1
-
-
62649163036
-
-
(cited Nov. 2006).
-
MOTC (2007). http://www.thb.gov.tw/ (cited Nov. 2006).
-
(2007)
-
-
MOTC1
-
2
-
-
2642564315
-
Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning
-
Kim G.H., An S.H., and Kang K.I. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Building and Environment 39 10 (2004) 1235-1242
-
(2004)
Building and Environment
, vol.39
, Issue.10
, pp. 1235-1242
-
-
Kim, G.H.1
An, S.H.2
Kang, K.I.3
-
4
-
-
24144456508
-
Case-based tutoring systems for procedural problem solving on the www
-
Han S.G., Lee S.G., and Jo G.S. Case-based tutoring systems for procedural problem solving on the www. Expert Systems with Applications 29 3 (2005) 573-582
-
(2005)
Expert Systems with Applications
, vol.29
, Issue.3
, pp. 573-582
-
-
Han, S.G.1
Lee, S.G.2
Jo, G.S.3
-
5
-
-
33749583888
-
Quantity-based approach to preliminary cost estimates for highway projects
-
Chou J.S., Peng M., Persad K.R., et al. Quantity-based approach to preliminary cost estimates for highway projects. Transportation Research Record 1946 (2006) 22-30
-
(2006)
Transportation Research Record
, Issue.1946
, pp. 22-30
-
-
Chou, J.S.1
Peng, M.2
Persad, K.R.3
-
7
-
-
0036744325
-
Data modelling and the application of a neural network approach to the prediction of total construction costs
-
Emsley M.W., Lowe D.J., Duff A.R., et al. Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics 20 6 (2002) 465-472
-
(2002)
Construction Management and Economics
, vol.20
, Issue.6
, pp. 465-472
-
-
Emsley, M.W.1
Lowe, D.J.2
Duff, A.R.3
-
9
-
-
33645120103
-
PIREM: A new model for conceptual cost estimation
-
Yu W.D. PIREM: A new model for conceptual cost estimation. Construction Management and Economics 24 3 (2006) 259-270
-
(2006)
Construction Management and Economics
, vol.24
, Issue.3
, pp. 259-270
-
-
Yu, W.D.1
-
10
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
Hegazy T., and Ayed A. Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management 124 3 (1998) 210-219
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.3
, pp. 210-219
-
-
Hegazy, T.1
Ayed, A.2
-
11
-
-
0033100590
-
Preliminary cost estimation of highway construction using neural networks
-
Al-Tabtabai H., Alex A.P., and Tantash M. Preliminary cost estimation of highway construction using neural networks. Cost Engineering 41 3 (1999) 19-24
-
(1999)
Cost Engineering
, vol.41
, Issue.3
, pp. 19-24
-
-
Al-Tabtabai, H.1
Alex, A.P.2
Tantash, M.3
-
12
-
-
0020825299
-
Probabilistic estimating: mathematics and applications
-
Diekmann J.E. Probabilistic estimating: mathematics and applications. J. Constr. Engrg. and Mgmt. 109 3 (1983) 297-308
-
(1983)
J. Constr. Engrg. and Mgmt.
, vol.109
, Issue.3
, pp. 297-308
-
-
Diekmann, J.E.1
-
13
-
-
62649092774
-
Preliminary cost estimates using probabilistic simulation for highway bridge peplacement projects
-
San Diego, California, USA
-
Chou J S, Wang L, Chong W K, et al. Preliminary cost estimates using probabilistic simulation for highway bridge peplacement projects. In: American Society of Civil Engineers, Construction Research Congress. San Diego, California, USA, 2005: 467-471.
-
(2005)
American Society of Civil Engineers, Construction Research Congress
, pp. 467-471
-
-
Chou, J.S.1
Wang, L.2
Chong, W.K.3
-
16
-
-
26444548002
-
Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases
-
Yu W.D., and Liu Y.C. Hybridization of CBR and numeric soft computing techniques for mining of scarce construction databases. Automation in Construction 15 1 (2006) 33-46
-
(2006)
Automation in Construction
, vol.15
, Issue.1
, pp. 33-46
-
-
Yu, W.D.1
Liu, Y.C.2
-
17
-
-
33748765247
-
Determining attribute weights in a CBR model for early cost prediction of structural systems
-
Dogan S.Z., Arditi D., and Gunaydin H.M. Determining attribute weights in a CBR model for early cost prediction of structural systems. Journal of Construction Engineering and Management 132 10 (2006) 1092-1098
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1092-1098
-
-
Dogan, S.Z.1
Arditi, D.2
Gunaydin, H.M.3
-
18
-
-
33847026525
-
A case-based reasoning cost estimating model using experience by analytic hierarchy process
-
An S.H., Kim G.H., and Kang K.I. A case-based reasoning cost estimating model using experience by analytic hierarchy process. Building and Environment 42 7 (2007) 2573-2579
-
(2007)
Building and Environment
, vol.42
, Issue.7
, pp. 2573-2579
-
-
An, S.H.1
Kim, G.H.2
Kang, K.I.3
-
22
-
-
0032073403
-
Applying case-based reasoning technique to retaining wall selection
-
Yau N.J., and Yang J.B. Applying case-based reasoning technique to retaining wall selection. Automation in Construction 7 4 (1998) 271-283
-
(1998)
Automation in Construction
, vol.7
, Issue.4
, pp. 271-283
-
-
Yau, N.J.1
Yang, J.B.2
-
24
-
-
0003602869
-
-
Morgan Kaufmann Publishers Inc., San Mateo, California
-
Kolodner J.L. Case-based reasoning (1993), Morgan Kaufmann Publishers Inc., San Mateo, California
-
(1993)
Case-based reasoning
-
-
Kolodner, J.L.1
-
26
-
-
85164392958
-
A study of cross-validation and bootstrap for accuracy estimation and model selection
-
San Francisco, CA
-
Kohavi R. A study of cross-validation and bootstrap for accuracy estimation and model selection. In: The 14th International Joint Conference on Artificial Intelligence (IJCAI). San Francisco, CA, 1995: 1137-1145.
-
(1995)
The 14th International Joint Conference on Artificial Intelligence (IJCAI)
, pp. 1137-1145
-
-
Kohavi, R.1
|