메뉴 건너뛰기




Volumn 40, Issue 3, 2009, Pages 245-254

A continuous review inventory model with controllable backorder rate and investments

Author keywords

Controllable backorder rate; Inventory; Reducing lead time and setup cost; Yield randomness

Indexed keywords

COST REDUCTION; CUSTOMER SATISFACTION; INVENTORY CONTROL; NORMAL DISTRIBUTION; OPTIMIZATION; SALES;

EID: 61549085853     PISSN: 00207721     EISSN: 14645319     Source Type: Journal    
DOI: 10.1080/00207720802299028     Document Type: Article
Times cited : (12)

References (37)
  • 1
  • 2
    • 84985822213 scopus 로고
    • The Classical Economic Production Quantity Model With Setup Cost as a Function of Capital Expenditure
    • Billington, P.J. (1987), "The Classical Economic Production Quantity Model With Setup Cost as a Function of Capital Expenditure," Decision Sciences, 18, 25-42.
    • (1987) Decision Sciences , vol.18 , pp. 25-42
    • Billington, P.J.1
  • 4
    • 9544242734 scopus 로고    scopus 로고
    • Turnpike Policies for Periodic Review Inventory Model with Emergency Orders
    • Bylka, S. (2005), "Turnpike Policies for Periodic Review Inventory Model with Emergency Orders," International Journal of Production Economics, 93-94, 357-373.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 357-373
    • Bylka, S.1
  • 5
    • 16244398877 scopus 로고    scopus 로고
    • Retailer's Optimal Pricing and Lot-sizing Policies for Deteriorating Items with Partial Backlogging
    • Chang, H.-J., Teng, J.-T., Ouyang, L.-Y., and Dye, C.-Y. (2006), "Retailer's Optimal Pricing and Lot-sizing Policies for Deteriorating Items with Partial Backlogging," European Journal of Operational Research, 168, 51-64.
    • (2006) European Journal of Operational Research , vol.168 , pp. 51-64
    • Chang, H.-J.1    Teng, J.-T.2    Ouyang, L.-Y.3    Dye, C.-Y.4
  • 7
    • 61549083603 scopus 로고    scopus 로고
    • Economic Manufacturing Quantity Model Involving Lead Time and Setup Cost Reduction Investment as Decision Variables
    • Chung, K.J., and Huang, C.K. (1998), "Economic Manufacturing Quantity Model Involving Lead Time and Setup Cost Reduction Investment as Decision Variables," International Journal of Operations and Quantitative Management, 4, 209-216.
    • (1998) International Journal of Operations and Quantitative Management , vol.4 , pp. 209-216
    • Chung, K.J.1    Huang, C.K.2
  • 8
    • 0016521332 scopus 로고
    • Effect of Lead Time on Inventory: A Static Analysis
    • Das, C. (1975), "Effect of Lead Time on Inventory: A Static Analysis," Operational Research Quarterly, 26, 273-282.
    • (1975) Operational Research Quarterly , vol.26 , pp. 273-282
    • Das, C.1
  • 9
    • 13544267427 scopus 로고    scopus 로고
    • An Interactive Method for Inventory Control with Fuzzy Lead Time and Dynamic Demand
    • Dey, J.K., Kar, S., and Maiti, M. (2005,), "An Interactive Method for Inventory Control with Fuzzy Lead Time and Dynamic Demand," European Journal of Operational Research, 167, 381-397.
    • (2005) European Journal of Operational Research , vol.167 , pp. 381-397
    • Dey, J.K.1    Kar, S.2    Maiti, M.3
  • 10
    • 0027642234 scopus 로고
    • The Distribution Free News Boy Problem: Review and Extensions
    • Gallego, G., and Moon, I. (1993), "The Distribution Free News Boy Problem: Review and Extensions," Journal of the Operational Research Society, 44, 825-834.
    • (1993) Journal of the Operational Research Society , vol.44 , pp. 825-834
    • Gallego, G.1    Moon, I.2
  • 11
  • 12
    • 84989730175 scopus 로고
    • Yield Variability, Cost Tradeoffs and Diversification in the EOQ Model
    • Gerchak, Y., and Parlar, M. (1990), "Yield Variability, Cost Tradeoffs and Diversification in the EOQ Model," Noval Research Logistics, 37, 341-354.
    • (1990) Noval Research Logistics , vol.37 , pp. 341-354
    • Gerchak, Y.1    Parlar, M.2
  • 13
    • 9644264287 scopus 로고    scopus 로고
    • Optimal Design of Unreliable Production - Inventory Systems with Variable Production Rate
    • Giri, B.C., Yun, W.Y., and Dohi, T. (2005), "Optimal Design of Unreliable Production - Inventory Systems with Variable Production Rate," European Journal of Operational Research, 142, 372-386.
    • (2005) European Journal of Operational Research , vol.142 , pp. 372-386
    • Giri, B.C.1    Yun, W.Y.2    Dohi, T.3
  • 14
    • 2142818460 scopus 로고    scopus 로고
    • Optimal Production Cycle, Procurement Schedules, and Joint Investment in an Imperfect Production System
