-
1
-
-
0041587598
-
Simultaneous scheduling of machines and material handling devices in automated manufacturing
-
N. Raman, F. B. Talbot, and R. V. Rachamadugu, "Simultaneous Scheduling of Machines and Material Handling Devices in Automated Manufacturing," Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems, pp. 321-332, 1986.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems
, pp. 321-332
-
-
Raman, N.1
Talbot, F.B.2
Rachamadugu, R.V.3
-
3
-
-
0026866144
-
Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
-
I. Sabuncuoglu and D.L. Hommertzheim, "Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system," International Journal of Production Research, vol. 30, No.5, pp. 1059-1079, 1992.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.5
, pp. 1059-1079
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
4
-
-
0042088700
-
Experimental investigation of an FMS due-date scheduling problem: Evaluation of Machine and AGV Scheduling Rules
-
I. Sabuncuoglu and D.L. Hommertzheim, "Experimental Investigation of an FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules," International journal of flexible manufacturing systems, vol. 5, pp. 301-323, 1993.
-
(1993)
International Journal of Flexible Manufacturing Systems
, vol.5
, pp. 301-323
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
5
-
-
0032000573
-
Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
-
I. Sabuncuoglu, and S. Karabuk, "Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems," IIE Transactions, vol. 30, No.2, pp. 179-191, 1998.
-
(1998)
IIE Transactions
, vol.30
, Issue.2
, pp. 179-191
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
6
-
-
0033131582
-
Job shop scheduling considering material handling
-
J. Smith, B. Peters and A. Srinivasan, "Job shop scheduling considering material handling," International Journal of Production Research, vol. 37, No.7, pp. 1541-1560, 1999.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.7
, pp. 1541-1560
-
-
Smith, J.1
Peters, B.2
Srinivasan, A.3
-
7
-
-
0032026875
-
Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
-
M.F. Anwar, and R. Nagi, "Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies," International Journal of Production Research, vol. 36, No. 3, pp. 653-681, 1998.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.3
, pp. 653-681
-
-
Anwar, M.F.1
Nagi, R.2
-
8
-
-
0029404820
-
A time window approach to simultaneous scheduling of machines and material handling system in an FMS
-
U. Bilge, and G. Ulusoy, "A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS," Operations Research, vol. 43, No. 6, pp. 1058-1070, 1995.
-
(1995)
Operations Research
, vol.43
, Issue.6
, pp. 1058-1070
-
-
Bilge, U.1
Ulusoy, G.2
-
9
-
-
34249921014
-
Scheduling tasks and vehicles in a flexible manufacturing system
-
J. Blazevich, H.A. Eiselt, G. Finke, G. Laporte, and Weglarz, "Scheduling Tasks and Vehicles in a Flexible Manufacturing System," International Journal of Flexible Manufacturing System, vol. 4, No. 1, pp. 5-16, 1991.
-
(1991)
International Journal of Flexible Manufacturing System
, vol.4
, Issue.1
, pp. 5-16
-
-
Blazevich, J.1
Eiselt, H.A.2
Finke, G.3
Laporte, G.4
Weglarz5
-
10
-
-
0027845081
-
Simultaneous scheduling of machines and material handling system in an FMS
-
G. Ulusoy, and U. Bilge, "Simultaneous Scheduling of Machines and Material Handling System in an FMS," International Journal of Production Research, vol. 31, No. 12, pp. 2857-2873, 1993.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2857-2873
-
-
Ulusoy, G.1
Bilge, U.2
-
11
-
-
0029762504
-
AGV dispatching
-
C.M. Klein, And J. Kim, "AGV dispatching," International Journal of Production Research, Vol. 34, No.1, pp. 95-110, 1996.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.1
, pp. 95-110
-
-
Klein, C.M.1
Kim, A.J.2
-
12
-
-
0032375676
-
Design and operational issues in AGV-served manufacturing systems
-
T. Ganesharajah, N.G. Hall and C. Sriskandarajah, "Design and operational issues in AGV-served manufacturing systems." Annals of Operations Research, vol. 76, pp 109-154, 1998.
-
(1998)
Annals of Operations Research
, vol.76
, pp. 109-154
-
-
Ganesharajah, T.1
Hall, N.G.2
Sriskandarajah, C.3
-
13
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
T.C.E. Chen, and M.C. Gupta, "Survey of Scheduling Research Involving Due Date Determination Decisions," European Journal of Operation Research, vol. 38, pp. 156-166, 1989.
-
(1989)
European Journal of Operation Research
, vol.38
, pp. 156-166
-
-
Chen, T.C.E.1
Gupta, M.C.2
-
14
-
-
0043113319
-
Material handling in flexible manufacturing systems
-
A. Kusiak, "Material Handling In Flexible Manufacturing Systems," Material Flow, vol. 2, pp. 79-95, 1985.
-
(1985)
Material Flow
, vol.2
, pp. 79-95
-
-
Kusiak, A.1
-
15
-
-
11244307966
-
Job input sequencing and device dispatching in a single device automated guided vehicle systems
-
Glasgow, July 12-15
-
Michel Gourgand, Philippe Lacomme and Nikolay Tchernev., "Job Input Sequencing and Device Dispatching in a Single Device Automated Guided Vehicle Systems," International Conference on Industrial Engineering and Production Management, Glasgow, July 12-15, pp. 438-447, 1999.
-
(1999)
International Conference on Industrial Engineering and Production Management
, pp. 438-447
-
-
Gourgand, M.1
Lacomme, P.2
Tchernev, N.3
|