메뉴 건너뛰기




Volumn 13, Issue SUPPL. 1, 2008, Pages 114-120

Applying AHP-Based CBR to Estimate Pavement Maintenance Cost

Author keywords

analytical hierarchy process; case based reasoning; cost estimation; project management

Indexed keywords

ASSET MANAGEMENT; BITS; CASE BASED REASONING; COSTS; DEVELOPING COUNTRIES; ESTIMATION; HIGHWAY PLANNING; MAINTENANCE; PAVEMENTS; PROJECT MANAGEMENT; TUNNELING (EXCAVATION);

EID: 62649166987     PISSN: 10070214     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1007-0214(08)70136-6     Document Type: Article
Times cited : (23)

References (26)
  • 1
    • 62649163036 scopus 로고    scopus 로고
    • (cited Nov. 2006).
    • MOTC (2007). http://www.thb.gov.tw/ (cited Nov. 2006).
    • (2007)
    • MOTC1
  • 2
    • 2642564315 scopus 로고    scopus 로고
    • Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning
    • Kim G.H., An S.H., and Kang K.I. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Building and Environment 39 10 (2004) 1235-1242
    • (2004) Building and Environment , vol.39 , Issue.10 , pp. 1235-1242
    • Kim, G.H.1    An, S.H.2    Kang, K.I.3
  • 3
    • 0033354365 scopus 로고    scopus 로고
    • Cost estimation during design step: Parametric method versus case based reasoning method
    • Duverlie P., and Castelain J.M. Cost estimation during design step: Parametric method versus case based reasoning method. International Journal of Advanced Manufacturing Technology 15 12 (1999) 895-906
    • (1999) International Journal of Advanced Manufacturing Technology , vol.15 , Issue.12 , pp. 895-906
    • Duverlie, P.1    Castelain, J.M.2
  • 4
    • 24144456508 scopus 로고    scopus 로고
    • Case-based tutoring systems for procedural problem solving on the www
    • Han S.G., Lee S.G., and Jo G.S. Case-based tutoring systems for procedural problem solving on the www. Expert Systems with Applications 29 3 (2005) 573-582
    • (2005) Expert Systems with Applications , vol.29 , Issue.3 , pp. 573-582
    • Han, S.G.1    Lee, S.G.2    Jo, G.S.3
  • 5
    • 33749583888 scopus 로고    scopus 로고
    • Quantity-based approach to preliminary cost estimates for highway projects
    • Chou J.S., Peng M., Persad K.R., et al. Quantity-based approach to preliminary cost estimates for highway projects. Transportation Research Record 1946 (2006) 22-30
    • (2006) Transportation Research Record , Issue.1946 , pp. 22-30
    • Chou, J.S.1    Peng, M.2    Persad, K.R.3
  • 7
    • 0036744325 scopus 로고    scopus 로고
    • Data modelling and the application of a neural network approach to the prediction of total construction costs
    • Emsley M.W., Lowe D.J., Duff A.R., et al. Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics 20 6 (2002) 465-472
    • (2002) Construction Management and Economics , vol.20 , Issue.6 , pp. 465-472
    • Emsley, M.W.1    Lowe, D.J.2    Duff, A.R.3
  • 9
    • 33645120103 scopus 로고    scopus 로고
    • PIREM: A new model for conceptual cost estimation
    • Yu W.D. PIREM: A new model for conceptual cost estimation. Construction Management and Economics 24 3 (2006) 259-270
    • (2006) Construction Management and Economics , vol.24 , Issue.3 , pp. 259-270
    • Yu, W.D.1
  • 10
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • Hegazy T., and Ayed A. Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management 124 3 (1998) 210-219
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 210-219
    • Hegazy, T.1    Ayed, A.2
  • 11
    • 0033100590 scopus 로고    scopus 로고
    • Preliminary cost estimation of highway construction using neural networks
    • Al-Tabtabai H., Alex A.P., and Tantash M. Preliminary cost estimation of highway construction using neural networks. Cost Engineering 41 3 (1999) 19-24
    • (1999) Cost Engineering , vol.41 , Issue.3 , pp. 19-24
    • Al-Tabtabai, H.1    Alex, A.P.2    Tantash, M.3
  • 12
    • 0020825299 scopus 로고
    • Probabilistic estimating: mathematics and applications
    • Diekmann J.E. Probabilistic estimating: mathematics and applications. J. Constr. Engrg. and Mgmt. 109 3 (1983) 297-308
    • (1983) J. Constr. Engrg. and Mgmt. , vol.109 , Issue.3 , pp. 297-308
    • Diekmann, J.E.1
  • 13
    • 62649092774 scopus 로고    scopus 로고
    • Preliminary cost estimates using probabilistic simulation for highway bridge peplacement projects
    • San Diego, California, USA
    • Chou J S, Wang L, Chong W K, et al. Preliminary cost estimates using probabilistic simulation for highway bridge peplacement projects. In: American Society of Civil Engineers, Construction Research Congress. San Diego, California, USA, 2005: 467-471.
    • (2005) American Society of Civil Engineers, Construction Research Congress , pp. 467-471
    • Chou, J.S.1    Wang, L.2    Chong, W.K.3
  • 16
    • 26444548002 scopus 로고    scopus 로고
    • Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases
    • Yu W.D., and Liu Y.C. Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases. Automation in Construction 15 1 (2006) 33-46
    • (2006) Automation in Construction , vol.15 , Issue.1 , pp. 33-46
    • Yu, W.D.1    Liu, Y.C.2
  • 17
    • 33748765247 scopus 로고    scopus 로고
    • Determining attribute weights in a CBR model for early cost prediction of structural systems
    • Dogan S.Z., Arditi D., and Gunaydin H.M. Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management 132 10 (2006) 1092-1098
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.10 , pp. 1092-1098
    • Dogan, S.Z.1    Arditi, D.2    Gunaydin, H.M.3
  • 18
    • 33847026525 scopus 로고    scopus 로고
    • A case-based reasoning cost estimating model using experience by analytic hierarchy process
    • An S.H., Kim G.H., and Kang K.I. A case-based reasoning cost estimating model using experience by analytic hierarchy process. Building and Environment 42 7 (2007) 2573-2579
    • (2007) Building and Environment , vol.42 , Issue.7 , pp. 2573-2579
    • An, S.H.1    Kim, G.H.2    Kang, K.I.3
  • 22
    • 0032073403 scopus 로고    scopus 로고
    • Applying case-based reasoning technique to retaining wall selection
    • Yau N.J., and Yang J.B. Applying case-based reasoning technique to retaining wall selection. Automation in Construction 7 4 (1998) 271-283
    • (1998) Automation in Construction , vol.7 , Issue.4 , pp. 271-283
    • Yau, N.J.1    Yang, J.B.2
  • 24
    • 0003602869 scopus 로고
    • Morgan Kaufmann Publishers Inc., San Mateo, California
    • Kolodner J.L. Case-based reasoning (1993), Morgan Kaufmann Publishers Inc., San Mateo, California
    • (1993) Case-based reasoning
    • Kolodner, J.L.1
  • 26
    • 85164392958 scopus 로고
    • A study of cross-validation and bootstrap for accuracy estimation and model selection
    • San Francisco, CA
    • Kohavi R. A study of cross-validation and bootstrap for accuracy estimation and model selection. In: The 14th International Joint Conference on Artificial Intelligence (IJCAI). San Francisco, CA, 1995: 1137-1145.
    • (1995) The 14th International Joint Conference on Artificial Intelligence (IJCAI) , pp. 1137-1145
    • Kohavi, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.