메뉴 건너뛰기




Volumn 45, Issue 5, 2009, Pages

Disassembly sequence planning based on generalized axis theory

Author keywords

Disassembly sequence planning; Fuzzy clustering; Generalized axis theory; Sub assembly

Indexed keywords

ADJACENCY MATRICES; ASSEMBLY PROCESS; ASSEMBLY STRUCTURES; COEFFICIENT FUNCTIONS; DISASSEMBLY SEQUENCE PLANNING; DYNAMIC PRODUCT; ENGINEERING SEMANTICS; EQUIVALENT MATRICES; FUZZY CLUSTER ANALYSIS; GENERALIZED AXIS THEORY; MATRIX; MEMBERSHIP MATRIX; OPERATION PROCEDURE; PRIORITY ADJUSTMENT; RELATIONSHIP GRAPHS; SUB-ASSEMBLY; THEORY AND METHODS;

EID: 67649230239     PISSN: 05776686     EISSN: None     Source Type: Journal    
DOI: 10.3901/JME.2009.05.160     Document Type: Article
Times cited : (3)

References (13)
  • 2
    • 0035866455 scopus 로고    scopus 로고
    • Disassembly sequence plan generation using a branch-and-bound algorithm
    • GUNGOR A, GUPTA S M. Disassembly sequence plan generation using a branch-and-bound algorithm[J]. International Journal of Production Research 2001, 39(3): 481-509.
    • (2001) International Journal of Production Research , vol.39 , Issue.3 , pp. 481-509
    • Gungor, A.1    Gupta, S.M.2
  • 3
    • 0002386894 scopus 로고    scopus 로고
    • Disassembly sequence generation using a neural network approach
    • HUANG H, WANG M H, JOHNSON M. Disassembly sequence generation using a neural network approach[J]. Journal of Manufacturing Systems, 2000, 19(2): 73-82.
    • (2000) Journal of Manufacturing Systems , vol.19 , Issue.2 , pp. 73-82
    • Huang, H.1    Wang, M.H.2    Johnson, M.3
  • 4
    • 33947114793 scopus 로고    scopus 로고
    • Fuzzy-Petri-net-based disassembly planning considering human factors
    • TANG Y, ZHOU M. Fuzzy-Petri-net-based disassembly planning considering human factors[J]. IEEE, 2006, 36(4): 718-725.
    • (2006) IEEE , vol.36 , Issue.4 , pp. 718-725
    • Tang, Y.1    Zhou, M.2
  • 5
    • 0039490031 scopus 로고    scopus 로고
    • Automatic disassembly plans: Applications to the continuous process industries case
    • ADENSO B, MOURE F, RENDUELES M. Automatic disassembly plans: Applications to the continuous process industries case[J]. Journal of Manufacturing Systems, 2002, 21(4): 276-286.
    • (2002) Journal of Manufacturing Systems , vol.21 , Issue.4 , pp. 276-286
    • Adenso, B.1    Moure, F.2    Rendueles, M.3
  • 6
    • 0035241026 scopus 로고    scopus 로고
    • A disassembly planning software system for the optimization of recycling processes
    • DINI G, FAILLI F, SANTOCHI M. A disassembly planning software system for the optimization of recycling processes[J]. Product Plan Control, 2001, 12(1): 2-12.
    • (2001) Product Plan Control , vol.12 , Issue.1 , pp. 2-12
    • Dini, G.1    Failli, F.2    Santochi, M.3
  • 7
    • 27344449327 scopus 로고    scopus 로고
    • A scatter search approach to the optimum disassembly sequence problem
    • GONZALEZ B, ADENSO B, A scatter search approach to the optimum disassembly sequence problem[J]. Computer & Operation Research, 2006, 33(6): 1776-1793.
    • (2006) Computer & Operation Research , vol.33 , Issue.6 , pp. 1776-1793
    • Gonzalez, B.1    Adenso, B.2
  • 8
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • LAMBERT A. Determining optimum disassembly sequences in electronic equipment[J]. Computers & Industrial Engineering, 2002, 43(3): 553-575.
    • (2002) Computers & Industrial Engineering , vol.43 , Issue.3 , pp. 553-575
    • Lambert, A.1
  • 9
    • 0041341872 scopus 로고    scopus 로고
    • Disassembly scheduling with multiple product types
    • KIM H J, LEE D H, XIROUCHAKIS P. Disassembly scheduling with multiple product types[J]. Annals of the CIRP, 2003, 52(1): 403-406.
    • (2003) Annals of the CIRP , vol.52 , Issue.1 , pp. 403-406
    • Kim, H.J.1    Lee, D.H.2    Xirouchakis, P.3
  • 10
    • 33745661040 scopus 로고    scopus 로고
    • Research on disassembly sequence planning algorithm based on engineering semantic information
    • JIANG Jibin, LIU Zhifeng, LIU Guangfu. Research on disassembly sequence planning algorithm based on engineering semantic information[J]. Computer Integrated Manufacturing Systems, 2006, 12(4): 625-629.
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.4 , pp. 625-629
    • Jiang, J.1    Liu, Z.2    Liu, G.3
  • 11
    • 67649152201 scopus 로고    scopus 로고
    • Analysis of identification of assembly in disassembly operations
    • LIU Xueping, LIU Guangfu. Analysis of identification of assembly in disassembly operations[J]. China Mechanical Engineering, 2003, 14(6): 505-508.
    • (2003) China Mechanical Engineering , vol.14 , Issue.6 , pp. 505-508
    • Liu, X.1    Liu, G.2
  • 12
    • 33745655105 scopus 로고    scopus 로고
    • Design for disassembly based on level-network model
    • JIANG Jibin, LIU Zhifeng, LIU Guangfu. Design for disassembly based on level-network model[J]. China Mechanical Engineering, 2003, 21(14): 1864-1867.
    • (2003) China Mechanical Engineering , vol.21 , Issue.14 , pp. 1864-1867
    • Jiang, J.1    Liu, Z.2    Liu, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.