-
1
-
-
0035284051
-
Iron ore production scheduling to improve product quality
-
Everett J E. Iron ore production scheduling to improve product quality. European Journal of Operational Research, 2001, 129(2): 355-361.
-
(2001)
European Journal of Operational Research
, vol.129
, Issue.2
, pp. 355-361
-
-
Everett, J.E.1
-
2
-
-
36049024581
-
Optimization of planning and scheduling for phosphor-chemical enterprises
-
Washington D. C, USA: IEEE
-
Fan T J, Li H Y, Xi D Z. Optimization of planning and scheduling for phosphor-chemical enterprises. In: Proceedings of IEEE International Conference on Service Operations and Logistics, and Information. Washington D. C, USA: IEEE, 2006. 689-695.
-
(2006)
Proceedings of IEEE International Conference on Service Operations and Logistics, and Information
, pp. 689-695
-
-
Fan, T.J.1
Li, H.Y.2
Xi, D.Z.3
-
3
-
-
30544433425
-
Raw materials purchasing plan model for large-scale steel-iron enterprises
-
Gao Zhen, Tang Li-Xin, Tao Wei, Xiao Xin-Hua. Raw materials purchasing plan model for large-scale steel-iron enterprises. Journal of Systems Engineering, 2003, 18(6): 566-570.
-
(2003)
Journal of Systems Engineering
, vol.18
, Issue.6
, pp. 566-570
-
-
Gao, Z.1
Tang, L.-X.2
Tao, W.3
Xiao, X.-H.4
-
4
-
-
2342566526
-
Combine column generation with GUB to solve the steel-iron raw materials purchasing lotsizing problem
-
Gao Zhen, Tang Li-Xin. Combine column generation with GUB to solve the steel-iron raw materials purchasing lotsizing problem. Acta Automatica Sinica, 2004, 30(1): 20-25.
-
(2004)
Acta Automatica Sinica
, vol.30
, Issue.1
, pp. 20-25
-
-
Gao, Z.1
Tang, L.-X.2
-
5
-
-
18744371054
-
Pareto optimization and its realization in VMI system considering pricing, production capacity and raw material procurement
-
Yu Yu-Gang, Liang Liang, Yu Yan, Huang G Q. Pareto optimization and its realization in VMI system considering pricing, production capacity and raw material procurement. Systems Engineering-Theory and Practice, 2005, 25(4): 1-7.
-
(2005)
Systems Engineering-Theory and Practice
, vol.25
, Issue.4
, pp. 1-7
-
-
Yu, Y.-G.1
Liang, L.2
Yu, Y.3
Huang, G.Q.4
-
6
-
-
79960720536
-
The production process management system for production indices optimization of mineral processing
-
Prague, Czech: Elsevier
-
Huang X L, Chu Y G, Hu Y, Chai T Y. The production process management system for production indices optimization of mineral processing. In: Proceedings of the 16th IFAC World Congress. Prague, Czech: Elsevier, 2005. 4-8.
-
(2005)
Proceedings of the 16th IFAC World Congress
, pp. 4-8
-
-
Huang, X.L.1
Chu, Y.G.2
Hu, Y.3
Chai, T.Y.4
-
7
-
-
66549115289
-
On dynamic cost control technology of ore-dressing production process
-
Liang Bin, Liu Wei. On dynamic cost control technology of ore-dressing production process. Control Engineering of China, 2005, 12(6): 567-569.
-
(2005)
Control Engineering of China
, vol.12
, Issue.6
, pp. 567-569
-
-
Liang, B.1
Liu, W.2
-
9
-
-
34948893274
-
Study of scheduling based on production indices optimization for mineral processing
-
Huang Xiao-Ling, Ding Jin-Liang, Chai Tian-You. Study of scheduling based on production indices optimization for mineral processing. Journal of Systems Engineering, 2006, 21(2): 136-142.
-
(2006)
Journal of Systems Engineering
, vol.21
, Issue.2
, pp. 136-142
-
-
Huang, X.-L.1
Ding, J.-L.2
Chai, T.-Y.3
|