-
1
-
-
0028439401
-
Inventory Models Involving Lead Time as a Decision Variable
-
Ben-Daya, M., and Raouf, A. (1994), "Inventory Models Involving Lead Time as a Decision Variable," Journal of the Operational Research Society, 45, 579-582.
-
(1994)
Journal of the Operational Research Society
, vol.45
, pp. 579-582
-
-
Ben-Daya, M.1
Raouf, A.2
-
2
-
-
84985822213
-
The Classical Economic Production Quantity Model With Setup Cost as a Function of Capital Expenditure
-
Billington, P.J. (1987), "The Classical Economic Production Quantity Model With Setup Cost as a Function of Capital Expenditure," Decision Sciences, 18, 25-42.
-
(1987)
Decision Sciences
, vol.18
, pp. 25-42
-
-
Billington, P.J.1
-
3
-
-
16244389992
-
Single Item Lot Sizing Problems
-
Brahimi, N., Dauzere-Peres, S., Najid, N.M., and Nordli, A. (2006), "Single Item Lot Sizing Problems," European Journal of Operations Research, 168, 1-16.
-
(2006)
European Journal of Operations Research
, vol.168
, pp. 1-16
-
-
Brahimi, N.1
Dauzere-Peres, S.2
Najid, N.M.3
Nordli, A.4
-
4
-
-
9544242734
-
Turnpike Policies for Periodic Review Inventory Model with Emergency Orders
-
Bylka, S. (2005), "Turnpike Policies for Periodic Review Inventory Model with Emergency Orders," International Journal of Production Economics, 93-94, 357-373.
-
(2005)
International Journal of Production Economics
, vol.93-94
, pp. 357-373
-
-
Bylka, S.1
-
5
-
-
16244398877
-
Retailer's Optimal Pricing and Lot-sizing Policies for Deteriorating Items with Partial Backlogging
-
Chang, H.-J., Teng, J.-T., Ouyang, L.-Y., and Dye, C.-Y. (2006), "Retailer's Optimal Pricing and Lot-sizing Policies for Deteriorating Items with Partial Backlogging," European Journal of Operational Research, 168, 51-64.
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 51-64
-
-
Chang, H.-J.1
Teng, J.-T.2
Ouyang, L.-Y.3
Dye, C.-Y.4
-
6
-
-
61549098576
-
Inventory Model Involving Lead Time and Set up Cost as Decision Variables
-
Cheng, T.-L., Huang C.-K., and Chen, K.-C. (2004), "Inventory Model Involving Lead Time and Set up Cost as Decision Variables," Journal of Statistics and Management Systems, 7, 134-141.
-
(2004)
Journal of Statistics and Management Systems
, vol.7
, pp. 134-141
-
-
Cheng, T.-L.1
Huang, C.-K.2
Chen, K.-C.3
-
7
-
-
61549083603
-
Economic Manufacturing Quantity Model Involving Lead Time and Setup Cost Reduction Investment as Decision Variables
-
Chung, K.J., and Huang, C.K. (1998), "Economic Manufacturing Quantity Model Involving Lead Time and Setup Cost Reduction Investment as Decision Variables," International Journal of Operations and Quantitative Management, 4, 209-216.
-
(1998)
International Journal of Operations and Quantitative Management
, vol.4
, pp. 209-216
-
-
Chung, K.J.1
Huang, C.K.2
-
8
-
-
0016521332
-
Effect of Lead Time on Inventory: A Static Analysis
-
Das, C. (1975), "Effect of Lead Time on Inventory: A Static Analysis," Operational Research Quarterly, 26, 273-282.
-
(1975)
Operational Research Quarterly
, vol.26
, pp. 273-282
-
-
Das, C.1
-
9
-
-
13544267427
-
An Interactive Method for Inventory Control with Fuzzy Lead Time and Dynamic Demand
-
Dey, J.K., Kar, S., and Maiti, M. (2005,), "An Interactive Method for Inventory Control with Fuzzy Lead Time and Dynamic Demand," European Journal of Operational Research, 167, 381-397.
