-
1
-
-
84988287643
-
-
Air Force.., Air Force Directorate of Technical Support (USDTS), Air Force Civil Engineer Support Agency, Tyndall Air Force Base, Fla.
-
Air Force. (2005). Historical Air Force construction cost handbook, Air Force Directorate of Technical Support (USDTS), Air Force Civil Engineer Support Agency, Tyndall Air Force Base, Fla.
-
(2005)
Historical Air Force construction cost handbook
-
-
-
2
-
-
0004047083
-
-
Univ. of Reading, Reading, U.K.
-
Bennett, J., Pothecary, E., and Robinson, G. (1996). Designing and building a world-class industry, Univ. of Reading, Reading, U.K.
-
(1996)
Designing and building a world-class industry
-
-
Bennett, J.1
Pothecary, E.2
Robinson, G.3
-
3
-
-
67650005979
-
-
An empirical comparison of design-bid-build and design-build project delivery methods. Masters thesis, Univ. of Texas at Austin, Tex.
-
Hale, D. R. (2005). An empirical comparison of design-bid-build and design-build project delivery methods. Masters thesis, Univ. of Texas at Austin, Tex.
-
(2005)
-
-
Hale, D.R.1
-
4
-
-
33646019037
-
-
Stat Soft, Inc., Tulsa, Okla.
-
Hill, T., and Lewicki, P. (2006). StatisticsMethods and applications, Stat Soft, Inc., Tulsa, Okla.
-
(2006)
StatisticsMethods and applications
-
-
Hill, T.1
Lewicki, P.2
-
5
-
-
13944260870
-
Project delivery systems and project change: Quantitative analysis
-
".
-
Ibbs, W., Kwak, Y., Ng, T., and Odabasi, A. (2003). " Project delivery systems and project change: Quantitative analysis.." J. Constr. Eng. Manage., 129 (4), 382387.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 382387
-
-
Ibbs, W.1
Kwak, Y.2
Ng, T.3
Odabasi, A.4
-
6
-
-
0032207592
-
Comparison of U.S. project delivery systems
-
Konchar, M., and Sanvido, V. (1998). " Comparison of U.S. project delivery systems.." J. Constr. Eng. Manage., 124 (6), 435444.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 435444
-
-
Konchar, M.1
Sanvido, V.2
-
8
-
-
0033101744
-
Public-sector design/build evolution and performance
-
".
-
Molenaar, K., Songer, A., and Barash, M. (1999). " Public-sector design/build evolution and performance.." J. Manage. Eng., 15 (2), 5462.
-
(1999)
J. Manage. Eng.
, vol.15
, Issue.2
, pp. 5462
-
-
Molenaar, K.1
Songer, A.2
Barash, M.3
-
9
-
-
67650050243
-
-
An empirical analysis of United States Navy design/build contracts. Masters thesis, Univ. of Texas at Austin, Tex.
-
Roth, M. (1995). An empirical analysis of United States Navy design/build contracts. Masters thesis, Univ. of Texas at Austin, Tex.
-
(1995)
-
-
Roth, M.1
-
10
-
-
38349098646
-
Benchmarking of large design-build highway projects: One to one comparison and comparison with design-bid-build projects
-
".
-
Shrestha, P. P., Migliaccio, G. C., OConnor, J. T., and Gibson E. G., Jr. (2007). " Benchmarking of large design-build highway projects: One to one comparison and comparison with design-bid-build projects.." Transp. Res. Rec., 1994 (1), 1725.
-
(2007)
Transp. Res. Rec.
, vol.1994
, Issue.1
, pp. 1725
-
-
Shrestha, P.P.1
Migliaccio, G.C.2
Oconnor, J.T.3
Gibson Jr., E.G.4
-
11
-
-
67650024645
-
Selecting design-build: Public and private sector owner attitudes
-
Songer, A., and Molenaar, K. (1996). " Selecting design-build: Public and private sector owner attitudes.." J. Manage. Eng., 124 (6), 4753.
-
(1996)
J. Manage. Eng.
, vol.124
, Issue.6
, pp. 4753
-
-
Songer, A.1
Molenaar, K.2
-
12
-
-
0033355972
-
Alternative delivery approaches for military medical construction projects
-
Uhlik, F., and Eller, M. (1999). " Alternative delivery approaches for military medical construction projects.." J. Archit. Eng., 5 (4), 149155.
-
(1999)
J. Archit. Eng.
, vol.5
, Issue.4
, pp. 149155
-
-
Uhlik, F.1
Eller, M.2
-
13
-
-
84862868706
-
-
U.S. Department of Transportation, Federal Highway Administration.. "." (April 2, 2007).
-
U.S. Department of Transportation, Federal Highway Administration. (2006). " Design-build effectiveness study.." http://www.fhwa.dot.gov/ reports/designbuild/designbuild.pdf (April 2, 2007).
-
(2006)
Design-build effectiveness study
-
-
|