-
1
-
-
17644374193
-
Multi-degree cyclic scheduling of two robots in a no-wait flowshop
-
Apr
-
A. Che and C. Chu, "Multi-degree cyclic scheduling of two robots in a no-wait flowshop," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 2, pp. 173-183, Apr. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng
, vol.2
, Issue.2
, pp. 173-183
-
-
Che, A.1
Chu, C.2
-
2
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
J. Adams, E. Balas, and D. Zawack, "The shifting bottleneck procedure for job shop scheduling," Manage. Sci., vol. 34, pp. 391-401, 1988.
-
(1988)
Manage. Sci
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
M. Bartusch, R. H. Mohring, and F. J. Radermacher, "Scheduling project networks with resource constraints and time windows," Ann. Oper. Res., vol. 16, pp. 201-240, 1988.
-
(1988)
Ann. Oper. Res
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Mohring, R.H.2
Radermacher, F.J.3
-
4
-
-
34249018250
-
A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling
-
Jun
-
B. B. Li and L. Wang, "A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 37, no. 3, pp. 576-591, Jun. 2007.
-
(2007)
IEEE Trans. Syst., Man, Cybern. B, Cybern
, vol.37
, Issue.3
, pp. 576-591
-
-
Li, B.B.1
Wang, L.2
-
5
-
-
0037209478
-
A multiple-crane-constrained scheduling problem in a container terminal
-
E. K. Bish, "A multiple-crane-constrained scheduling problem in a container terminal," Eur. J. Oper. Res., vol. 144, pp. 83-107, 2003.
-
(2003)
Eur. J. Oper. Res
, vol.144
, pp. 83-107
-
-
Bish, E.K.1
-
6
-
-
21644462880
-
Dispatching vehicles in a mega container terminal
-
E. K. Bish, F. Y. CHen, Y. T. Leong, B. L. Nelson, J. W. C. Ng, and D. S. Levi, "Dispatching vehicles in a mega container terminal," OR Spectr., vol. 27, no. 4, pp. 491-506, 2005.
-
(2005)
OR Spectr
, vol.27
, Issue.4
, pp. 491-506
-
-
Bish, E.K.1
CHen, F.Y.2
Leong, Y.T.3
Nelson, B.L.4
Ng, J.W.C.5
Levi, D.S.6
-
7
-
-
84867925682
-
Scheduling and constraint propagation
-
P. Brucker, "Scheduling and constraint propagation," Discr. Appl. Math., vol. 123, pp. 227-256, 2002.
-
(2002)
Discr. Appl. Math
, vol.123
, pp. 227-256
-
-
Brucker, P.1
-
8
-
-
0000927907
-
A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
-
S.D. Wu, E. S. Byeon, and R.H. Storer, "A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness," Oper. Res., vol. 47, no. 1, pp. 113-124, 1999.
-
(1999)
Oper. Res
, vol.47
, Issue.1
, pp. 113-124
-
-
Wu, S.D.1
Byeon, E.S.2
Storer, R.H.3
-
9
-
-
0037201140
-
Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
-
I. Kacem, S. Hammadi, and P. Borne, "Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic," Math. Comput. Simul., vol. 60, pp. 245-276, 2002.
-
(2002)
Math. Comput. Simul
, vol.60
, pp. 245-276
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
10
-
-
0040362439
-
An extension of Johnson's results on job lot scheduling
-
J. R. Jackson, "An extension of Johnson's results on job lot scheduling," Naval Res. Logist. Quart., vol. 3, pp. 201-203, 1956.
-
(1956)
Naval Res. Logist. Quart
, vol.3
, pp. 201-203
-
-
Jackson, J.R.1
-
11
-
-
15844419161
-
HongKong International Terminal gains elastic capacity using a data-intensive decision-support system
-
K. G. Murty, Y. W. Wan, J. Liu, M. M. Tseng, E. Leung, K. K. Lai, and H. W. C. Chiu, "HongKong International Terminal gains elastic capacity using a data-intensive decision-support system," Interfaces, vol. 35, no. 1, pp. 61-75, 2005.
