-
1
-
-
0343897884
-
A caveat on the measurement of productive efficiency
-
Agrell, P.J. and West, B.M., 2001. A caveat on the measurement of productive efficiency. International Journal of Production Economics, 69 (1), 1-14.
-
(2001)
International Journal of Production Economics
, vol.69
, Issue.1
, pp. 1-14
-
-
Agrell, P.J.1
West, B.M.2
-
2
-
-
0040560759
-
Effective measurement and successful elements of company productivity: The basis of competitiveness and world prosperity
-
Bernolak, I., 1997. Effective measurement and successful elements of company productivity: the basis of competitiveness and world prosperity. International Journal of Production Economics, 52, 203-213.
-
(1997)
International Journal of Production Economics
, vol.52
, pp. 203-213
-
-
Bernolak, I.1
-
3
-
-
3543124850
-
Dynamics of performance measurement systems
-
Bititci, U.S., Turner, T., and Begemann, C., 2000. Dynamics of performance measurement systems. International Journal of Operations and Production Management, 20 (6), 692-704.
-
(2000)
International Journal of Operations and Production Management
, vol.20
, Issue.6
, pp. 692-704
-
-
Bititci, U.S.1
Turner, T.2
Begemann, C.3
-
4
-
-
0034378896
-
Designing, implementing and updating performance measurement systems
-
Bourne, M., el al., 2000. Designing, implementing and updating performance measurement systems. International Journal of Operations and Production Management, 20 (7), 754-771.
-
(2000)
International Journal of Operations and Production Management
, vol.20
, Issue.7
, pp. 754-771
-
-
Bourne, M.1
el al2
-
5
-
-
0036640379
-
Production capacity of flexible manufacturing systems with fixed production ratios
-
Buitenhek, R., Baynat, B., and Dallery, Y., 2002. Production capacity of flexible manufacturing systems with fixed production ratios. International Journal of Flexible Manufacturing Systems, 14 (3), 203-225.
-
(2002)
International Journal of Flexible Manufacturing Systems
, vol.14
, Issue.3
, pp. 203-225
-
-
Buitenhek, R.1
Baynat, B.2
Dallery, Y.3
-
6
-
-
61449107679
-
-
Cigolini, R. and Grando, A., 2004. Managing production capacity to improve productivity: the multiple machine case. In: M. Tausch, et al., ed. Proceedings of the IMS International Forum, 2, 17-19 May, Cernobbio, Italy. Milan: Grafica Sovico, 850-857.
-
Cigolini, R. and Grando, A., 2004. Managing production capacity to improve productivity: the multiple machine case. In: M. Tausch, et al., ed. Proceedings of the IMS International Forum, Vol. 2, 17-19 May, Cernobbio, Italy. Milan: Grafica Sovico, 850-857.
-
-
-
-
7
-
-
0347647939
-
A new dynamic look-ahead scheduling procedure for batching machines
-
Cigolini, R., et al., 2002. A new dynamic look-ahead scheduling procedure for batching machines. Journal of Scheduling, 5 (2), 185-204.
-
(2002)
Journal of Scheduling
, vol.5
, Issue.2
, pp. 185-204
-
-
Cigolini, R.1
-
8
-
-
3543111420
-
Overall equipment effectiveness as a measure of operational improvement. A practical analysis
-
Dal, B., Tugwell, P., and Grealbanks, R., 2000. Overall equipment effectiveness as a measure of operational improvement. A practical analysis. International Journal of Operations and Production Management, 20 (12), 1488-1502.
-
(2000)
International Journal of Operations and Production Management
, vol.20
, Issue.12
, pp. 1488-1502
-
-
Dal, B.1
Tugwell, P.2
Grealbanks, R.3
-
10
-
-
2442651807
-
Productivity of synchronized serial production lines with flexible reserve capacity
-
Freiheit, T., et al., 2004. Productivity of synchronized serial production lines with flexible reserve capacity. International Journal of Production Research, 42 (10), 2009-2027.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.10
, pp. 2009-2027
-
-
Freiheit, T.1
-
11
-
-
40849109892
-
Modelling plant capacity and productivity: The multi-machine case
-
Grando, A. and Cigolini, R., 2007. Modelling plant capacity and productivity: the multi-machine case. Problems and Perspectives in Management, 5 (3), 206-228.
-
(2007)
Problems and Perspectives in Management
, vol.5
, Issue.3
, pp. 206-228
-
-
Grando, A.1
Cigolini, R.2
-
12
-
-
32144454217
-
Modelling plant capacity and productivity: Conceptual framework in a singlemachine case
-
Grando, A. and Turco, F., 2005. Modelling plant capacity and productivity: conceptual framework in a singlemachine case. Production Planning & Control, 16 (3), 309-322.
