, A. A. and Yuyan, R. (1995) Analysis of construction claims that lead to litigation. Proceedings of the International Symposium on Modern Project Management, the International Project Management Association and Russian Project Management Association, St Petersburg, Russia
-
(1995)
Proceedings of the International Symposium on Modern Project Management, the International Project Management Association and Russian Project Management Association
-
-
Arditi, D.1
Tunca, A.A.2
Yuyan, R.3
-
8
-
-
0032024157
-
Predicting the outcome of construction litigation using neural networks
-
Arditi, D., Oksay, F. E. and Tokdemir, O. B. (1998) Predicting the outcome of construction litigation using neural networks. Computer-Aided Civil and Infrastructure Engineering, 13:2, pp. 75-81.
-
(1998)
Computer-Aided Civil and Infrastructure Engineering
, vol.13
, Issue.2
, pp. 75-81
-
-
Arditi, D.1
Oksay, F.E.2
Tokdemir, O.B.3
-
9
-
-
34248524667
-
Decision-support system for the rehabilitation of deteriorating sewers
-
Bairaktaris, D., Delis, V., Emmanouilidis, C., Frondistou-Yannas, C., Gratsias, K., Kallidromitis, V. and Rerras, N. (2007) Decision-support system for the rehabilitation of deteriorating sewers. Journal of Performance of Constructed Facilities, 21:3, pp. 240-248.
-
(2007)
Journal of Performance of Constructed Facilities
, vol.21
, Issue.3
, pp. 240-248
-
-
Bairaktaris, D.1
Delis, V.2
Emmanouilidis, C.3
Frondistou-Yannas, C.4
Gratsias, K.5
Kallidromitis, V.6
Rerras, N.7
-
10
-
-
0003492070
-
-
Oxford University Press, New York
-
Bonabeau, E., Dorigo, M. and Theraulaz, G. (1999) Swarm Intelligence: From Natural to Artificial System, Oxford University Press, New York
-
(1999)
Swarm Intelligence: From Natural to Artificial System
-
-
Bonabeau, E.1
Dorigo, M.2
Theraulaz, G.3
-
11
-
-
0033721664
-
Project dispute resolution satisfaction classification through neural network
-
Cheung, S. O., Tam, C. M. and Harris, F. C. (2000) Project dispute resolution satisfaction classification through neural network. ASCE Journal of Management in Engineering, 16:1, pp. 70-79.
-
(2000)
ASCE Journal of Management in Engineering
, vol.16
, Issue.1
, pp. 70-79
-
-
Cheung, S.O.1
Tam, C.M.2
Harris, F.C.3
-
12
-
-
23044467858
-
Fuzzy neural network model for hydrologic flow routing
-
Deka, P. and Chandramouli, V. (2005) Fuzzy neural network model for hydrologic flow routing. ASCE Journal of Hydrologic Engineering, 10:4, pp. 302-314.
-
(2005)
ASCE Journal of Hydrologic Engineering
, vol.10
, Issue.4
, pp. 302-314
-
-
Deka, P.1
Chandramouli, V.2
-
13
-
-
33750697612
-
Gene-CBR: A case-based reasoning tool for cancer diagnosis using microarray datasets
-
Diaz, F., Fdez-Riverola, F. and Corchado, J. M. (2006) Gene-CBR: A case-based reasoning tool for cancer diagnosis using microarray datasets. Computational Intelligence, 22:3, pp. 254-268.
-
(2006)
Computational Intelligence
, vol.22
, Issue.3
, pp. 254-268
-
-
Diaz, F.1
Fdez-Riverola, F.2
Corchado, J.M.3
-
15
-
-
33748765247
-
Determining attribute weights in a CBR model for early cost prediction of structural systems
-
Dogan, S. Z., Arditi, D. and Gunaydin, H. M. (2006) Determining attribute weights in a CBR model for early cost prediction of structural systems. ASCE Journal of Construction Engineering and Management, 132:10, pp. 1092-1098.
