메뉴 건너뛰기




Volumn , Issue , 2004, Pages 1095-1100

An intelligent integrated scheduling model for flexible manufacturing system

Author keywords

Flexible manufacturing system; Genetic algorithm; Simultaneous scheduling

Indexed keywords

COMPUTER SIMULATION; FLEXIBLE MANUFACTURING SYSTEMS; GENETIC ALGORITHMS; ITERATIVE METHODS; MATERIALS HANDLING; REAL TIME SYSTEMS; SCHEDULING; COMBINATORIAL MATHEMATICS; CONSTRAINT THEORY; INTELLIGENT AGENTS; OPTIMIZATION; PROBLEM SOLVING;

EID: 11244331900     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (11)

References (15)
  • 3
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • I. Sabuncuoglu and D.L. Hommertzheim, "Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system," International Journal of Production Research, vol. 30, No.5, pp. 1059-1079, 1992.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 1059-1079
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 4
    • 0042088700 scopus 로고
    • Experimental investigation of an FMS due-date scheduling problem: Evaluation of Machine and AGV Scheduling Rules
    • I. Sabuncuoglu and D.L. Hommertzheim, "Experimental Investigation of an FMS Due-Date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules," International journal of flexible manufacturing systems, vol. 5, pp. 301-323, 1993.
    • (1993) International Journal of Flexible Manufacturing Systems , vol.5 , pp. 301-323
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 5
    • 0032000573 scopus 로고    scopus 로고
    • Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
    • I. Sabuncuoglu, and S. Karabuk, "Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems," IIE Transactions, vol. 30, No.2, pp. 179-191, 1998.
    • (1998) IIE Transactions , vol.30 , Issue.2 , pp. 179-191
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 7
    • 0032026875 scopus 로고    scopus 로고
    • Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
    • M.F. Anwar, and R. Nagi, "Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies," International Journal of Production Research, vol. 36, No. 3, pp. 653-681, 1998.
    • (1998) International Journal of Production Research , vol.36 , Issue.3 , pp. 653-681
    • Anwar, M.F.1    Nagi, R.2
  • 8
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • U. Bilge, and G. Ulusoy, "A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS," Operations Research, vol. 43, No. 6, pp. 1058-1070, 1995.
    • (1995) Operations Research , vol.43 , Issue.6 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 10
    • 0027845081 scopus 로고
    • Simultaneous scheduling of machines and material handling system in an FMS
    • G. Ulusoy, and U. Bilge, "Simultaneous Scheduling of Machines and Material Handling System in an FMS," International Journal of Production Research, vol. 31, No. 12, pp. 2857-2873, 1993.
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2857-2873
    • Ulusoy, G.1    Bilge, U.2
  • 13
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • T.C.E. Chen, and M.C. Gupta, "Survey of Scheduling Research Involving Due Date Determination Decisions," European Journal of Operation Research, vol. 38, pp. 156-166, 1989.
    • (1989) European Journal of Operation Research , vol.38 , pp. 156-166
    • Chen, T.C.E.1    Gupta, M.C.2
  • 14
    • 0043113319 scopus 로고
    • Material handling in flexible manufacturing systems
    • A. Kusiak, "Material Handling In Flexible Manufacturing Systems," Material Flow, vol. 2, pp. 79-95, 1985.
    • (1985) Material Flow , vol.2 , pp. 79-95
    • Kusiak, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.