    • Hong, JD. (1997), "Optimal Production Cycle, Procurement Schedules, and Joint Investment in an Imperfect Production System," European Journal of Operational Research, 100, 413-428.
    • (1997) European Journal of Operational Research , vol.100 , pp. 413-428
    • Hong, J.D.1
  • 15
    • 0020207569 scopus 로고
    • A Lot Size Model with Backlogging When the Amount Received Is Uncertain
    • Karlo, A.H., and Gohil, M.M. (1982), "A Lot Size Model with Backlogging When the Amount Received Is Uncertain," International Journal of Production Research, 20, 775-786.
    • (1982) International Journal of Production Research , vol.20 , pp. 775-786
    • Karlo, A.H.1    Gohil, M.M.2
  • 16
    • 33746257519 scopus 로고    scopus 로고
    • A Joint Optimal Pricing, Rebate Value, and Lot Sizing Model
    • Khouja, M. (2006), "A Joint Optimal Pricing, Rebate Value, and Lot Sizing Model," European Journal of Operational Research, 174, 706-723.
    • (2006) European Journal of Operational Research , vol.174 , pp. 706-723
    • Khouja, M.1
  • 18
    • 12144282022 scopus 로고    scopus 로고
    • An Inventory System with Investment to Reduce Yield Variability and Setup Cost
    • Lin, L.C., and Hou, K.L. (2005), "An Inventory System with Investment to Reduce Yield Variability and Setup Cost," Journal of the Operational Research Society, 56, 67-74.
    • (2005) Journal of the Operational Research Society , vol.56 , pp. 67-74
    • Lin, L.C.1    Hou, K.L.2
  • 19
    • 0018456108 scopus 로고
    • Stock Control When the Lead Time Cannot Be Considered Constant
    • Magson, D. (1979), "Stock Control When the Lead Time Cannot Be Considered Constant," Journal of the Operational Research Society, 30, 317-322.
    • (1979) Journal of the Operational Research Society , vol.30 , pp. 317-322
    • Magson, D.1
  • 20
    • 13544252490 scopus 로고    scopus 로고
    • Analysis of Optimal Opportunistic Replenishment Policies for Inventory Systems by Using a (s, S) Model with a Maximum Issue Quantity Restriction
    • Mak, K.L., Lai, K.K., Ng, W.C., and Yiu, K.F.C. (2005), "Analysis of Optimal Opportunistic Replenishment Policies for Inventory Systems by Using a (s, S) Model with a Maximum Issue Quantity Restriction," European Journal of Operational research, 166, 385-05.
    • (2005) European Journal of Operational research , vol.166 , pp. 385-405
    • Mak, K.L.1    Lai, K.K.2    Ng, W.C.3    Yiu, K.F.C.4
  • 21
    • 84985817800 scopus 로고
    • The Lot-size Reorder-point Model with Upstream-downstream Uncertainty
    • Noori, AH., and Keller, G. (1986), "The Lot-size Reorder-point Model with Upstream-downstream Uncertainty," Decision sciences, 17, 285-291.
    • (1986) Decision sciences , vol.17 , pp. 285-291
    • Noori, A.H.1    Keller, G.2
  • 22
    • 0033285739 scopus 로고    scopus 로고
    • Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders
    • Ouyang, L.Y., Cheng, C.K., and Chang, H.C. (1999), "Lead Time and Ordering Cost Reductions in Continuous Review Inventory Systems with Partial Backorders," Journal of the Operational Research Society, 50, 1272-1279.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 1272-1279
    • Ouyang, L.Y.1    Cheng, C.K.2    Chang, H.C.3
  • 23
    • 0035448302 scopus 로고    scopus 로고
    • Mixture Inventory Model Involving Variable Lead Time and Controllable Backorder Rate
    • Ouyang, L.Y., and Chuang, B.R. (2001), "Mixture Inventory Model Involving Variable Lead Time and Controllable Backorder Rate," Computers and Industrial Engineering, 40, 339-348.
    • (2001) Computers and Industrial Engineering , vol.40 , pp. 339-348
    • Ouyang, L.Y.1    Chuang, B.R.2
  • 24
    • 9544226435 scopus 로고    scopus 로고
    • Integrated Inventory Models With Controllable Lead Time and Backorder Discount Considerations
    • Pan, J.C.-H., and Hsiao, Y.-C. (2005), "Integrated Inventory Models With Controllable Lead Time and Backorder Discount Considerations," International Journal of Production Economics, 93-94, 387-397.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 387-397
    • Pan, J.C.-H.1    Hsiao, Y.-C.2
  • 25
    • 0027904996 scopus 로고
    • Diversification Under Yield Randomness in Inventory Models
    • Parlar, M., and Wang, D. (1993), "Diversification Under Yield Randomness in Inventory Models," European Journal of Operational Research, 66, 52-64.
    • (1993) European Journal of Operational Research , vol.66 , pp. 52-64
    • Parlar, M.1    Wang, D.2
  • 26
    • 0000752798 scopus 로고
    • Investing in Reduced Setups in the EOQ Model