-
(2006)
ASCE Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1092-1098
-
-
Dogan, S.Z.1
Arditi, D.2
Gunaydin, H.M.3
-
16
-
-
0030082551
-
The ant system: Optimization by a colony of cooperating agents
-
Dorigo, M., Colorni, A. and Maniezzo, V. (1996) The ant system: optimization by a colony of cooperating agents. IEEE Transactions on Systems, Man, and Cybernetics: Part B, 26:1, pp. 1-13.
-
(1996)
IEEE Transactions on Systems, Man, and Cybernetics: Part B
, vol.26
, Issue.1
, pp. 1-13
-
-
Dorigo, M.1
Colorni, A.2
Maniezzo, V.3
-
17
-
-
18744384412
-
Prediction of engineering performance: A neurofuzzy approach
-
Georgy, M. E., Chang, L. and Zhang, L. (2005) Prediction of engineering performance: A neurofuzzy approach. ASCE Journal of Construction Engineering and Management, 131:5, pp. 548-557.
-
(2005)
ASCE Journal of Construction Engineering and Management
, vol.131
, Issue.5
, pp. 548-557
-
-
Georgy, M.E.1
Chang, L.2
Zhang, L.3
-
18
-
-
11344291763
-
Bayesian neural network analysis of undrained side resistance of drilled shafts
-
Goh, A. T. C., Kulhawy, F. H. and Chua, C. G. (2005) Bayesian neural network analysis of undrained side resistance of drilled shafts. ASCE Journal of Geotechnical and Geoenvironmental Engineering, 131:1, pp. 84-93.
-
(2005)
ASCE Journal of Geotechnical and Geoenvironmental Engineering
, vol.131
, Issue.1
, pp. 84-93
-
-
Goh, A.T.C.1
Kulhawy, F.H.2
Chua, C.G.3
-
19
-
-
0000836083
-
Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector
-
Goh, B. H. (2000) Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector. Construction Management and Economics, 18:1, pp. 209-217.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.1
, pp. 209-217
-
-
Goh, B.H.1
-
20
-
-
33646696572
-
Prediction of concrete strength using neural-expert system
-
Gupta, R., Kewalramani, M. A. and Goel, A. (2006) Prediction of concrete strength using neural-expert system. ASCE Journal of Materials in Civil Engineering, 18:3, pp. 462-466.
-
(2006)
ASCE Journal of Materials in Civil Engineering
, vol.18
, Issue.3
, pp. 462-466
-
-
Gupta, R.1
Kewalramani, M.A.2
Goel, A.3
-
22
-
-
27944497806
-
A hybrid classification tree for products of complicated machines in flexible manufacturing systems
-
Horng, S. and Lin, S. (2005) A hybrid classification tree for products of complicated machines in flexible manufacturing systems. IEEE International Conference on Systems, Man and Cybernetics, 4, pp. 3775-3780.
-
(2005)
IEEE International Conference on Systems, Man and Cybernetics
, vol.4
, pp. 3775-3780
-
-
Horng, S.1
Lin, S.2
-
23
-
-
33748784871
-
Conflict resolution in construction disputes using the graph model
-
Kassab, M., Hipel, K. and Hegazy, T. (2006) Conflict resolution in construction disputes using the graph model. ASCE Journal of Construction Engineering and Management, 132:10, pp. 1043-1052.
-
(2006)
ASCE Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1043-1052
-
-
Kassab, M.1
Hipel, K.2
Hegazy, T.3
-
24
-
-
33645864343
-
Application of support vector machine in lake water level prediction
-
Khan, M. S. and Coulibaly, P. (2006) Application of support vector machine in lake water level prediction. ASCE Journal of Hydrologic Engineering, 11:3, pp. 199-205.
-
(2006)
ASCE Journal of Hydrologic Engineering
, vol.11
, Issue.3
, pp. 199-205
-
-
Khan, M.S.1
Coulibaly, P.2
-
25
-
-
24944560556
-
Construction litigation for the U.S. naval facilities engineering command, 1982-2002
-
Kilian, J. J. and Gibson, G. E. (2005) Construction litigation for the U.S. naval facilities engineering command, 1982-2002. ASCE Journal of Construction Engineering and Management, 131:9, pp. 945-952.
