-
1
-
-
0025136346
-
Optimizing spillway capacity with uncertainty in flood estimator
-
Afshar A, Marino MA (1990) Optimizing spillway capacity with uncertainty in flood estimator. J Water Res Plan Manage ASCE 116(1):74-81
-
(1990)
J Water Res Plan Manage ASCE
, vol.116
, Issue.1
, pp. 74-81
-
-
Afshar, A.1
Marino, M.A.2
-
3
-
-
34547114053
-
Use of monte carlo techniques in the design and operation of a multipurpose reservoir system
-
Askew AJ, Yeh WGY, Hall WA (1971) Use of monte carlo techniques in the design and operation of a multipurpose reservoir system. Water Resour Res 7(4):819-826
-
(1971)
Water Resour Res
, vol.7
, Issue.4
, pp. 819-826
-
-
Askew, A.J.1
Yeh, W.G.Y.2
Hall, W.A.3
-
5
-
-
85040498346
-
-
Civil Engineering Studies, Hydraulic Engineering Series No. 37, University of Illinois at Urbana-Champaign, Urbana, IL
-
Cheng ST, Yen BC, Tang WH (1982) Overtopping risk for an existing dam. Civil Engineering Studies, Hydraulic Engineering Series No. 37, University of Illinois at Urbana-Champaign, Urbana, IL
-
(1982)
Overtopping Risk for an Existing Dam
-
-
Cheng, S.T.1
Yen, B.C.2
Tang, W.H.3
-
6
-
-
5844413459
-
Risk analysis of dam failure and extreme floods: Application of the partitioned multiobjective risk method
-
Environmental Systems Management Inc., Charlottesville, VA
-
Haimes YY, Petrakian R, Karlsson PO, Mitsiopoulos J (1988) Risk analysis of dam failure and extreme floods: Application of the partitioned multiobjective risk method. IWR Report 88-R-1, Environmental Systems Management Inc., Charlottesville, VA
-
(1988)
IWR Report 88-R-1
-
-
Haimes, Y.Y.1
Petrakian, R.2
Karlsson, P.O.3
Mitsiopoulos, J.4
-
7
-
-
0024656259
-
Probabilistic estimates for multivariate analyses
-
Harr ME (1989) Probabilistic estimates for multivariate analyses. Appl Math Model 13:313-318
-
(1989)
Appl Math Model
, vol.13
, pp. 313-318
-
-
Harr, M.E.1
-
8
-
-
39349091528
-
Risk and uncertainty analyses of dam overtopping: Feitsui Reservoir as a case study
-
In: Brisbane, Australia, paper on CD-ROM, Abstract
-
Hsu YC, Kuo JT (2004) Risk and uncertainty analyses of dam overtopping: Feitsui Reservoir as a case study. In: Proceedings of the 6th intl conf on hydrosci and engr (ICHE-2004), Brisbane, Australia, paper on CD-ROM, Abstract, 459-460
-
(2004)
Proceedings of the 6th Intl Conf on Hydrosci and Engr (ICHE-2004)
, pp. 459-460
-
-
Hsu, Y.C.1
Kuo, J.T.2
-
9
-
-
3843091114
-
-
International Commission on Large Dams (ICOLD) reduced edition, Paris
-
International Commission on Large Dams (ICOLD) (1973) Lessons from dam incidents, reduced edition, Paris
-
(1973)
Lessons from Dam Incidents
-
-
-
10
-
-
0023822744
-
Risk-based analysis of extreme events
-
Karlsson PO, Haimes YY (1988a) Risk-based analysis of extreme events. Water Resour Res 24(1):9-20
-
(1988)
Water Resour Res
, vol.24
, Issue.1
, pp. 9-20
-
-
Karlsson, P.O.1
Haimes, Y.Y.2
-
11
-
-
0023822746
-
Probability distributions and their partitioning
-
