-
4
-
-
77955690640
-
Flexibility and Related Issues in Evaluation and Selection of Technological Systems
-
Chowdary B. V. (2001) Flexibility and Related Issues in Evaluation and Selection of Technological Systems, Global Journal of Flexible Systems Management, 2(2), 11-20.
-
(2001)
Global Journal of Flexible Systems Management
, vol.2
, Issue.2
, pp. 11-20
-
-
Chowdary, B.V.1
-
5
-
-
67649231969
-
-
Commission N. Y. T. C. T. L. (2007) Current Medallions - sorted by TLC Medallion Number, current-medallions.xls, TLC.
-
Commission N. Y. T. C. T. L. (2007) Current Medallions - sorted by TLC Medallion Number, current-medallions.xls, TLC.
-
-
-
-
6
-
-
67649215644
-
-
Commission T. N. Y. C. T. a. L. (2007) About TLC, from http://www.ci.nyc.ny.us/html/tlc/html/about/about.shtml.
-
Commission T. N. Y. C. T. a. L. (2007) About TLC, from http://www.ci.nyc.ny.us/html/tlc/html/about/about.shtml.
-
-
-
-
8
-
-
0028465325
-
The Flexibility of Production Processes: A General Framework
-
de Groote, X. (1994 ) The Flexibility of Production Processes: A General Framework, Management Science, 40(7),
-
(1994)
Management Science
, vol.40
, Issue.7
-
-
de Groote, X.1
-
9
-
-
30744450491
-
Understanding Transportation as a System of Systems Design Problem
-
Reno, NV
-
DeLaurentis D. (2005) Understanding Transportation as a System of Systems Design Problem, 43rd AIAA Aerospace Sciences Meeting, Reno, NV.
-
(2005)
43rd AIAA Aerospace Sciences Meeting
-
-
DeLaurentis, D.1
-
12
-
-
0010289614
-
Chaos, Non-Linear Systems and Day-to-Day Management
-
Glass N. (1996) Chaos, Non-Linear Systems and Day-to-Day Management, European Management Journal, 14(1), 98-106.
-
(1996)
European Management Journal
, vol.14
, Issue.1
, pp. 98-106
-
-
Glass, N.1
-
14
-
-
47249104749
-
System of Systems Management: A Network Management Approach
-
San Antonio, TX
-
Gorod A., R. Gove, B. Sauser and J. Boardman (2007) System of Systems Management: A Network Management Approach, IEEE International Conference on System of Systems Engineering, San Antonio, TX.
-
(2007)
IEEE International Conference on System of Systems Engineering
-
-
Gorod, A.1
Gove, R.2
Sauser, B.3
Boardman, J.4
-
15
-
-
61449239447
-
An Application of Prim's Algorithm in Defining a SoS Operational Boundary
-
Hoboken, NJ
-
Gorod A. and B. Sauser (2007) An Application of Prim's Algorithm in Defining a SoS Operational Boundary, 5th Conference on Systems Engineering Research, Hoboken, NJ.
-
(2007)
5th Conference on Systems Engineering Research
-
-
Gorod, A.1
Sauser, B.2
-
17
-
-
78049410530
-
IEEE Standard for Application and Management of the Systems Engineering
-
IEEE
-
IEEE (2005) IEEE Standard for Application and Management of the Systems Engineering Process, IEEE. 1220.
-
(2005)
Process, IEEE
, pp. 1220
-
-
-
18
-
-
0142211215
-
Systems of Systems Engineering
-
Keating C, R. Rogers, R. Unal, D. Dryer, A. Sousa-Poza, R. Safford, W. Peterson and G.Rabaldi (2003) Systems of Systems Engineering, Engineering Management Journal, 15(3), 36-45.
-
(2003)
Engineering Management Journal
, vol.15
, Issue.3
, pp. 36-45
-
-
Keating, C.1
Rogers, R.2
Unal, R.3
Dryer, D.4
Sousa-Poza, A.5
Safford, R.6
Peterson, W.7
Rabaldi, G.8
-
20
-
-
27944460310
-
Synthesizing SoS concepts for use in Cost Estimation
-
Man, and Cybernetics
-
Lane I. A. and R. Valerdi (2005) Synthesizing SoS concepts for use in Cost Estimation, IEEE Conference on Systems, Man, and Cybernetics.