-
(2005)
Production Planning & Control
, vol.16
, Issue.3
, pp. 309-322
-
-
Grando, A.1
Turco, F.2
-
13
-
-
0036642752
-
Total productivity measurement based on partial productivity ratios
-
Hannula, M., 2002. Total productivity measurement based on partial productivity ratios. International Journal of Production Economics, 78 (1), 57-67.
-
(2002)
International Journal of Production Economics
, vol.78
, Issue.1
, pp. 57-67
-
-
Hannula, M.1
-
14
-
-
0032658359
-
Impacts of buyers' order batching on the supplier's demand correlation and capacity utilisation in a branching supply chain
-
Jung, H.-D., et al., 1999. Impacts of buyers' order batching on the supplier's demand correlation and capacity utilisation in a branching supply chain. Production Planning & Control, 10 (5), 472-485.
-
(1999)
Production Planning & Control
, vol.10
, Issue.5
, pp. 472-485
-
-
Jung, H.-D.1
-
16
-
-
0142154997
-
Multi-objective capacity planning for agile semiconductor manufacturing
-
Iwata, Y., Taji, K., and Tamura, H., 2003. Multi-objective capacity planning for agile semiconductor manufacturing. Production Planning & Control, 14 (3), 244-254.
-
(2003)
Production Planning & Control
, vol.14
, Issue.3
, pp. 244-254
-
-
Iwata, Y.1
Taji, K.2
Tamura, H.3
-
17
-
-
0036455946
-
A framework of the factors affecting the evolution of performance measurement systems
-
Kennerley, M. and Neely, A., 2002. A framework of the factors affecting the evolution of performance measurement systems. International Journal of Operations and Production Management, 22 (11), 1222-1245.
-
(2002)
International Journal of Operations and Production Management
, vol.22
, Issue.11
, pp. 1222-1245
-
-
Kennerley, M.1
Neely, A.2
-
18
-
-
0035640727
-
Operational efficiency and effectiveness measurement
-
Jeong, K.Y. and Phillips, D.T., 2001. Operational efficiency and effectiveness measurement. International Journal of Operations and Production Management, 21 (11), 1404-1416.
-
(2001)
International Journal of Operations and Production Management
, vol.21
, Issue.11
, pp. 1404-1416
-
-
Jeong, K.Y.1
Phillips, D.T.2
-
19
-
-
3242658222
-
-
Knox Lovell, C.A., 2003. The decomposition of Malmquist productivity indices: special issue on efficiency analysis: proceedings of a research workshop on the state-of-the-art and future research in efficiency analysis. Journal of Productivity Analysis, 20 (3), 437-458.
-
Knox Lovell, C.A., 2003. The decomposition of Malmquist productivity indices: special issue on efficiency analysis: proceedings of a research workshop on the state-of-the-art and future research in efficiency analysis. Journal of Productivity Analysis, 20 (3), 437-458.
-
-
-
-
20
-
-
0036819808
-
Production capacity modelling of alternative, non-identical, flexible machines
-
Liberopoulos, G., 2002. Production capacity modelling of alternative, non-identical, flexible machines. International Journal of Flexible Manufacturing Systems, 14 (4), 345-359.
-
(2002)
International Journal of Flexible Manufacturing Systems
, vol.14
, Issue.4
, pp. 345-359
-
-
Liberopoulos, G.1
-
21
-
-
0036201512
-
Managing multiple dimensions of manufacturing performance - an exploratory study
-
Lillis, A., 2002. Managing multiple dimensions of manufacturing performance - an exploratory study. Accounting, Organizations and Society, 27, 497-529.
-
(2002)
Accounting, Organizations and Society
, vol.27
, pp. 497-529
-
-
Lillis, A.1
-
22
-
-
0344740596
-
A cost Malmquist productivity index
-
Maniadakis, N. and Thanassoulis, E., 2004. A cost Malmquist productivity index. European Journal of Operational Research, 154 (2), 396-409.
-
(2004)
European Journal of Operational Research
, vol.154
, Issue.2
, pp. 396-409
-
-
Maniadakis, N.1
Thanassoulis, E.2
-
26
-
-
0031103206
-
The impact of JIT on capacity management: A case study and analysis
-
Spencer, M.S., 1997. The impact of JIT on capacity management: a case study and analysis. Production Planning & Control, 8 (2), 183-193.
-
(1997)
Production Planning & Control
, vol.8
, Issue.2
, pp. 183-193
-
-
Spencer, M.S.1
-
27
-
-
0031190793
-
Resource-constrained materials requirements planning - MRP
-
Tempelmeier, H., 1997. Resource-constrained materials requirements planning - MRP. Production Planning & Control, 8 (5), 451-461.
-
(1997)
Production Planning & Control
, vol.8
, Issue.5
, pp. 451-461
-
-
Tempelmeier, H.1
|