-
(2005)
ASCE Journal of Construction Engineering and Management
, vol.131
, Issue.9
, pp. 945-952
-
-
Kilian, J.J.1
Gibson, G.E.2
-
26
-
-
18144382336
-
Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates
-
Kim, G. H., Seo, D. S. and Kang, K. I. (2005) Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates. ASCE Journal of Computing in Civil Engineering, 19:2, pp. 208-211.
-
(2005)
ASCE Journal of Computing in Civil Engineering
, vol.19
, Issue.2
, pp. 208-211
-
-
Kim, G.H.1
Seo, D.S.2
Kang, K.I.3
-
27
-
-
34547116654
-
Adaptive neurofuzzy computing technique for evapotranspiration estimation
-
Kisi, O. and Ozturk, O. (2007) Adaptive neurofuzzy computing technique for evapotranspiration estimation. ASCE Journal of Irrigation and Drainage Engineering, 133:4, pp. 368-379.
-
(2007)
ASCE Journal of Irrigation and Drainage Engineering
, vol.133
, Issue.4
, pp. 368-379
-
-
Kisi, O.1
Ozturk, O.2
-
28
-
-
67650340356
-
A study of cross validation and bootstrap for accuracy estimation and model selection
-
Kovahi, H. (1995) A study of cross validation and bootstrap for accuracy estimation and model selection.
-
(1995)
-
-
Kovahi, H.1
-
29
-
-
33745276242
-
Prediction of soil composition from CPT data using general regression neural network
-
Kurup, P. U. and Griffin, E. P. (2006) Prediction of soil composition from CPT data using general regression neural network. ASCE Journal of Computing in Civil Engineering, 20:4, pp. 281-289.
-
(2006)
ASCE Journal of Computing in Civil Engineering
, vol.20
, Issue.4
, pp. 281-289
-
-
Kurup, P.U.1
Griffin, E.P.2
-
30
-
-
84871228346
-
-
Lawrence, S., Giles, C. L., Tsoi, A. C. and Back, A. D. (1997) Face recognition: A convolutional neural network approach.
-
(1997)
Face Recognition: A Convolutional Neural Network Approach
-
-
Lawrence, S.1
Giles, C.L.2
Tsoi, A.C.3
Back, A.D.4
-
31
-
-
0032673239
-
ANN-based mark-up estimation system with self-explanatory capacities
-
Li, H., Shen, L. Y. and Love, P. E. D. (1999) ANN-based mark-up estimation system with self-explanatory capacities. ASCE Journal of Construction Engineering and Management, 125:3, pp. 185-189.
-
(1999)
ASCE Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 185-189
-
-
Li, H.1
Shen, L.Y.2
Love, P.E.D.3
-
32
-
-
0000278680
-
Novel hybrid classification method employing Bayesian networks
-
Mello, K. L. and Brown, S. D. (1999) Novel hybrid classification method employing Bayesian networks. Journal of Chemometrics, 13:6, pp. 579-590.
-
(1999)
Journal of Chemometrics
, vol.13
, Issue.6
, pp. 579-590
-
-
Mello, K.L.1
Brown, S.D.2
-
34
-
-
79952785777
-
An empirical comparison of pruning methods for decision tree induction
-
Mingers, J. (1989) An empirical comparison of pruning methods for decision tree induction. Machine Learning, 4, pp. 227-243.
-
(1989)
Machine Learning
, vol.4
, pp. 227-243
-
-
Mingers, J.1
-
35
-
-
33746187876
-
Prediction of onset of corrosion in concrete bridge decks using neural networks and case-based reasoning
-
Morcous, G. and Lounis, Z. (2005) Prediction of onset of corrosion in concrete bridge decks using neural networks and case-based reasoning. Computer-Aided Civil and Infrastructure Engineering, 20:2, pp. 108-117.
