-
1
-
-
0036778727
-
Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution
-
Liu J., Jiang Y., and Zhou Z.L. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution. IIE Transactions 34 (2002) 905-914
-
(2002)
IIE Transactions
, vol.34
, pp. 905-914
-
-
Liu, J.1
Jiang, Y.2
Zhou, Z.L.3
-
2
-
-
18744387412
-
An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem
-
Liu J., and Jiang Y. An efficient optimal solution to the two-hoist no-wait cyclic scheduling problem. Operations Research 55 (2005) 313-327
-
(2005)
Operations Research
, vol.55
, pp. 313-327
-
-
Liu, J.1
Jiang, Y.2
-
4
-
-
0037404554
-
Single hoist cyclic scheduling with multiple tanks: a material handling solution
-
Zhou Z.L., and Li L. Single hoist cyclic scheduling with multiple tanks: a material handling solution. Computers & Operations Research 30 (2003) 811-819
-
(2003)
Computers & Operations Research
, vol.30
, pp. 811-819
-
-
Zhou, Z.L.1
Li, L.2
-
5
-
-
0031186888
-
Determining the optimal move times for a given cyclic schedule of a material handling hoist
-
Ng W.C., and Leung J. Determining the optimal move times for a given cyclic schedule of a material handling hoist. Computers & Industrial Engineering 32 3 (1997) 595-606
-
(1997)
Computers & Industrial Engineering
, vol.32
, Issue.3
, pp. 595-606
-
-
Ng, W.C.1
Leung, J.2
-
6
-
-
33645678746
-
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures
-
Liu J., Wan Y.-W., and Wang L. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures. Naval Research Logistics 53 (2006) 60-74
-
(2006)
Naval Research Logistics
, vol.53
, pp. 60-74
-
-
Liu, J.1
Wan, Y.-W.2
Wang, L.3
-
8
-
-
0037209478
-
A multiple-crane-constrained scheduling problem in a container terminal
-
Bish E.K. A multiple-crane-constrained scheduling problem in a container terminal. European Journal of Operational Research 144 (2003) 83-107
-
(2003)
European Journal of Operational Research
, vol.144
, pp. 83-107
-
-
Bish, E.K.1
-
9
-
-
10444233579
-
Crane scheduling in container yards with inter-crane interference
-
Ng W.C. Crane scheduling in container yards with inter-crane interference. European Journal of Operational Research 164 (2005) 64-78
-
(2005)
European Journal of Operational Research
, vol.164
, pp. 64-78
-
-
Ng, W.C.1
-
10
-
-
0033544447
-
Scheduling of the batch annealing process-deterministic case
-
Moon S., and Hrymak A.N. Scheduling of the batch annealing process-deterministic case. Computers and Chemical Engineering 23 (1999) 1193-1208
-
(1999)
Computers and Chemical Engineering
, vol.23
, pp. 1193-1208
-
-
Moon, S.1
Hrymak, A.N.2
-
11
-
-
20944432259
-
Optimal scheduling method for bell-type batch annealing shop and its application
-
Liu Q.L., Wang W., Zhan H.R., Wang Z.G., and Liu R.G. Optimal scheduling method for bell-type batch annealing shop and its application. Control Engineering Practice 13 (2005) 1315-1325
-
(2005)
Control Engineering Practice
, vol.13
, pp. 1315-1325
-
-
Liu, Q.L.1
Wang, W.2
Zhan, H.R.3
Wang, Z.G.4
Liu, R.G.5
-
12
-
-
62749195508
-
Crane control with time-based and position constraints
-
December 12-14, New Orleans, LA, USA;
-
O. Barbarisi, C.D. Vecchio, A. Parisio, Crane control with time-based and position constraints. In: Proceedings of the 46th IEEE conference on decision and control, December 12-14, New Orleans, LA, USA; 2007.
-
(2007)
Proceedings of the 46th IEEE conference on decision and control
-
-
Barbarisi, O.1
Vecchio, C.D.2
Parisio, A.3
-
13
-
-
43949091833
-
Scheduling parallel machines with inclusive processing set restrictions
-
Ou J.W., Leung J.Y.T., and Li C.L. Scheduling parallel machines with inclusive processing set restrictions. Naval Research Logistics 55 (2008) 328-338
-
(2008)
Naval Research Logistics
, vol.55
, pp. 328-338
-
-
Ou, J.W.1
Leung, J.Y.T.2
Li, C.L.3
-
14
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
Johnson S.M. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics 1 (1954) 7-61
-
(1954)
Naval Research Logistics
, vol.1
, pp. 7-61
-
-
Johnson, S.M.1
-
15
-
-
0026417688
-
Branch and bound algorithm for the flow shop with multiple processors
-
Brah S.A., and Hunsucker J.L. Branch and bound algorithm for the flow shop with multiple processors. European Journal of Operational Research 51 (1991) 88-99
-
(1991)
European Journal of Operational Research
, vol.51
, pp. 88-99
-
-
Brah, S.A.1
Hunsucker, J.L.2
-
16
-
-
0029254603
-
Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage
-
Chen B. Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage. Journal of the Operational Research Society 46 (1995) 234-244
-
(1995)
Journal of the Operational Research Society
, vol.46
, pp. 234-244
-
-
Chen, B.1
-
17
-
-
0003899269
-
Heuristic algorithms for the two-stage hybrid flowshop problem
-
Haouari M., and M'Hallah R. Heuristic algorithms for the two-stage hybrid flowshop problem. Operations Research Letters 21 (1997) 43-53
-
(1997)
Operations Research Letters
, vol.21
, pp. 43-53
-
-
Haouari, M.1
M'Hallah, R.2
-
19
-
-
26444492122
-
Scheduling two-stage hybrid flow shop with availability constraints
-
Allaoui H., and Artiba A. Scheduling two-stage hybrid flow shop with availability constraints. Computers & Operations Research 33 (2006) 1399-1419
-
(2006)
Computers & Operations Research
, vol.33
, pp. 1399-1419
-
-
Allaoui, H.1
Artiba, A.2
-
20
-
-
0346302274
-
Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops
-
Koulamas C., and Kyparisis G.J. Asymptotically optimal linear time algorithms for two-stage and three-stage flexible flow shops. Naval Research Logistics 47 (2000) 259-268
-
(2000)
Naval Research Logistics
, vol.47
, pp. 259-268
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
21
-
-
0002595962
-
On some geometric methods in the scheduling theory: a survey
-
Sevast'janov S.V. On some geometric methods in the scheduling theory: a survey. Discrete Applied Mathematics 55 (1994) 59-82
-
(1994)
Discrete Applied Mathematics
, vol.55
, pp. 59-82
-
-
Sevast'janov, S.V.1
-
22
-
-
0033079757
-
General multiprocessor task scheduling
-
Chen J., and Lee C.Y. General multiprocessor task scheduling. Naval Research Logistics 46 (1999) 57-74
-
(1999)
Naval Research Logistics
, vol.46
, pp. 57-74
-
-
Chen, J.1
Lee, C.Y.2
-
24
-
-
0023170393
-
Using dual approximation algorithms for scheduling problems: theoretical and practical results
-
Hochbaum D.S., and Shmoys D.B. Using dual approximation algorithms for scheduling problems: theoretical and practical results. Journal of the Association for Computing Machinery 34 (1987) 144-162
-
(1987)
Journal of the Association for Computing Machinery
, vol.34
, pp. 144-162
-
-
Hochbaum, D.S.1
Shmoys, D.B.2
|