    • Porteus, E.L. (1985), "Investing in Reduced Setups in the EOQ Model," Management Science, 31, 998-1010.
    • (1985) Management Science , vol.31 , pp. 998-1010
    • Porteus, E.L.1
  • 27
    • 0022613610 scopus 로고
    • Optimal Lot Sizing Process Quality Improvement and Setup Cost Reduction
    • Porteus, EL. (1986), "Optimal Lot Sizing Process Quality Improvement and Setup Cost Reduction," Operations Research, 34, 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 28
    • 19744377965 scopus 로고    scopus 로고
    • Joint Pricing and Inventory Policies for Make-to-stock Products with Deterministic Price-sensitive Demand
    • Ray, S., Gerchak, Y., and Jewkes, E.M. (2005), "Joint Pricing and Inventory Policies for Make-to-stock Products with Deterministic Price-sensitive Demand," International Journal of Production Economics, 97, 143-158.
    • (2005) International Journal of Production Economics , vol.97 , pp. 143-158
    • Ray, S.1    Gerchak, Y.2    Jewkes, E.M.3
  • 29
    • 9544255701 scopus 로고    scopus 로고
    • A Continuous Production - Inventory Problem with Regeneration Cycles
    • Rempala, R. (2005), "A Continuous Production - Inventory Problem with Regeneration Cycles," International Journal of Production Economics, 93-94, 447-454.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 447-454
    • Rempala, R.1
  • 30
    • 0031145351 scopus 로고    scopus 로고
    • Manufacturing Setup Cost Reduction Under Variable Lead Time and Finite Opportunities for Investment
    • Sarkar, B.R., and Coates, E.R. (1997), "Manufacturing Setup Cost Reduction Under Variable Lead Time and Finite Opportunities for Investment," International Journal of production Economics, 49, 237-247.
    • (1997) International Journal of production Economics , vol.49 , pp. 237-247
    • Sarkar, B.R.1    Coates, E.R.2
  • 31
    • 9544221665 scopus 로고    scopus 로고
    • Optimal Inventory Policies When Sales Are Discretionary
    • Scarf, E.H. (2005), "Optimal Inventory Policies When Sales Are Discretionary," International Journal of Production Economics, 93-94, 111-119.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 111-119
    • Scarf, E.H.1
  • 32
    • 0016924731 scopus 로고
    • Establishing the Reorder Quantity When the Amount Received Is Uncertain
    • Silver, EA. (1976), "Establishing the Reorder Quantity When the Amount Received Is Uncertain," INFOR, 14, 32-39.
    • (1976) INFOR , vol.14 , pp. 32-39
    • Silver, E.A.1
  • 33
    • 12144278689 scopus 로고
    • Yield Variability in Manufacturing Rework and Scrap Policies
    • Ph.D. Thesis, Graduate School of Business, Stanford University Stanford, CA
    • Spence, A.M. (1988) "Yield Variability in Manufacturing Rework and Scrap Policies", Ph.D. Thesis, Graduate School of Business, Stanford University Stanford, CA.
    • (1988)
    • Spence, A.M.1
  • 34
    • 9544249379 scopus 로고    scopus 로고
    • Considering Stochastic Lead Times in a Manufacturing/ Remanufacturing System with Deterministic Demands and Returns
    • Tang, O., and Grubbstrom, W.R. (2005), "Considering Stochastic Lead Times in a Manufacturing/ Remanufacturing System with Deterministic Demands and Returns," International Journal of Production Economics., 93-94, 285-30.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 285-330
    • Tang, O.1    Grubbstrom, W.R.2
  • 35
    • 0000455414 scopus 로고    scopus 로고
    • Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
    • Wang, Y., and Gerchak, Y. (1996), "Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand," Management Science, 42, 130-137.
    • (1996) Management Science , vol.42 , pp. 130-137
    • Wang, Y.1    Gerchak, Y.2
  • 36
    • 0001198301 scopus 로고
    • Lot Sizing with Random Yields, a Review
    • Yano, C.A., and Lee, H.L. (1995), "Lot Sizing with Random Yields, a Review," Operations Research, 43, 311-334.
    • (1995) Operations Research , vol.43 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 37
    • 14944362698 scopus 로고    scopus 로고
    • A Heuristic Approach for Multiple Items and Location Ordering Problem with Quantity Discount and Capacity Constraint
    • You, P.-S. (2005), "A Heuristic Approach for Multiple Items and Location Ordering Problem with Quantity Discount and Capacity Constraint," Journal of the Operational Research Society, 54, 307-316.
    • (2005) Journal of the Operational Research Society , vol.54 , pp. 307-316
    • You, P.-S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.