-
(2005)
European Journal of Operational Research
, vol.167
, pp. 381-397
-
-
Dey, J.K.1
Kar, S.2
Maiti, M.3
-
10
-
-
0027642234
-
The Distribution Free News Boy Problem: Review and Extensions
-
Gallego, G., and Moon, I. (1993), "The Distribution Free News Boy Problem: Review and Extensions," Journal of the Operational Research Society, 44, 825-834.
-
(1993)
Journal of the Operational Research Society
, vol.44
, pp. 825-834
-
-
Gallego, G.1
Moon, I.2
-
11
-
-
0026819506
-
Order Point/Order Quantity Models With Random Yield
-
Gerchak, Y. (1992), "Order Point/Order Quantity Models With Random Yield," International Journal of Production Economics, 26, 297-298.
-
(1992)
International Journal of Production Economics
, vol.26
, pp. 297-298
-
-
Gerchak, Y.1
-
12
-
-
84989730175
-
Yield Variability, Cost Tradeoffs and Diversification in the EOQ Model
-
Gerchak, Y., and Parlar, M. (1990), "Yield Variability, Cost Tradeoffs and Diversification in the EOQ Model," Noval Research Logistics, 37, 341-354.
-
(1990)
Noval Research Logistics
, vol.37
, pp. 341-354
-
-
Gerchak, Y.1
Parlar, M.2
-
13
-
-
9644264287
-
Optimal Design of Unreliable Production - Inventory Systems with Variable Production Rate
-
Giri, B.C., Yun, W.Y., and Dohi, T. (2005), "Optimal Design of Unreliable Production - Inventory Systems with Variable Production Rate," European Journal of Operational Research, 142, 372-386.
-
(2005)
European Journal of Operational Research
, vol.142
, pp. 372-386
-
-
Giri, B.C.1
Yun, W.Y.2
Dohi, T.3
-
14
-
-
2142818460
-
Optimal Production Cycle, Procurement Schedules, and Joint Investment in an Imperfect Production System
-
Hong, JD. (1997), "Optimal Production Cycle, Procurement Schedules, and Joint Investment in an Imperfect Production System," European Journal of Operational Research, 100, 413-428.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 413-428
-
-
Hong, J.D.1
-
15
-
-
0020207569
-
A Lot Size Model with Backlogging When the Amount Received Is Uncertain
-
Karlo, A.H., and Gohil, M.M. (1982), "A Lot Size Model with Backlogging When the Amount Received Is Uncertain," International Journal of Production Research, 20, 775-786.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 775-786
-
-
Karlo, A.H.1
Gohil, M.M.2
-
16
-
-
33746257519
-
A Joint Optimal Pricing, Rebate Value, and Lot Sizing Model
-
Khouja, M. (2006), "A Joint Optimal Pricing, Rebate Value, and Lot Sizing Model," European Journal of Operational Research, 174, 706-723.
-
(2006)
European Journal of Operational Research
, vol.174
, pp. 706-723
-
-
Khouja, M.1
-
17
-
-
0002505095
-
An Analytical Determination of Lead Time with Normal Demand
-
Liao, C.J., and Shyu, C.H. (1991), "An Analytical Determination of Lead Time with Normal Demand," International Journal of Operations & Production Management, 11, 72-78.
-
(1991)
International Journal of Operations & Production Management
, vol.11
, pp. 72-78
-
-
Liao, C.J.1
Shyu, C.H.2
-
18
-
-
12144282022
-
An Inventory System with Investment to Reduce Yield Variability and Setup Cost
-
Lin, L.C., and Hou, K.L. (2005), "An Inventory System with Investment to Reduce Yield Variability and Setup Cost," Journal of the Operational Research Society, 56, 67-74.
-
(2005)
Journal of the Operational Research Society
, vol.56
, pp. 67-74
-
-
Lin, L.C.1
Hou, K.L.2
-
19
-
-
0018456108
-
Stock Control When the Lead Time Cannot Be Considered Constant
-
Magson, D. (1979), "Stock Control When the Lead Time Cannot Be Considered Constant," Journal of the Operational Research Society, 30, 317-322.