-
(2005)
Interfaces
, vol.35
, Issue.1
, pp. 61-75
-
-
Murty, K.G.1
Wan, Y.W.2
Liu, J.3
Tseng, M.M.4
Leung, E.5
Lai, K.K.6
Chiu, H.W.C.7
-
12
-
-
4744347235
-
Improving scheduling robustness via pre-processing and dynamic adaptation
-
E. Kutanoglu and S. D. Wu, "Improving scheduling robustness via pre-processing and dynamic adaptation," IIE Trans., vol. 36, pp. 1107-1124, 2004.
-
(2004)
IIE Trans
, vol.36
, pp. 1107-1124
-
-
Kutanoglu, E.1
Wu, S.D.2
-
13
-
-
44149116514
-
Multiperiod combinatorial auction mechanism for distributed resource allocation and scheduling
-
H. C. Lau, S. F. Cheng, T. Y. Leong, J. H. Park, and Z. J. Zhao, "Multiperiod combinatorial auction mechanism for distributed resource allocation and scheduling," in Proc. IEEE/ACM/WIC Int. Conf. Intell. Agent Technol. (IAT 2007), pp. 407-411.
-
Proc. IEEE/ACM/WIC Int. Conf. Intell. Agent Technol. (IAT 2007)
, pp. 407-411
-
-
Lau, H.C.1
Cheng, S.F.2
Leong, T.Y.3
Park, J.H.4
Zhao, Z.J.5
-
14
-
-
31744441103
-
A multiagent evolutionary algorithm for constraint satisfaction problems
-
Feb
-
J. Liu, W. C. Zhong, and L. C. Jiao, "A multiagent evolutionary algorithm for constraint satisfaction problems," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 36, no. 1, pp. 54-73, Feb. 2006.
-
(2006)
IEEE Trans. Syst., Man, Cybern. B, Cybern
, vol.36
, Issue.1
, pp. 54-73
-
-
Liu, J.1
Zhong, W.C.2
Jiao, L.C.3
-
15
-
-
0030262783
-
Scheduling multiprocessor tasks - An overview
-
M. Drozdowski, "Scheduling multiprocessor tasks - An overview," Eur. J. Oper. Res., vol. 94, pp. 215-230, 1996.
-
(1996)
Eur. J. Oper. Res
, vol.94
, pp. 215-230
-
-
Drozdowski, M.1
-
16
-
-
34447306016
-
Assignment and scheduling in flexible job-shops by hierarchical optimization
-
Jul
-
N. Zribi, I. Kacem, A. ElKamel, and P. Borne, "Assignment and scheduling in flexible job-shops by hierarchical optimization," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 37, no. 4, pp. 652-661, Jul. 2007.
-
(2007)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev
, vol.37
, Issue.4
, pp. 652-661
-
-
Zribi, N.1
Kacem, I.2
ElKamel, A.3
Borne, P.4
-
17
-
-
84867925682
-
Scheduling and constraint propagation
-
B. Peter, "Scheduling and constraint propagation," Discr. Appl. Math., vol. 123, pp. 227-256, 2002.
-
(2002)
Discr. Appl. Math
, vol.123
, pp. 227-256
-
-
Peter, B.1
-
18
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
A. Pritsker, L.Watters, and P. Wolfe, "Multiproject scheduling with limited resources: A zero-one programming approach," Manage. Sci.: Theory, vol. 16, no. 1, pp. 93-108, 1969.
-
(1969)
Manage. Sci.: Theory
, vol.16
, Issue.1
, pp. 93-108
-
-
Pritsker, A.1
Watters, L.2
Wolfe, P.3
-
19
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
A. P. J. Vepsalainen and T. E. Morton, "Priority rules for job shops with weighted tardiness costs," Manage. Sci., vol. 33, no. 8, pp. 1035-1047, 1987.
-
(1987)
Manage. Sci
, vol.33
, Issue.8
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
20
-
-
41149091191
-
Bidirectional flow shop scheduling with multi-machine capacity and critical operation sequencing
-
Z. J. Zhao, T. Y. Leong, S. S. Ge, and H. C. Lau, "Bidirectional flow shop scheduling with multi-machine capacity and critical operation sequencing," in Proc. Int. Symp. Intell. Control (ISIC 2007 , pp. 446-451.
-
(2007)
Proc. Int. Symp. Intell. Control (ISIC
, pp. 446-451
-
-
Zhao, Z.J.1
Leong, T.Y.2
Ge, S.S.3
Lau, H.C.4
|