-
(2005)
Computer-Aided Civil and Infrastructure Engineering
, vol.20
, Issue.2
, pp. 108-117
-
-
Morcous, G.1
Lounis, Z.2
-
36
-
-
33747348664
-
Case-based reasoning model for international market selection
-
Ozorhon, B., Dikmen, I. and Birgonul, M. T. (2006) Case-based reasoning model for international market selection. ASCE Journal of Construction Engineering and Management, 132:9, pp. 940-948.
-
(2006)
ASCE Journal of Construction Engineering and Management
, vol.132
, Issue.9
, pp. 940-948
-
-
Ozorhon, B.1
Dikmen, I.2
Birgonul, M.T.3
-
37
-
-
33845600932
-
Cluster-based hydrologic prediction using genetic algorithm-trained neural networks
-
Parasuraman, K. and Elshorbagy, A. (2007) Cluster-based hydrologic prediction using genetic algorithm-trained neural networks. ASCE Journal of Hydrologic Engineering, 12:1, pp. 52-62.
-
(2007)
ASCE Journal of Hydrologic Engineering
, vol.12
, Issue.1
, pp. 52-62
-
-
Parasuraman, K.1
Elshorbagy, A.2
-
38
-
-
2442428336
-
An ant colony algorithm for classification rule discovery
-
Idea Group Publishing, Hershey, PA
-
Parpinelli, R. S., Lopes, H. S. and Freitas, A. (2002) An ant colony algorithm for classification rule discovery. Data Mining: A Heuristic Approach, pp. 191-208. Idea Group Publishing, Hershey, PA
-
(2002)
Data Mining: A Heuristic Approach
, pp. 191-208
-
-
Parpinelli, R.S.1
Lopes, H.S.2
Freitas, A.3
-
40
-
-
33745302183
-
-
Prentice Hall, Boston, MA
-
Pena-Mora, F., Sosa, C. E. and McCone, D. S. (2003) Introduction to Construction Dispute Resolution, Prentice Hall, Boston, MA
-
(2003)
Introduction to Construction Dispute Resolution
-
-
Pena-Mora, F.1
Sosa, C.E.2
McCone, D.S.3
-
41
-
-
33744584654
-
Induction of decision trees
-
Quinlan, J. R. (1986) Induction of decision trees. Machine Learning, 1:1, pp. 81-106.
-
(1986)
Machine Learning
, vol.1
, Issue.1
, pp. 81-106
-
-
Quinlan, J.R.1
-
42
-
-
85023557988
-
Unknown attribute values in induction
-
December, Morgan Kaufmann, San Mateo, CA
-
Quinlan, J. R. (1989) Unknown attribute values in induction. Proceedings of the Sixth International Machine Learning Workshop, pp. 164-168. December, Morgan Kaufmann, San Mateo, CA
-
(1989)
Proceedings of the Sixth International Machine Learning Workshop
, pp. 164-168
-
-
Quinlan, J.R.1
-
44
-
-
16444379769
-
Multiagent system for construction claims negotiation
-
Ren, Z., Anumba, C. J. and Ugwu, O. O. (2003) Multiagent system for construction claims negotiation. ASCE Journal of Computing in Civil Engineering, 17:3, pp. 180-188.
-
(2003)
ASCE Journal of Computing in Civil Engineering
, vol.17
, Issue.3
, pp. 180-188
-
-
Ren, Z.1
Anumba, C.J.2
Ugwu, O.O.3
-
46
-
-
0037696402
-
Case-based reasoning for assessing intelligent transportation systems benefits
-
Sadek, A., Morse, S., Ivan, J. and El-Dessouki, W. (2003) Case-based reasoning for assessing intelligent transportation systems benefits. Computer-Aided Civil and Infrastructure Engineering, 18:3, pp. 173-183.
-
(2003)
Computer-Aided Civil and Infrastructure Engineering
, vol.18
, Issue.3
, pp. 173-183
-
-
Sadek, A.1
Morse, S.2
Ivan, J.3
El-Dessouki, W.4
-
48
-
-
84993044932
-
An application of case-based reasoning to the planning of highway bridge construction
-
Tah, J. H. M., Carr, V. and Howes, R. (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering Construction and Architectural Management, 5:4, pp. 327-338.
