-
1
-
-
58049098232
-
Heuristic based on Petri nets modeling for FMS scheduling problem of makespan minimization
-
Taipei, Taiwan, in press
-
rd Annual Conf. of the IEEE Industrial Electronics Society, Taipei - Taiwan, 2007, in press.
-
(2007)
rd Annual Conf. of the IEEE Industrial Electronics Society
-
-
Morandin Jr., O.1
Kato, E.R.R.2
Maggio, E.G.R.3
Sanches, D.S.4
Deriz, A.C.5
-
2
-
-
0347998347
-
Genetic algorithms and flexible process planning in the design of fault tolerant cell control for flexible assembly systems
-
W.H.R. Yeung and P.R. Moore, "Genetic algorithms and flexible process planning in the design of fault tolerant cell control for flexible assembly systems", Int. Journal of Computer Integrated Manufacturing, vol. 13, n 2, pp. 157-168, 2000.
-
(2000)
Int. Journal of Computer Integrated Manufacturing
, vol.13
, Issue.2
, pp. 157-168
-
-
Yeung, W.H.R.1
Moore, P.R.2
-
4
-
-
0141636312
-
The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
-
P. Pongcharoen, C. Hicks and P.M. Braiden, "The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure", European Journal of Operational Research, n. 152, pp. 215-225, 2004.
-
(2004)
European Journal of Operational Research
, Issue.152
, pp. 215-225
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
-
5
-
-
0037063279
-
Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
-
P. Pongcharoen, C. Hicksa, P.M. Braidena, D.J. Stewardson, "Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products", Int. Journal of Production Economics. n. 78, pp. 311-322, 2002.
-
(2002)
Int. Journal of Production Economics
, Issue.78
, pp. 311-322
-
-
Pongcharoen, P.1
Hicksa, C.2
Braidena, P.M.3
Stewardson, D.J.4
-
6
-
-
33745684417
-
Simultaneous scheduling of parts and automated guided vehicles in a FMS environment using adaptive genetic algorithm
-
J. Jerald, P. Asokan, R. Saravanan and A. D. C. Rani "Simultaneous scheduling of parts and automated guided vehicles in a FMS environment using adaptive genetic algorithm", Int. Journal of Adv Manuf Technol, n. 29, pp. 584-589, 2006.
-
(2006)
Int. Journal of Adv Manuf Technol
, Issue.29
, pp. 584-589
-
-
Jerald, J.1
Asokan, P.2
Saravanan, R.3
Rani, A.D.C.4
-
7
-
-
28544438774
-
An adaptive genetic algorithm with multiple operators for flowshop scheduling
-
L. Zhang, L. Wang and D. Zheng "An adaptive genetic algorithm with multiple operators for flowshop scheduling", Int. Journal of Adv Manuf Technol, n. 27, pp. 580-587, 2006.
-
(2006)
Int. Journal of Adv Manuf Technol
, Issue.27
, pp. 580-587
-
-
Zhang, L.1
Wang, L.2
Zheng, D.3
-
8
-
-
4444270343
-
A Genetic Algorithm Based Approach to Flowshop Scheduling
-
Hangzhou, P.R. China, June
-
Y. Yin, J. Yiu and Z. Cheng "A Genetic Algorithm Based Approach to Flowshop Scheduling", Proceedings of the 5" World Congress on Intelligent Control and Automation, Hangzhou, P.R. China, June, 2004.
-
(2004)
Proceedings of the 5 World Congress on Intelligent Control and Automation
-
-
Yin, Y.1
Yiu, J.2
Cheng, Z.3
-
9
-
-
0028409149
-
Adaptive Probabilities of Crossover and Mutation in Genetic Algorithms
-
April
-
M. Srinivas, and L.M. Patnaik, "Adaptive Probabilities of Crossover and Mutation in Genetic Algorithms", IEEE Transactions on Systems, Man and Cybernetics, v. 24, n. 4, pp. 656-667, April, 1994.
-
(1994)
IEEE Transactions on Systems, Man and Cybernetics
, vol.24
, Issue.4
, pp. 656-667
-
-
Srinivas, M.1
Patnaik, L.M.2
-
10
-
-
0030675603
-
GA embedded dynamic search algorithm over a petri net model for an FMS scheduling
-
Albuquerque, New Mexico, v, April
-
Y.F. Chiu and L.A. Fu, "GA embedded dynamic search algorithm over a petri net model for an FMS scheduling", Proceedings of the 1997 IEEE Int. Conf. on Robotics and Automation, Albuquerque, New Mexico, v. 1 pp. 513-518, April, 1997.
-
(1997)
Proceedings of the 1997 IEEE Int. Conf. on Robotics and Automation
, vol.1
, pp. 513-518
-
-
Chiu, Y.F.1
Fu, L.A.2
-
11
-
-
11244331900
-
An Intelligent Integrated Scheduling Model for Flexible Manufacturing System
-
Singapore, pp, December
-
S.S. Sankar, S.G. Ponnambalam, R. Rajkumar and M. Gurumarimuthu, "An Intelligent Integrated Scheduling Model for Flexible Manufacturing System", Proceedings of the 2004 IEEE Conference on Robotics, Automation and Mechatronics, Singapore, pp. 1095-1100, December, 2004.
-
(2004)
Proceedings of the 2004 IEEE Conference on Robotics, Automation and Mechatronics
, pp. 1095-1100
-
-
Sankar, S.S.1
Ponnambalam, S.G.2
Rajkumar, R.3
Gurumarimuthu, M.4
-
12
-
-
58049107004
-
A Search Method using Genetic Algorithm for Production Reactive Scheduling Manufacturing Systems
-
Cambridge, UK, June, in press
-
O. Morandin Jr., E.R.R. Kato, A.C. Deriz and D.S. Sanches, "A Search Method using Genetic Algorithm for Production Reactive Scheduling Manufacturing Systems". IEEE International Symposium on Industrial Electronics, Cambridge, UK, June, 2008, in press.
-
(2008)
IEEE International Symposium on Industrial Electronics
-
-
Morandin Jr., O.1
Kato, E.R.R.2
Deriz, A.C.3
Sanches, D.S.4
|