2
-
-
0020302688
-
Experiments in probabilistic cost modelling
-
P. S. Brandon (Ed.), London: E-FN Spon
-
Wilson A.J. Experiments in probabilistic cost modelling Brandon P.S. Building cost techniques; new direction 1982 169-180 E-FN Spon London
-
(1982)
Building Cost Techniques; New Direction
, pp. 169-180
-
-
Wilson, A.J.1
-
3
-
-
0025403102
-
Cost model for reinforced concrete beam and slab structures in building
-
Singh S. Cost model for reinforced concrete beam and slab structures in building Journal of Construction Engineering and Management 116 1 1990 54-67
-
(1990)
Journal of Construction Engineering and Management
, vol.116
, Issue.1
, pp. 54-67
-
-
Singh, S.1
-
5
-
-
0012517636
-
Some analysis of the use of regression as an estimating tool
-
McCaffer R. Some analysis of the use of regression as an estimating tool Quantity Surveyor 32 1975 81-86
-
(1975)
Quantity Surveyor
, vol.32
, pp. 81-86
-
-
McCaffer, R.1
-
6
-
-
0041852560
-
Cost modeling and price forecasting; practice and theory in perspective
-
Bowen P.A. Edwards P.J. Cost modeling and price forecasting; practice and theory in perspective Construction Management and Economics 3 1985 199-215
-
(1985)
Construction Management and Economics
, vol.3
, pp. 199-215
-
-
Bowen, P.A.1
Edwards, P.J.2
-
7
-
-
0030182808
-
Estimation of project total cost and duration for housing projects in the UK
-
Khosrowshahi F. Kaka A.P. Estimation of project total cost and duration for housing projects in the UK. Building and Environment 31 4 1996 373-383
-
(1996)
Building and Environment
, vol.31
, Issue.4
, pp. 373-383
-
-
Khosrowshahi, F.1
Kaka, A.P.2
-
8
-
-
0038604047
-
Forecast models for actual construction time and cost
-
Skitmore R.M. Thomas Ng.S. Forecast models for actual construction time and cost Building and Environment 38 8 2003 1075-1083
-
(2003)
Building and Environment
, vol.38
, Issue.8
, pp. 1075-1083
-
-
Skitmore, R.M.1
Thomas, Ng.S.2
-
9
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
Trost S.M. Oberlender G.D. Predicting accuracy of early cost estimates using factor analysis and multivariate regression Journal of Construction Engineering and Management 129 2 2003 198-204
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
10
-
-
2642515039
-
Developments in contract price forecasting and bidding techniques
-
R. M. Skitmore, & V. K. Marston (Eds.), London: E-FN Spon
-
Skitmore R.M. Patchell B.R.T. Developments in contract price forecasting and bidding techniques Skitmore R.M. Marston V.K. Cost modelling 1990 53-84 E-FN Spon London
-
(1990)
Cost Modelling
, pp. 53-84
-
-
Skitmore, R.M.1
Patchell, B.R.T.2
-
11
-
-
0033232380
-
Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks
-
Tam C.M. Fang C.F. Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks ACI Structural Journal 96 6 1999 927-936
-
(1999)
ACI Structural Journal
, vol.96
, Issue.6
, pp. 927-936
-
-
Tam, C.M.1
Fang, C.F.2
-
12
-
-
0032313401
-
Collaborative case-based estimating and design
-
Perera S. Watson I. Collaborative case-based estimating and design Advances in Engineering 29 10 1998 801-808
-
(1998)
Advances in Engineering
, vol.29
, Issue.10
, pp. 801-808
-
-
Perera, S.1
Watson, I.2
-
13
-
-
0027625827
-
Neural network application to cost engineering
-
McKim R.A. Neural network application to cost engineering Cost Engineering 35 7 1993 31-35
-
(1993)
Cost Engineering
, vol.35
, Issue.7
, pp. 31-35
-
-
McKim, R.A.1
-
14
-
-
0029241605
-
Neural network versus parameter-based application
-
Garza J. Rouhana K. Neural network versus parameter-based application Cost Engineering 37 2 1995 14-18
-
(1995)
Cost Engineering
, vol.37
, Issue.2
, pp. 14-18
-
-
Garza, J.1
Rouhana, K.2
-
15
-
-
0002231440
-
Cost estimation of timber bridge using neural networks
-
Creese R. Li L. Cost estimation of timber bridge using neural networks Cost Engineering 37 5 1995 17-22
-
(1995)
Cost Engineering
, vol.37
, Issue.5
, pp. 17-22
-
-
Creese, R.1
Li, L.2
-
16
-
-
0012513437
-
Neural networks for construction cost estimation
-
Li H. Neural networks for construction cost estimation Building Research and Information 23 5 1995 279-284
-
(1995)
Building Research and Information
, vol.23
, Issue.5
, pp. 279-284
-
-
Li, H.1
-
18
-
-
0031700588
-
Neural networks for cost estimation
-
Bode J. Neural networks for cost estimation Cost Engineering 40 1 1998 25-30
-
(1998)
Cost Engineering
, vol.40
, Issue.1
, pp. 25-30
-
-
Bode, J.1
-
19
-
-
0005061735
-
Quantity estimating of building with logarithm-neuron networks
-
Yeh I.C. Quantity estimating of building with logarithm-neuron networks Journal of Construction Engineering and Management 124 5 1998 374-380
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.5
, pp. 374-380
-
-
Yeh, I.C.1
-
20
-
-
0034655066
-
Neural networks for cost estimation: Simulations and pilot application
-
Bode J. Neural networks for cost estimation: Simulations and pilot application International Journal of Production Research 38 6 2000 1231-1254
