메뉴 건너뛰기




Volumn 56, Issue 4, 2009, Pages 1333-1339

A systematic approach for resource allocation in software projects

Author keywords

Learning curve; Personnel assignment; Resource allocation; Software projects; Staff allocation; Training time

Indexed keywords

LEARNING CURVE; NOVEL METHODOLOGIES; RESOURCE ASSIGNMENTS; SKILL SETS; SOFTWARE APPLICATIONS; SOFTWARE INDUSTRIES; SOFTWARE PRODUCTS; SOFTWARE PROJECTS; SOFTWARE TASKS; STAFF ALLOCATION; TIME FRAMES; TRAINING TIME;

EID: 67349129760     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2008.08.002     Document Type: Article
Times cited : (57)

References (17)
  • 1
    • 0024611582 scopus 로고
    • The dynamics of software project staffing: A system dynamics based simulation approach
    • Abdel-Hamid T.K. The dynamics of software project staffing: A system dynamics based simulation approach. IEEE Transactions on Software Engineering 15 2 (1989) 109-119
    • (1989) IEEE Transactions on Software Engineering , vol.15 , Issue.2 , pp. 109-119
    • Abdel-Hamid, T.K.1
  • 3
    • 33645015688 scopus 로고    scopus 로고
    • Emphasizing human capabilities in software development
    • Acuña S.T., Juristo N., and Moreno A. Emphasizing human capabilities in software development. IEEE Software (2006) 94-101
    • (2006) IEEE Software , pp. 94-101
    • Acuña, S.T.1    Juristo, N.2    Moreno, A.3
  • 6
    • 3042627200 scopus 로고    scopus 로고
    • A task optimizer for software construction
    • Duggan J., Byrne J., and Lyons G. A task optimizer for software construction. IEEE Software (2004) 76-82
    • (2004) IEEE Software , pp. 76-82
    • Duggan, J.1    Byrne, J.2    Lyons, G.3
  • 7
    • 70249104402 scopus 로고    scopus 로고
    • Using analytic hierarchy process (AHP) method to prioritise human resources in substitution problem
    • Ho-Leung R. Using analytic hierarchy process (AHP) method to prioritise human resources in substitution problem. International Journal of the Computer: The Internet and Management 9 1 (2001)
    • (2001) International Journal of the Computer: The Internet and Management , vol.9 , Issue.1
    • Ho-Leung, R.1
  • 9
    • 0038937965 scopus 로고    scopus 로고
    • Resource allocation capabilities of commercial project management software packages
    • Kolisch R. Resource allocation capabilities of commercial project management software packages. Interfaces 29 4 (1999) 19-31
    • (1999) Interfaces , vol.29 , Issue.4 , pp. 19-31
    • Kolisch, R.1
  • 10
    • 0033319077 scopus 로고    scopus 로고
    • Software developer perceptions about software project failure: A case study
    • Linberg K.R. Software developer perceptions about software project failure: A case study. The Journal of Systems and Software 49 (1999) 177-192
    • (1999) The Journal of Systems and Software , vol.49 , pp. 177-192
    • Linberg, K.R.1
  • 14
    • 0347811796 scopus 로고    scopus 로고
    • A 'Peak Shaving' approach to project staff reallocation
    • Shaikh M.A. A 'Peak Shaving' approach to project staff reallocation. Computers and Industrial Engineering 35 1-2 (1998) 129-132
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.1-2 , pp. 129-132
    • Shaikh, M.A.1
  • 15
    • 0042090631 scopus 로고    scopus 로고
    • Human resource selection for software development projects using Taguchi's parameter design
    • Tsai H., Moskowitz H., and Lee H. Human resource selection for software development projects using Taguchi's parameter design. European Journal of Operational Research 153 1 (2003) 167-180
    • (2003) European Journal of Operational Research , vol.153 , Issue.1 , pp. 167-180
    • Tsai, H.1    Moskowitz, H.2    Lee, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.