메뉴 건너뛰기




Volumn 5, Issue 2, 2009, Pages 163-189

Stochastic operational planning model for production and distribution in a hi-tech manufacturing network

Author keywords

Cancellation; Lead time flexibility; Manufacturing and logistics options; Manufacturing flexibility; Multi product available to promise; Revenue management

Indexed keywords


EID: 67649148067     PISSN: 17457645     EISSN: 17457653     Source Type: Journal    
DOI: 10.1504/IJOR.2009.025006     Document Type: Article
Times cited : (4)

References (26)
  • 2
    • 5644254746 scopus 로고    scopus 로고
    • Real-time revision of order quantities with capacity constraint: A single period model
    • Chakravarty, A.K. and Balakrishnan, N. (2004) 'Real-time revision of order quantities with capacity constraint: A single period model', Production and Operations Management, Vol. 13, No. 2, pp.171-185.
    • (2004) Production and Operations Management , vol.13 , Issue.2 , pp. 171-185
    • Chakravarty, A.K.1    Balakrishnan, N.2
  • 3
    • 57249117058 scopus 로고    scopus 로고
    • Order Selection and Scheduling with Leadtime Flexibility
    • Technical Report, School of Industrial Engineering, Georgia Institute of Technology, January
    • Charnsirisakskul, K., Griffin, P.M. and Keskinocak, P. (2004a) Order Selection and Scheduling with Leadtime Flexibility, Technical Report, School of Industrial Engineering, Georgia Institute of Technology, January.
    • (2004)
    • Charnsirisakskul, K.1    Griffin, P.M.2    Keskinocak, P.3
  • 5
    • 5144232771 scopus 로고    scopus 로고
    • A model for batch advanced available-to-promise
    • Chen, C.Y., Zhao, Z. and Ball, M.O. (2004) 'A model for batch advanced available-to-promise', Production and Operations Management, Vol. 11, No. 4, pp.424-440.
    • (2004) Production and Operations Management , vol.11 , Issue.4 , pp. 424-440
    • Chen, C.Y.1    Zhao, Z.2    Ball, M.O.3
  • 6
    • 33744826037 scopus 로고    scopus 로고
    • Order assignment and scheduling in a supply chain
    • Chen, Z.L. and Pundoor, G. (2006) 'Order assignment and scheduling in a supply chain', Operations Research, Vol. 54, No. 3, pp.555-572.
    • (2006) Operations Research , vol.54 , Issue.3 , pp. 555-572
    • Chen, Z.L.1    Pundoor, G.2
  • 7
    • 0030691365 scopus 로고    scopus 로고
    • A multiproduct dynamic pricing problem and its applications to network yield management
    • Gallego, G. and Van Ryzin, G. (1997) 'A multiproduct dynamic pricing problem and its applications to network yield management', Operations Research, Vol. 45, No. 1, pp.24-41.
    • (1997) Operations Research , vol.45 , Issue.1 , pp. 24-41
    • Gallego, G.1    Van Ryzin, G.2
  • 8
    • 0033116210 scopus 로고    scopus 로고
    • Coordination of pricing and multi-period production for constant priced goods
    • Gilbert, S.M. (1999) 'Coordination of pricing and multi-period production for constant priced goods', European Journal of Operational Research, Vol. 114, pp.330-337.
    • (1999) European Journal of Operational Research , vol.114 , pp. 330-337
    • Gilbert, S.M.1
  • 9
    • 0034476593 scopus 로고    scopus 로고
    • Coordination of pricing and multi-period production across multiple constant priced goods
    • Gilbert, S.M. (2000) 'Coordination of pricing and multi-period production across multiple constant priced goods', Operations Research, Vol. 46, No. 12, pp.1602-1616.
    • (2000) Operations Research , vol.46 , Issue.12 , pp. 1602-1616
    • Gilbert, S.M.1
  • 10
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due-date assignment and scheduling research
    • Gordon, V., Proth, J.M. and Chu, C. (2002) 'A survey of the state-of-the-art of common due-date assignment and scheduling research', European Journal of Operational Research, Vol. 139, pp.1-25.
    • (2002) European Journal of Operational Research , vol.139 , pp. 1-25
    • Gordon, V.1    Proth, J.M.2    Chu, C.3
  • 11
    • 0029534676 scopus 로고
