메뉴 건너뛰기




Volumn 13, Issue SUPPL. 1, 2008, Pages 266-272

Construction Process Simulation and Safety Analysis Based on Building Information Model and 4D Technology

Author keywords

building information model (BIM); construction simulation; four dimensional (4D) technology; industry foundation class; structure analysis

Indexed keywords

ARCHITECTURAL DESIGN; CONSTRUCTION; PROJECT MANAGEMENT; SECURITY SYSTEMS; TECHNOLOGY;

EID: 62649126264     PISSN: 10070214     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1007-0214(08)70160-3     Document Type: Article
Times cited : (53)

References (15)
  • 3
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • Koo B., and Fischer M. Feasibility study of 4D CAD in commercial construction. Construction Engineering and Management 126 4 (2000) 251-260
    • (2000) Construction Engineering and Management , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 4
    • 2942740922 scopus 로고    scopus 로고
    • The product model and fourth dimension project
    • Calvin K., Martin F., Reijo H., et al. The product model and fourth dimension project. ITcon 8 Special Issue (2003) 137-166
    • (2003) ITcon , vol.8 , Issue.SPEC. ISSUE , pp. 137-166
    • Calvin, K.1    Martin, F.2    Reijo, H.3
  • 7
    • 21844461066 scopus 로고    scopus 로고
    • A 4D construction management system based on IFC standard and engineering information model
    • (in Chinese).
    • Zhang J., Cao M., and Zhang Y. A 4D construction management system based on IFC standard and engineering information model. Engineering Mechanics 22 suppl. (2005) 220-227 (in Chinese).
    • (2005) Engineering Mechanics , vol.22 , Issue.SUPPL , pp. 220-227
    • Zhang, J.1    Cao, M.2    Zhang, Y.3
  • 9
    • 2942579358 scopus 로고    scopus 로고
    • Fully stochastic analysis method for structural dynamic reliability
    • (in Chinese).
    • Zuo Z., and Liu X. Fully stochastic analysis method for structural dynamic reliability. Journal of Tsinghua University (Science and Technology) 44 3 (2004) 395-397 (in Chinese).
    • (2004) Journal of Tsinghua University (Science and Technology) , vol.44 , Issue.3 , pp. 395-397
    • Zuo, Z.1    Liu, X.2
  • 11
    • 0027594256 scopus 로고
    • Reliability-based service-life assessment of aging concrete structures
    • Mori Y., and Ellingwood B.R. Reliability-based service-life assessment of aging concrete structures. Structural Engineering 119 5 (1993) 1600-1621
    • (1993) Structural Engineering , vol.119 , Issue.5 , pp. 1600-1621
    • Mori, Y.1    Ellingwood, B.R.2
  • 12
    • 0038267857 scopus 로고    scopus 로고
    • A core system for design information management using industry foundation classes
    • Lee K., Chin S., and Kim J. A core system for design information management using industry foundation classes. Computer-Aided Civil and Infrastructure Engineering 18 (2003) 286-298
    • (2003) Computer-Aided Civil and Infrastructure Engineering , vol.18 , pp. 286-298
    • Lee, K.1    Chin, S.2    Kim, J.3
  • 13
    • 29144527545 scopus 로고    scopus 로고
    • IFC model viewer to support nD model application
    • Fu C., Aouad G., Lee A., et al. IFC model viewer to support nD model application. Automation in Construction 15 (2006) 178-185
    • (2006) Automation in Construction , vol.15 , pp. 178-185
    • Fu, C.1    Aouad, G.2    Lee, A.3
  • 14
    • 10444231261 scopus 로고    scopus 로고
    • Implementation of IFC-based web server for collaborative building design between architects and structural engineers
    • Chen P.-H., Cui L., Wan C., et al. Implementation of IFC-based web server for collaborative building design between architects and structural engineers. Automation in Construction 14 (2005) 115-128
    • (2005) Automation in Construction , vol.14 , pp. 115-128
    • Chen, P.-H.1    Cui, L.2    Wan, C.3
  • 15
    • 0036680436 scopus 로고    scopus 로고
    • Hybrid intelligence utilization for construction site layout
    • Zhang J.P., Liu L.H., and Coble R.J. Hybrid intelligence utilization for construction site layout. Automation in Construction 11 5 (2002) 511-519
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 511-519
    • Zhang, J.P.1    Liu, L.H.2    Coble, R.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.