-
(1979)
Journal of the Operational Research Society
, vol.30
, pp. 317-322
-
-
Magson, D.1
-
20
-
-
13544252490
-
Analysis of Optimal Opportunistic Replenishment Policies for Inventory Systems by Using a (s, S) Model with a Maximum Issue Quantity Restriction
-
Mak, K.L., Lai, K.K., Ng, W.C., and Yiu, K.F.C. (2005), "Analysis of Optimal Opportunistic Replenishment Policies for Inventory Systems by Using a (s, S) Model with a Maximum Issue Quantity Restriction," European Journal of Operational research, 166, 385-05.
-
(2005)
European Journal of Operational research
, vol.166
, pp. 385-405
-
-
Mak, K.L.1
Lai, K.K.2
Ng, W.C.3
Yiu, K.F.C.4
-
21
-
-
84985817800
-
The Lot-size Reorder-point Model with Upstream-downstream Uncertainty
-
Noori, AH., and Keller, G. (1986), "The Lot-size Reorder-point Model with Upstream-downstream Uncertainty," Decision sciences, 17, 285-291.
-
(1986)
Decision sciences
, vol.17
, pp. 285-291
-
-
Noori, A.H.1
Keller, G.2
-
22
-
-
0033285739
-
Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders
-
Ouyang, L.Y., Cheng, C.K., and Chang, H.C. (1999), "Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders," Journal of the Operational Research Society, 50, 1272-1279.
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 1272-1279
-
-
Ouyang, L.Y.1
Cheng, C.K.2
Chang, H.C.3
-
23
-
-
0035448302
-
Mixture Inventory Model Involving Variable Lead Time and Controllable Backorder Rate
-
Ouyang, L.Y., and Chuang, B.R. (2001), "Mixture Inventory Model Involving Variable Lead Time and Controllable Backorder Rate," Computers and Industrial Engineering, 40, 339-348.
-
(2001)
Computers and Industrial Engineering
, vol.40
, pp. 339-348
-
-
Ouyang, L.Y.1
Chuang, B.R.2
-
24
-
-
9544226435
-
Integrated Inventory Models With Controllable Lead Time and Backorder Discount Considerations
-
Pan, J.C.-H., and Hsiao, Y.-C. (2005), "Integrated Inventory Models With Controllable Lead Time and Backorder Discount Considerations," International Journal of Production Economics, 93-94, 387-397.
-
(2005)
International Journal of Production Economics
, vol.93-94
, pp. 387-397
-
-
Pan, J.C.-H.1
Hsiao, Y.-C.2
-
25
-
-
0027904996
-
Diversification Under Yield Randomness in Inventory Models
-
Parlar, M., and Wang, D. (1993), "Diversification Under Yield Randomness in Inventory Models," European Journal of Operational Research, 66, 52-64.
-
(1993)
European Journal of Operational Research
, vol.66
, pp. 52-64
-
-
Parlar, M.1
Wang, D.2
-
26
-
-
0000752798
-
Investing in Reduced Setups in the EOQ Model
-
Porteus, E.L. (1985), "Investing in Reduced Setups in the EOQ Model," Management Science, 31, 998-1010.
-
(1985)
Management Science
, vol.31
, pp. 998-1010
-
-
Porteus, E.L.1
-
27
-
-
0022613610
-
Optimal Lot Sizing Process Quality Improvement and Setup Cost Reduction
-
Porteus, EL. (1986), "Optimal Lot Sizing Process Quality Improvement and Setup Cost Reduction," Operations Research, 34, 137-144.
-
(1986)
Operations Research
, vol.34
, pp. 137-144
-
-
Porteus, E.L.1
-
28
-
-
19744377965
-
Joint Pricing and Inventory Policies for Make-to-stock Products with Deterministic Price-sensitive Demand
-
Ray, S., Gerchak, Y., and Jewkes, E.M. (2005), "Joint Pricing and Inventory Policies for Make-to-stock Products with Deterministic Price-sensitive Demand," International Journal of Production Economics, 97, 143-158.