-
(2005)
IEEE Conference on Systems
-
-
Lane, I.A.1
Valerdi, R.2
-
24
-
-
33847696561
-
Measuring the Value of Flexibility in Space Systems: A Six-Element Framework
-
Nilchiani R. and D. E. Hastings (2007) Measuring the Value of Flexibility in Space Systems: A Six-Element Framework, Systems Engineering 10(1),
-
(2007)
Systems Engineering
, vol.10
, Issue.1
-
-
Nilchiani, R.1
Hastings, D.E.2
-
25
-
-
67649215643
-
-
O'Rourke R. (2007) Coast Guard Deepwater Program: Background, Oversight Issues, and Options for Congress, CRS Report for Congress, C. R. Service.
-
O'Rourke R. (2007) Coast Guard Deepwater Program: Background, Oversight Issues, and Options for Congress, CRS Report for Congress, C. R. Service.
-
-
-
-
26
-
-
67649160418
-
-
Panel N. T. T. (2004) New York City Transit Transportation Panel Survey.
-
Panel N. T. T. (2004) New York City Transit Transportation Panel Survey.
-
-
-
-
27
-
-
67649231970
-
New York Cabbies Stage Boycott Over Tougher Rules
-
Press T. A. (1998) New York Cabbies Stage Boycott Over Tougher Rules, U.S.News
-
(1998)
U.S.News
-
-
Press, T.A.1
-
28
-
-
33748414748
-
Toward Mission Assurance: A Framework for Systems Engineering Management
-
Sauser B. (2006) Toward Mission Assurance: A Framework for Systems Engineering Management, Systems Engineering, 9(3), 213-227.
-
(2006)
Systems Engineering
, vol.9
, Issue.3
, pp. 213-227
-
-
Sauser, B.1
-
30
-
-
67649222817
-
SoS Management, System of Systems Engineering - Innovations for the 21st Century, M. Jamshidi, Hoboken NI, Wiley & Sons
-
in press
-
Sauser B., J. Boardman and A. Gorod (2008) SoS Management, System of Systems Engineering - Innovations for the 21st Century, M. Jamshidi, Hoboken NI, Wiley & Sons, (in press)
-
(2008)
-
-
Sauser, B.1
Boardman, J.2
Gorod, A.3
-
32
-
-
67649239297
-
-
Schaller, B. (2006) Entry Controls in Taxi Regulation: Regulatory Policy Implications of U.S. and Canadian Experience, 1-17.
-
Schaller, B. (2006) Entry Controls in Taxi Regulation: Regulatory Policy Implications of U.S. and Canadian Experience, 1-17.
-
-
-
-
33
-
-
67649217700
-
-
Schaller Consulting. (2006) The New York City Taxicab Fact Book, New York, TLC, from http://www.schallerconsult.com/taxi/taxifb.pdf
-
Schaller Consulting. (2006) The New York City Taxicab Fact Book, New York, TLC, from http://www.schallerconsult.com/taxi/taxifb.pdf
-
-
-
-
39
-
-
84889398656
-
Saturn Vue and Toyota Camry Hybrids Join List of Approved Taxicab Models, from
-
TLC
-
TLC (2007) Saturn Vue and Toyota Camry Hybrids Join List of Approved Taxicab Models, from http://nyc.gov/html/tlc/html/news/ind06-09.shtml.
-
(2007)
-
-
-
40
-
-
0000991529
-
Flexibility as Process Mobility: The Management of Plant Capabilities for Quick Response Manufacturing
-
Upton D. M. (1995) Flexibility as Process Mobility: The Management of Plant Capabilities for Quick Response Manufacturing, Journal of Operations Management 12 205-224.
-
(1995)
Journal of Operations Management
, vol.12
, pp. 205-224
-
-
Upton, D.M.1
|