메뉴 건너뛰기




Volumn 39, Issue 2, 2009, Pages 190-200

Integrated resource allocation and scheduling in a bidirectional flowshop with multimachine and COS constraints

Author keywords

Flowshop scheduling; Multiplemachine; Resource allocation

Indexed keywords

AGENTS; CONTINUOUS TIME SYSTEMS; DYNAMIC PROGRAMMING; INTEGER PROGRAMMING; INTERNET PROTOCOLS; LINEARIZATION; PLANNING; RESOURCE ALLOCATION; SCHEDULING; TIME DOMAIN ANALYSIS;

EID: 63049088978     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2008.2007500     Document Type: Article
Times cited : (9)

References (20)
  • 1
    • 17644374193 scopus 로고    scopus 로고
    • Multi-degree cyclic scheduling of two robots in a no-wait flowshop
    • Apr
    • A. Che and C. Chu, "Multi-degree cyclic scheduling of two robots in a no-wait flowshop," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 2, pp. 173-183, Apr. 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng , vol.2 , Issue.2 , pp. 173-183
    • Che, A.1    Chu, C.2
  • 2
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • J. Adams, E. Balas, and D. Zawack, "The shifting bottleneck procedure for job shop scheduling," Manage. Sci., vol. 34, pp. 391-401, 1988.
    • (1988) Manage. Sci , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 3
    • 34250094949 scopus 로고
    • Scheduling project networks with resource constraints and time windows
    • M. Bartusch, R. H. Mohring, and F. J. Radermacher, "Scheduling project networks with resource constraints and time windows," Ann. Oper. Res., vol. 16, pp. 201-240, 1988.
    • (1988) Ann. Oper. Res , vol.16 , pp. 201-240
    • Bartusch, M.1    Mohring, R.H.2    Radermacher, F.J.3
  • 4
    • 34249018250 scopus 로고    scopus 로고
    • A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling
    • Jun
    • B. B. Li and L. Wang, "A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 37, no. 3, pp. 576-591, Jun. 2007.
    • (2007) IEEE Trans. Syst., Man, Cybern. B, Cybern , vol.37 , Issue.3 , pp. 576-591
    • Li, B.B.1    Wang, L.2
  • 5
    • 0037209478 scopus 로고    scopus 로고
    • A multiple-crane-constrained scheduling problem in a container terminal
    • E. K. Bish, "A multiple-crane-constrained scheduling problem in a container terminal," Eur. J. Oper. Res., vol. 144, pp. 83-107, 2003.
    • (2003) Eur. J. Oper. Res , vol.144 , pp. 83-107
    • Bish, E.K.1
  • 6
  • 7
    • 84867925682 scopus 로고    scopus 로고
    • Scheduling and constraint propagation
    • P. Brucker, "Scheduling and constraint propagation," Discr. Appl. Math., vol. 123, pp. 227-256, 2002.
    • (2002) Discr. Appl. Math , vol.123 , pp. 227-256
    • Brucker, P.1
  • 8
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • S.D. Wu, E. S. Byeon, and R.H. Storer, "A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness," Oper. Res., vol. 47, no. 1, pp. 113-124, 1999.
    • (1999) Oper. Res , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.S.2    Storer, R.H.3
  • 9
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • I. Kacem, S. Hammadi, and P. Borne, "Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic," Math. Comput. Simul., vol. 60, pp. 245-276, 2002.
    • (2002) Math. Comput. Simul , vol.60 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 10
    • 0040362439 scopus 로고
    • An extension of Johnson's results on job lot scheduling
    • J. R. Jackson, "An extension of Johnson's results on job lot scheduling," Naval Res. Logist. Quart., vol. 3, pp. 201-203, 1956.
    • (1956) Naval Res. Logist. Quart , vol.3 , pp. 201-203
    • Jackson, J.R.1
  • 11
    • 15844419161 scopus 로고    scopus 로고