-
(2005)
International Journal of Production Economics
, vol.97
, pp. 143-158
-
-
Ray, S.1
Gerchak, Y.2
Jewkes, E.M.3
-
29
-
-
9544255701
-
A Continuous Production - Inventory Problem with Regeneration Cycles
-
Rempala, R. (2005), "A Continuous Production - Inventory Problem with Regeneration Cycles," International Journal of Production Economics, 93-94, 447-454.
-
(2005)
International Journal of Production Economics
, vol.93-94
, pp. 447-454
-
-
Rempala, R.1
-
30
-
-
0031145351
-
Manufacturing Setup Cost Reduction Under Variable Lead Time and Finite Opportunities for Investment
-
Sarkar, B.R., and Coates, E.R. (1997), "Manufacturing Setup Cost Reduction Under Variable Lead Time and Finite Opportunities for Investment," International Journal of production Economics, 49, 237-247.
-
(1997)
International Journal of production Economics
, vol.49
, pp. 237-247
-
-
Sarkar, B.R.1
Coates, E.R.2
-
31
-
-
9544221665
-
Optimal Inventory Policies When Sales Are Discretionary
-
Scarf, E.H. (2005), "Optimal Inventory Policies When Sales Are Discretionary," International Journal of Production Economics, 93-94, 111-119.
-
(2005)
International Journal of Production Economics
, vol.93-94
, pp. 111-119
-
-
Scarf, E.H.1
-
32
-
-
0016924731
-
Establishing the Reorder Quantity When the Amount Received Is Uncertain
-
Silver, EA. (1976), "Establishing the Reorder Quantity When the Amount Received Is Uncertain," INFOR, 14, 32-39.
-
(1976)
INFOR
, vol.14
, pp. 32-39
-
-
Silver, E.A.1
-
33
-
-
12144278689
-
Yield Variability in Manufacturing Rework and Scrap Policies
-
Ph.D. Thesis, Graduate School of Business, Stanford University Stanford, CA
-
Spence, A.M. (1988) "Yield Variability in Manufacturing Rework and Scrap Policies", Ph.D. Thesis, Graduate School of Business, Stanford University Stanford, CA.
-
(1988)
-
-
Spence, A.M.1
-
34
-
-
9544249379
-
Considering Stochastic Lead Times in a Manufacturing/ Remanufacturing System with Deterministic Demands and Returns
-
Tang, O., and Grubbstrom, W.R. (2005), "Considering Stochastic Lead Times in a Manufacturing/ Remanufacturing System with Deterministic Demands and Returns," International Journal of Production Economics., 93-94, 285-30.
-
(2005)
International Journal of Production Economics
, vol.93-94
, pp. 285-330
-
-
Tang, O.1
Grubbstrom, W.R.2
-
35
-
-
0000455414
-
Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
-
Wang, Y., and Gerchak, Y. (1996), "Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand," Management Science, 42, 130-137.
-
(1996)
Management Science
, vol.42
, pp. 130-137
-
-
Wang, Y.1
Gerchak, Y.2
-
36
-
-
0001198301
-
Lot Sizing with Random Yields, a Review
-
Yano, C.A., and Lee, H.L. (1995), "Lot Sizing with Random Yields, a Review," Operations Research, 43, 311-334.
-
(1995)
Operations Research
, vol.43
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.L.2
-
37
-
-
14944362698
-
A Heuristic Approach for Multiple Items and Location Ordering Problem with Quantity Discount and Capacity Constraint
-
You, P.-S. (2005), "A Heuristic Approach for Multiple Items and Location Ordering Problem with Quantity Discount and Capacity Constraint," Journal of the Operational Research Society, 54, 307-316.
-
(2005)
Journal of the Operational Research Society
, vol.54
, pp. 307-316
-
-
You, P.-S.1
|