메뉴 건너뛰기




Volumn 19, Issue 1, 2006, Pages 79-86

A mathematical model of a multi-criteria parallel machine scheduling problem: A genetic algorithm

Author keywords

Earliness and tardiness penalties; Genetic algorithms; Machine costs; Multi criteria parallel machine scheduling

Indexed keywords

AIRFOILS; COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; GENETIC ALGORITHMS; HEURISTIC ALGORITHMS; HEURISTIC METHODS; MACHINERY; MATHEMATICAL OPERATORS; PARALLEL ALGORITHMS; SCHEDULING ALGORITHMS;

EID: 67649989609     PISSN: 17281431     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (13)
  • 1
    • 0033704095 scopus 로고    scopus 로고
    • Theory and methodology minimizing make-span subject to minimum total flow-time on identical parallel machines
    • Gupta, J. N. D. and Ruiz-Torres, A. J., "Theory and methodology minimizing make-span subject to minimum total flow-time on identical parallel machines", European Journal of Operational Research, Vol. 125, (2000), 370-380.
    • (2000) European Journal of Operational Research , vol.125 , pp. 370-380
    • Gupta, J.N.D.1    Ruiz-Torres, A.J.2
  • 2
    • 0033166361 scopus 로고    scopus 로고
    • Parallel machine scheduling with earliness and tardiness penalties
    • Sivrikaya-Serifoǧlu, F. and Ulusoy, G., "Parallel machine scheduling with earliness and tardiness penalties", Computers and Operations Research, Vol. 26, No. 8, (1999), 773-787.
    • (1999) Computers and Operations Research , vol.26 , Issue.8 , pp. 773-787
    • Sivrikaya-Serifoǧlu, F.1    Ulusoy, G.2
  • 3
    • 0041732082 scopus 로고    scopus 로고
    • Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
    • Yi, Y. and Wang, D. W., "Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines", J. of Intelligent Manufacturing, Vol. 14, Nos. 3-4, (2003), 311-322.
    • (2003) J. of Intelligent Manufacturing , vol.14 , Issue.3-4 , pp. 311-322
    • Yi, Y.1    Wang, D.W.2
  • 4
    • 0033079828 scopus 로고    scopus 로고
    • Early/tardy scheduling with sequence dependent setups on uniform parallel machines
    • Balakrishnan, N., Kanet, J. J. and Sir Sridharan, V., "Early/tardy scheduling with sequence dependent setups on uniform parallel machines", Computers and Operations Research, Vol. 26, (1999), 127-141.
    • (1999) Computers and Operations Research , vol.26 , pp. 127-141
    • Balakrishnan, N.1    Kanet, J.J.2    Sir Sridharan, V.3
  • 5
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations, OMEGA
    • Allahverdi, A., Gupta, J. N. D. and Aldowaisan, T., "A review of scheduling research involving setup considerations", OMEGA, Int. J. Management Science, Vol. 27, (1999), 219-239.
    • (1999) Int. J. Management Science , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 6
    • 0037410718 scopus 로고    scopus 로고
    • A multipopulation genetic algorithm to solve multi objective scheduling problems for parallel machines
    • Cochran, J. K., Horng, S. M. and Fowler, J. W., "A multipopulation genetic algorithm to solve multi objective scheduling problems for parallel machines", Computers and Operations Research, Vol. 30, (2003), 1087-1102.
    • (2003) Computers and Operations Research , vol.30 , pp. 1087-1102
    • Cochran, J.K.1    Horng, S.M.2    Fowler, J.W.3
  • 7
    • 10644241667 scopus 로고    scopus 로고
    • Parallel machine selection and job scheduling to minimize machine cost and job tardiness
    • Cao, D., Chen, M. and Wan, G., "Parallel machine selection and job scheduling to minimize machine cost and job tardiness", Computers and Operations Research, Vol. 32, No. 8, (2005), 1995-2012.
    • (2005) Computers and Operations Research , vol.32 , Issue.8 , pp. 1995-2012
    • Cao, D.1    Chen, M.2    Wan, G.3
  • 8
    • 0347092029 scopus 로고    scopus 로고
    • A tabu search algorithm for parallel machine total tardiness problem
    • Bilge, ü., Kiraç, F., Kurtulan, M. and Pekgün, P., "A tabu search algorithm for parallel machine total tardiness problem", Computers and Operations Research, Vol. 31, No. 3, (2004), 397-414.
    • (2004) Computers and Operations Research , vol.31 , Issue.3 , pp. 397-414
    • Bilge, U.1    Kiraç, F.2    Kurtulan, M.3    Pekgün, P.4
  • 9
    • 0042311378 scopus 로고    scopus 로고
    • Scheduling unrelated parallel machines to minimize total weighted tardiness
    • Liaw, C. F., Lin, Y. K., Cheng, C. Y. and Chen, M., "Scheduling unrelated parallel machines to minimize total weighted tardiness", Computers and Operations Research, Vol. 30, (2003), 1777-1789.
    • (2003) Computers and Operations Research , vol.30 , pp. 1777-1789
    • Liaw, C.F.1    Lin, Y.K.2    Cheng, C.Y.3    Chen, M.4
  • 10
    • 33644772056 scopus 로고    scopus 로고
    • Genetic algorithms for the optimal common due date assignment and the optimal scheduling policy in parallel machine earliness/tardiness scheduling problems
    • Min, L. and Cheng, W., "Genetic algorithms for the optimal common due date assignment and the optimal scheduling policy in parallel machine earliness/tardiness scheduling problems", Robotics and Computer-Integrated Manufacturing, Vol. 22, No. 4, (2006), 279-287.
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , Issue.4 , pp. 279-287
    • Min, L.1    Cheng, W.2
  • 11
    • 0033743743 scopus 로고    scopus 로고
    • Scheduling on uniform parallel machines to minimize maximum lateness
    • Koulamas, C. and Kyparisis, G. J., "Scheduling on uniform parallel machines to minimize maximum lateness", Operations Research Letters, Vol. 26, No. 4, (2000), 175-179.
    • (2000) Operations Research Letters , vol.26 , Issue.4 , pp. 175-179
    • Koulamas, C.1    Kyparisis, G.J.2
  • 13
    • 25144495566 scopus 로고    scopus 로고
    • Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
    • Tavakkoli-Moghaddam, R., Moslehi, G., Vasei, M. and Azaron, A., "Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert", Applied Mathematics and Computation, Vol. 167, (2005), 1430-1450.
    • (2005) Applied Mathematics and Computation , vol.167 , pp. 1430-1450
    • Tavakkoli-Moghaddam, R.1    Moslehi, G.2    Vasei, M.3    Azaron, A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.