    • HongKong International Terminal gains elastic capacity using a data-intensive decision-support system
    • K. G. Murty, Y. W. Wan, J. Liu, M. M. Tseng, E. Leung, K. K. Lai, and H. W. C. Chiu, "HongKong International Terminal gains elastic capacity using a data-intensive decision-support system," Interfaces, vol. 35, no. 1, pp. 61-75, 2005.
    • (2005) Interfaces , vol.35 , Issue.1 , pp. 61-75
    • Murty, K.G.1    Wan, Y.W.2    Liu, J.3    Tseng, M.M.4    Leung, E.5    Lai, K.K.6    Chiu, H.W.C.7
  • 12
    • 4744347235 scopus 로고    scopus 로고
    • Improving scheduling robustness via pre-processing and dynamic adaptation
    • E. Kutanoglu and S. D. Wu, "Improving scheduling robustness via pre-processing and dynamic adaptation," IIE Trans., vol. 36, pp. 1107-1124, 2004.
    • (2004) IIE Trans , vol.36 , pp. 1107-1124
    • Kutanoglu, E.1    Wu, S.D.2
  • 14
    • 31744441103 scopus 로고    scopus 로고
    • A multiagent evolutionary algorithm for constraint satisfaction problems
    • Feb
    • J. Liu, W. C. Zhong, and L. C. Jiao, "A multiagent evolutionary algorithm for constraint satisfaction problems," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 36, no. 1, pp. 54-73, Feb. 2006.
    • (2006) IEEE Trans. Syst., Man, Cybern. B, Cybern , vol.36 , Issue.1 , pp. 54-73
    • Liu, J.1    Zhong, W.C.2    Jiao, L.C.3
  • 15
    • 0030262783 scopus 로고    scopus 로고
    • Scheduling multiprocessor tasks - An overview
    • M. Drozdowski, "Scheduling multiprocessor tasks - An overview," Eur. J. Oper. Res., vol. 94, pp. 215-230, 1996.
    • (1996) Eur. J. Oper. Res , vol.94 , pp. 215-230
    • Drozdowski, M.1
  • 16
    • 34447306016 scopus 로고    scopus 로고
    • Assignment and scheduling in flexible job-shops by hierarchical optimization
    • Jul
    • N. Zribi, I. Kacem, A. ElKamel, and P. Borne, "Assignment and scheduling in flexible job-shops by hierarchical optimization," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 37, no. 4, pp. 652-661, Jul. 2007.
    • (2007) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev , vol.37 , Issue.4 , pp. 652-661
    • Zribi, N.1    Kacem, I.2    ElKamel, A.3    Borne, P.4
  • 17
    • 84867925682 scopus 로고    scopus 로고
    • Scheduling and constraint propagation
    • B. Peter, "Scheduling and constraint propagation," Discr. Appl. Math., vol. 123, pp. 227-256, 2002.
    • (2002) Discr. Appl. Math , vol.123 , pp. 227-256
    • Peter, B.1
  • 18
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • A. Pritsker, L.Watters, and P. Wolfe, "Multiproject scheduling with limited resources: A zero-one programming approach," Manage. Sci.: Theory, vol. 16, no. 1, pp. 93-108, 1969.
    • (1969) Manage. Sci.: Theory , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, A.1    Watters, L.2    Wolfe, P.3
  • 19
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • A. P. J. Vepsalainen and T. E. Morton, "Priority rules for job shops with weighted tardiness costs," Manage. Sci., vol. 33, no. 8, pp. 1035-1047, 1987.
    • (1987) Manage. Sci , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 20
    • 41149091191 scopus 로고    scopus 로고
    • Bidirectional flow shop scheduling with multi-machine capacity and critical operation sequencing
    • Z. J. Zhao, T. Y. Leong, S. S. Ge, and H. C. Lau, "Bidirectional flow shop scheduling with multi-machine capacity and critical operation sequencing," in Proc. Int. Symp. Intell. Control (ISIC 2007 , pp. 446-451.
    • (2007) Proc. Int. Symp. Intell. Control (ISIC , pp. 446-451
    • Zhao, Z.J.1    Leong, T.Y.2    Ge, S.S.3    Lau, H.C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.