-
(2000)
International Journal of Production Research
, vol.38
, Issue.6
, pp. 1231-1254
-
-
Bode, J.1
-
22
-
-
0001292966
-
The use of artificial neural networks in construction management: A review
-
Boussabaine A.H. The use of artificial neural networks in construction management: A review Construction Management and Economics 14 5 1996 427-436
-
(1996)
Construction Management and Economics
, vol.14
, Issue.5
, pp. 427-436
-
-
Boussabaine, A.H.1
-
23
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
Hegazy T. Ayed A. Neural network model for parametric cost estimation of highway projects Journal of Construction Engineering and Management 124 3 1998 210-218
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
24
-
-
0031336193
-
Cost estimation modeling: Regression versus neural network
-
Smith A.E. Mason A.K. Cost estimation modeling: Regression versus neural network Engineering Economist 42 2 1997 137-161
-
(1997)
Engineering Economist
, vol.42
, Issue.2
, pp. 137-161
-
-
Smith, A.E.1
Mason, A.K.2
-
30
-
-
0035563133
-
Case-based reasoning system and artificial neural networks: A review
-
Chen D. Burrell P. Case-based reasoning system and artificial neural networks: A review Neural Computing and Applications 10 4 2001 264-276
-
(2001)
Neural Computing and Applications
, vol.10
, Issue.4
, pp. 264-276
-
-
Chen, D.1
Burrell, P.2
-
34
-
-
0030168791
-
Developing case-based reasoning for structural design
-
Maher M.L. de Silva Garza A.G. Developing case-based reasoning for structural design IEEE Expert 7 3 1996 42-52
-
(1996)
IEEE Expert
, vol.7
, Issue.3
, pp. 42-52
-
-
Maher, M.L.1
de Silva Garza, A.G.2
-
35
-
-
0034217285
-
SEED-Config: A tool for conceptual structural design in a collaborative building design environment
-
Fenves S.J. Rivard H. Gomez N. SEED-Config: A tool for conceptual structural design in a collaborative building design environment Artificial Intelligence in Engineering 14 3 2000 233-247
-
(2000)
Artificial Intelligence in Engineering
, vol.14
, Issue.3
, pp. 233-247
-
-
Fenves, S.J.1
Rivard, H.2
Gomez, N.3
-
36
-
-
0035451322
-
The integration of environmental variables in the process of architectural design: The contribution of expert systems
-
Mazouz S. Zerouala M.S. The integration of environmental variables in the process of architectural design: The contribution of expert systems Energy and Buildings 33 7 2001 699-710
-
(2001)
Energy and Buildings
, vol.33
, Issue.7
, pp. 699-710
-
-
Mazouz, S.1
Zerouala, M.S.2
-
37
-
-
0035546364
-
A case base of case-based design tools for architecture
-
Heylighen A. Neuckermans H. A case base of case-based design tools for architecture Computer-Aided Design 33 14 2001 1111-1122
-
(2001)
Computer-Aided Design
, vol.33
, Issue.14
, pp. 1111-1122
-
-
Heylighen, A.1
Neuckermans, H.2
-
38
-
-
2642515847
-
CBRefurb: Case-based cost estimation, case based reasoning: Prospects for application
-
7 March
-
Watson I. CBRefurb: Case-based cost estimation, case based reasoning: prospects for application. IEE Colloquium 7 March 1995. p. 1-5.
-
(1995)
IEE Colloquium
, pp. 1-5
-
-
Watson, I.1
-
39
-
-
50249125049
-
A case based approach to construction process activity specification
-
Rezgui Y, Marir F, Cooper G, Yip J, Brandon P. A case based approach to construction process activity specification. Intelligent Information Systems Proceedings 1997;8-10
-
(1997)
Intelligent Information Systems Proceedings
, pp. 8-10
-
-
Rezgui, Y.1
Marir, F.2
Cooper, G.3
Yip, J.4
Brandon, P.5
-
42
-
-
0032073403
-
Applying case-based reasoning technique to retaining wall selection
-
Yau N.J. Yang J.B. Applying case-based reasoning technique to retaining wall selection Automation in Construction 7 4 1998 271-283
-
(1998)
Automation in Construction
, vol.7
, Issue.4
, pp. 271-283
-
-
Yau, N.J.1
Yang, J.B.2
-
43
-
-
0032647146
-
Information modeling for case-based construction planning of highway bridge projects
-
Tah J.H.M. Carr V. Howes R. Information modeling for case-based construction planning of highway bridge projects Advances in Engineering Software 30 7 1999 495-509
-
(1999)
Advances in Engineering Software
, vol.30
, Issue.7
, pp. 495-509
-
-
Tah, J.H.M.1
Carr, V.2
Howes, R.3
-
44
-
-
0033156950
-
Comparison of case-based reasoning and artificial neural networks
-
Arditi D. Tokdemir O.B. Comparison of case-based reasoning and artificial neural networks Journal of Computing in Civil Engineering 13 3 1999 162-169
-
(1999)
Journal of Computing in Civil Engineering
, vol.13
, Issue.3
, pp. 162-169
-
-
Arditi, D.1
Tokdemir, O.B.2
-
47
-
-
2642534679
-
The effect of project information on the accuracy of building price forecasts
-
P. S. Brandon (Ed.), London: E-FN Spon
-
Skitmore M. The effect of project information on the accuracy of building price forecasts Brandon P.S. Building cost modelling and computers 1987 327-336 E-FN Spon London
-
(1987)
Building Cost Modelling and Computers
, pp. 327-336
-
-
Skitmore, M.1
|