Karlsson PO, Haimes YY (1988b) Probability distributions and their partitioning. Water Resour Res 24(1):21-29
-
(1988)
Water Resour Res
, vol.24
, Issue.1
, pp. 21-29
-
-
Karlsson, P.O.1
Haimes, Y.Y.2
-
13
-
-
39349097376
-
-
Department of Civil Engineering, National Taiwan University, Report submitted to Water Resources Agency, MOEA, Taiwan (in Chinese)
-
Kuo JT, Yeh KC, Chen JH (2004) The establishment of optimal inspection interval scheduling. Department of Civil Engineering, National Taiwan University, Report submitted to Water Resources Agency, MOEA, Taiwan (in Chinese)
-
(2004)
The Establishment of Optimal Inspection Interval Scheduling
-
-
Kuo, J.T.1
Yeh, K.C.2
Chen, J.H.3
-
14
-
-
33646246393
-
Improvement of overtopping risk evaluations using probabilistic concepts for existing dams
-
Kwon HH, Moon YI (2006) Improvement of overtopping risk evaluations using probabilistic concepts for existing dams. Stoch Environ Res Risk Assess 20(4):223-237
-
(2006)
Stoch Environ Res Risk Assess
, vol.20
, Issue.4
, pp. 223-237
-
-
Kwon, H.H.1
Moon, Y.I.2
-
15
-
-
0020545764
-
The influence of dam failure probabilities on spillway analysis
-
In: Cambridge, MA, 9-12 August 1983
-
Langseth DE, Perkins FE (1983) The influence of dam failure probabilities on spillway analysis. In: Proceedings of the conf on frontiers in hydr engr, ASCE, hydr div, Cambridge, MA, 9-12 August 1983, pp 459-464
-
(1983)
Proceedings of the Conf on Frontiers in Hydr Engr, ASCE, Hydr Div
, pp. 459-464
-
-
Langseth, D.E.1
Perkins, F.E.2
-
16
-
-
0004918301
-
Overtopping probability of dams under flood load
-
In: Kuo JT, Lin GF (eds) National Taiwan University
-
Meon G (1992) Overtopping probability of dams under flood load. In: Kuo JT, Lin GF (eds) Stochastic Hydraulic '92. In: Proceedings of 6th international sym, National Taiwan University, pp 99-106
-
(1992)
Stochastic Hydraulic '92. In: Proceedings of 6th International Sym
, pp. 99-106
-
-
Meon, G.1
-
19
-
-
0023523118
-
Optimizing spillway capacity with an estimated distribution of floods
-
Resendiz-Carrillo D, Lave LB (1987) Optimizing spillway capacity with an estimated distribution of floods. Water Resour Res 23(11):2043-2049
-
(1987)
Water Resour Res
, vol.23
, Issue.11
, pp. 2043-2049
-
-
Resendiz-Carrillo, D.1
Lave, L.B.2
-
20
-
-
0026115029
-
Dam safety inspection scheduling
-
Tang WH, Yen BC (1991) Dam safety inspection scheduling. J Hydrol Eng ASCE 117(2):214-229
-
(1991)
J Hydrol Eng ASCE
, vol.117
, Issue.2
, pp. 214-229
-
-
Tang, W.H.1
Yen, B.C.2
-
21
-
-
0019389255
-
Risk models for flood levee design
-
Tung YK, Mays LW (1981) Risk models for flood levee design. Water Resour Res 17(4):833-841
-
(1981)
Water Resour Res
, vol.17
, Issue.4
, pp. 833-841
-
-
Tung, Y.K.1
Mays, L.W.2
-
23
-
-
0027544766
-
Uncertainty and sensitivity analyses of pit-migration model
-
Yeh KC, Tung YK (1993) Uncertainty and sensitivity analyses of pit-migration model. J Hydrol Eng ASCE 119(2):262-283
-
(1993)
J Hydrol Eng ASCE
, vol.119
, Issue.2
, pp. 262-283
-
-
Yeh, K.C.1
Tung, Y.K.2
|