메뉴 건너뛰기




Volumn 135, Issue 5, 2009, Pages 360-367

Dynamic regression models for prediction of construction costs

Author keywords

Construction costs; Forecasting; Predictions; Regression models

Indexed keywords

ACCURATE PREDICTIONS; CONSTRUCTION COST INDICES; CONSTRUCTION COSTS; CONSTRUCTION PROJECTS; COST INDEXES; DYNAMIC REGRESSION MODELS; ESTIMATE COSTS; EXISTING METHODS; NEW MODELS; PREDICTIONS; REGRESSION MODELS;

EID: 65249141723     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000006     Document Type: Article
Times cited : (58)

References (17)
  • 2
    • 0030672598 scopus 로고    scopus 로고
    • An integrated approach to cost forecasting and construction planning for the construction industry
    • ASCE, New York.
    • Dawood, N., and Molson, A. (1997). " An integrated approach to cost forecasting and construction planning for the construction industry.." Proc., 4th Congress on Computing in Civil Engineering, ASCE, New York, 535-542.
    • (1997) Proc., 4th Congress on Computing in Civil Engineering , pp. 535-542
    • Dawood, N.1    Molson, A.2
  • 3
    • 0020825299 scopus 로고
    • Probabilistic estimating: Mathematics and applications
    • Diekmann, J. E. (1983). " Probabilistic estimating: Mathematics and applications.." J. Constr. Eng. Manage., 109 (3), 297-308.
    • (1983) J. Constr. Eng. Manage. , vol.109 , Issue.3 , pp. 297-308
    • Diekmann, J.E.1
  • 5
    • 0030645967 scopus 로고    scopus 로고
    • Modeling uncertainty in cost estimates: A universal extension of the central limit theorem
    • ASCE, New York.
    • Flood, I. (1997). " Modeling uncertainty in cost estimates: A universal extension of the central limit theorem.." Proc., 4th Congress on Computing in Civil Engineering, ASCE, New York, 551-558.
    • (1997) Proc., 4th Congress on Computing in Civil Engineering , pp. 551-558
    • Flood, I.1
  • 6
    • 65249099325 scopus 로고
    • Keeping track of a moving target
    • Grogan, T. (1992). " Keeping track of a moving target.." ENR, 228 (13), 42-47.
    • (1992) ENR , vol.228 , Issue.13 , pp. 42-47
    • Grogan, T.1
  • 7
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • Hegazy, T., and Petzold, K. (2003). " Genetic optimization for dynamic project control.." J. Constr. Eng. Manage., 129 (4), 396-404.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 8
    • 0035509423 scopus 로고    scopus 로고
    • Probabilistic optimal-cost scheduling
    • Isidore, L. J., and Back, W. E. (2001). " Probabilistic optimal-cost scheduling.." J. Constr. Eng. Manage., 127 (6), 431-437.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 431-437
    • Isidore, L.J.1    Back, W.E.2
  • 9
    • 0019689404 scopus 로고
    • Forecasting engineering costs: Two case studies
    • Koppula, S. D. (1981). " Forecasting engineering costs: Two case studies.." J. Constr. Div., 107 (CO4), 733-743.
    • (1981) J. Constr. Div. , vol.107 , Issue.CO4 , pp. 733-743
    • Koppula, S.D.1
  • 10
    • 0004312239 scopus 로고
    • Prentice-Hall, Englewood Cliffs, N.J.
    • Ostwald, P. E. (1984). Cost estimating, Prentice-Hall, Englewood Cliffs, N.J.
    • (1984) Cost Estimating
    • Ostwald, P.E.1
  • 13
    • 84868915147 scopus 로고    scopus 로고
    • U.S. Census Bureau.. "." 〈〉 (Dec. 2006).
    • U.S. Census Bureau. (2006). " Housing starts for regions and states.." 〈 http://www.census.gov/const/www/newresconstindex.html 〉 (Dec. 2006).
    • (2006) Housing Starts for Regions and States
  • 14
    • 0038449314 scopus 로고    scopus 로고
    • U.S. Department of Labor.. "." 〈〉 (Dec. 2006).
    • U.S. Department of Labor. (2006). " Consumer price indexes.." 〈 http://www.bls.gov/cpi/home.htm 〉 (Dec. 2006).
    • (2006) Consumer Price Indexes
  • 16
    • 0028457079 scopus 로고
    • Predicting changes in construction cost indexes using neural networks
    • Williams, T. P. (1994). " Predicting changes in construction cost indexes using neural networks.." J. Constr. Eng. Manage., 120 (2), 306-320.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.2 , pp. 306-320
    • Williams, T.P.1
  • 17
    • 13844303116 scopus 로고    scopus 로고
    • Estimating future highway construction costs
    • Wilmot, C. G., and Cheng, G. (2003). " Estimating future highway construction costs.." J. Constr. Eng. Manage., 129 (3), 272-279.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 272-279
    • Wilmot, C.G.1    Cheng, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.