-
(1998)
Engineering Construction and Architectural Management
, vol.5
, Issue.4
, pp. 327-338
-
-
Tah, J.H.M.1
Carr, V.2
Howes, R.3
-
49
-
-
84993026805
-
Artificial neural networks model for predicting excavator productivity
-
Tam, C. M., Tong, T. K. L. and Tse, S. L. (2002) Artificial neural networks model for predicting excavator productivity. Engineering Construction and Architectural Management, 9:5, pp. 446-452.
-
(2002)
Engineering Construction and Architectural Management
, vol.9
, Issue.5
, pp. 446-452
-
-
Tam, C.M.1
Tong, T.K.L.2
Tse, S.L.3
-
50
-
-
33751081243
-
ANN and fuzzy logic models for simulating event-based rainfall-runoff
-
Tayfur, G. and Singh, V. P. (2006) ANN and fuzzy logic models for simulating event-based rainfall-runoff. ASCE Journal of Hydraulic Engineering, 132:12, pp. 1321-1330.
-
(2006)
ASCE Journal of Hydraulic Engineering
, vol.132
, Issue.12
, pp. 1321-1330
-
-
Tayfur, G.1
Singh, V.P.2
-
51
-
-
33751077286
-
Reliable real-time framework for short-term freeway travel time prediction
-
Van Lint, J. W. C. (2006) Reliable real-time framework for short-term freeway travel time prediction. ASCE Journal of Transportation Engineering, 132:12, pp. 921-932.
-
(2006)
ASCE Journal of Transportation Engineering
, vol.132
, Issue.12
, pp. 921-932
-
-
Van Lint, J.W.C.1
-
52
-
-
33747351253
-
Hybrid data mining/genetic shredding algorithm for reliability assessment of structural systems
-
Wang, J. and Ghosn, M. (2006) Hybrid data mining/genetic shredding algorithm for reliability assessment of structural systems. ASCE Journal of Structural Engineering, 132:9, pp. 1451-1460.
-
(2006)
ASCE Journal of Structural Engineering
, vol.132
, Issue.9
, pp. 1451-1460
-
-
Wang, J.1
Ghosn, M.2
-
53
-
-
34548018307
-
Knowledge-based treatment planning for adolescent early intervention of mental healthcare: A hybrid case-based reasoning approach
-
Wang, W. M., Cheung, C. F., Lee, W. B. and Kwok, S. K. (2007) Knowledge-based treatment planning for adolescent early intervention of mental healthcare: A hybrid case-based reasoning approach. Expert Systems, 24:4, pp. 232-251.
-
(2007)
Expert Systems
, vol.24
, Issue.4
, pp. 232-251
-
-
Wang, W.M.1
Cheung, C.F.2
Lee, W.B.3
Kwok, S.K.4
-
54
-
-
0003957032
-
-
Morgan Kaufmann, San Francisco, CA
-
Witten, I. H. and Frank, E. (2005) Data Mining, Practical Machine Learning Tools and Techniques, Morgan Kaufmann, San Francisco, CA
-
(2005)
Data Mining, Practical Machine Learning Tools and Techniques
-
-
Witten, I.H.1
Frank, E.2
-
55
-
-
0028547161
-
Developing a case-based knowledge system for AIDS prevention
-
Xu, L. D. (1994) Developing a case-based knowledge system for AIDS prevention. Expert Systems, 11:4, pp. 237-244.
-
(1994)
Expert Systems
, vol.11
, Issue.4
, pp. 237-244
-
-
Xu, L.D.1
-
56
-
-
33748805776
-
Logistic likelihood analysis of mediation outcomes
-
Yiu, T. W., Cheung, S. O. and Mok, F. M. (2006) Logistic likelihood analysis of mediation outcomes. ASCE Journal of Construction Engineering and Management, 132:10, pp. 1026-1036.
-
(2006)
ASCE Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1026-1036
-
-
Yiu, T.W.1
Cheung, S.O.2
Mok, F.M.3
|