    • A revenue management approach to demand management and order booking in assemble to order manufacturing
    • Harris, deB, H.F. and Pinder, J.P. (1995) 'A revenue management approach to demand management and order booking in assemble to order manufacturing', Journal of Operations Management, Vol. 13, pp.299-309.
    • (1995) Journal of Operations Management , vol.13 , pp. 299-309
    • Harris1    deB, H.F.2    Pinder, J.P.3
  • 12
    • 0036642989 scopus 로고    scopus 로고
    • An available-to-promise system for TFT LCD manufacturing in supply chain
    • Jeong, B., Sim, S.B., Jeong, H.S. and Kim, S.W. (2002) 'An available-to-promise system for TFT LCD manufacturing in supply chain', Computers and Industrial Engineering, Vol. 43, pp.191-212.
    • (2002) Computers and Industrial Engineering , vol.43 , pp. 191-212
    • Jeong, B.1    Sim, S.B.2    Jeong, H.S.3    Kim, S.W.4
  • 14
    • 0031102504 scopus 로고    scopus 로고
    • Capacity driven due date settings in make-to-order production systems
    • Ozdamar, L. and Yazgac, T. (1997) 'Capacity driven due date settings in make-to-order production systems', International Journal of Production Economics, Vol. 49, pp.29-44.
    • (1997) International Journal of Production Economics , vol.49 , pp. 29-44
    • Ozdamar, L.1    Yazgac, T.2
  • 15
    • 9544231676 scopus 로고    scopus 로고
    • Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management
    • Pibernik, R. (2005) 'Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management', International Journal of Production Economics, Vol. 9394, pp.239-252.
    • (2005) International Journal of Production Economics , vol.9394 , pp. 239-252
    • Pibernik, R.1
  • 18
    • 33846084400 scopus 로고    scopus 로고
    • On a volume flexible inventory model for items with an imperfect production system
    • Sana, S.S. et al. (2007) 'On a volume flexible inventory model for items with an imperfect production system', International Journal of Operational Research, Vol. 2, No. 1, pp.64-80.
    • (2007) International Journal of Operational Research , vol.2 , Issue.1 , pp. 64-80
    • Sana, S.S.1
  • 21
    • 33646373416 scopus 로고    scopus 로고
    • A flexible contract strategy in a supply chain with an in flexible production mode
    • Wang, Q., Tang, O. and Tsao, D. (2006) 'A flexible contract strategy in a supply chain with an in flexible production mode', International Journal of Operational Research, Vol. 1, No. 3, pp.228-248.
    • (2006) International Journal of Operational Research , vol.1 , Issue.3 , pp. 228-248
    • Wang, Q.1    Tang, O.2    Tsao, D.3
  • 23
    • 0346503086 scopus 로고    scopus 로고
    • WebATP: A web-based flexible available-to-promise computation system
    • Xiong, M.H., Tor, S.B. and Khoo, L.P. (2002) 'WebATP: A web-based flexible available-to-promise computation system', Production Planning and Control, Vol. 14, No. 7, pp.662-672.
    • (2002) Production Planning and Control , vol.14 , Issue.7 , pp. 662-672
    • Xiong, M.H.1    Tor, S.B.2    Khoo, L.P.3
  • 24
    • 19944385323 scopus 로고    scopus 로고
    • Multi-period dynamic supply contracts with cancellation
    • Xu, N. (2005) 'Multi-period dynamic supply contracts with cancellation', Computers and Operations Research, Vol. 32, No. 12, pp.3129-3142.
    • (2005) Computers and Operations Research , vol.32 , Issue.12 , pp. 3129-3142
    • Xu, N.1
  • 25
    • 33846393221 scopus 로고    scopus 로고
    • Single-vendor single-buyer with integrated transport-inventory system: Models and heuristics in the case of perishable goods
    • Zanoni, S. and Zavanella, L. (2007) 'Single-vendor single-buyer with integrated transport-inventory system: Models and heuristics in the case of perishable goods', Computers and Industrial Engineering, Vol. 52, No. 1, pp.107-123.
    • (2007) Computers and Industrial Engineering , vol.52 , Issue.1 , pp. 107-123
    • Zanoni, S.1    Zavanella, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.