-
3
-
-
8644233707
-
An analysis and simulation of an operator's behaviour in controlling continuous baking ovens
-
Taylor and Francis London
-
Beishon RJ (1974) An analysis and simulation of an operator's behaviour in controlling continuous baking ovens. In: Edwards E, Lees FP (eds) The human operator in process control. Taylor and Francis, London
-
(1974)
The Human Operator in Process Control
-
-
Beishon, R.J.1
Edwards, E.2
Lees, F.P.3
-
4
-
-
0001457731
-
The effects of decision support and task contingencies on model formulation: A cognitive perspective
-
Benbasat I, Todd P (1996) The effects of decision support and task contingencies on model formulation: a cognitive perspective, Decision support systems, vol 17, pp 241-252
-
(1996)
Decision Support Systems
, vol.17
, pp. 241-252
-
-
Benbasat, I.1
Todd, P.2
-
5
-
-
0028467474
-
An interactive procedure for bi-criteria production scheduling
-
6
-
JJ Bernardo KS Lin 1994 An interactive procedure for bi-criteria production scheduling Comput Oper Res 21 6 677 688
-
(1994)
Comput Oper Res
, vol.21
, pp. 677-688
-
-
Bernardo, J.J.1
Lin, K.S.2
-
6
-
-
0028413139
-
Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems
-
2
-
S Bi G Salvendy 1994 Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems Int J Hum Factors Manuf 4 2 205 234
-
(1994)
Int J Hum Factors Manuf
, vol.4
, pp. 205-234
-
-
Bi, S.1
Salvendy, G.2
-
8
-
-
0024962824
-
Production scheduling: Practice and theory
-
G Buxey 1989 Production scheduling: practice and theory Eur J Oper Res 39 17 31
-
(1989)
Eur J Oper Res
, vol.39
, pp. 17-31
-
-
Buxey, G.1
-
9
-
-
0037355373
-
Scheduling and platforming trains at busy complex stations
-
M Carey S Carville 2003 Scheduling and platforming trains at busy complex stations Transp Res Part A 37 195 224
-
(2003)
Transp Res Part A
, vol.37
, pp. 195-224
-
-
Carey, M.1
Carville, S.2
-
10
-
-
0022226575
-
Heuristic classification
-
WJ Clancey 1985 Heuristic classification Artif Intell 27 289 350
-
(1985)
Artif Intell
, vol.27
, pp. 289-350
-
-
Clancey, W.J.1
-
11
-
-
11244283715
-
Making sense of scheduling: The realities of scheduling practice in an engineering firm
-
Taylor and Francis London
-
Crawford S (2001) Making sense of scheduling: the realities of scheduling practice in an engineering firm. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London
-
(2001)
Human Performance in Planning and Scheduling
-
-
Crawford, S.1
Wilson, J.2
-
12
-
-
0012732969
-
From anecdotes to theory: A review of existing knowledge on human factors of planning and scheduling
-
Taylor and Francis London
-
Crawford S, Wiers VCS (2001) From anecdotes to theory: a review of existing knowledge on human factors of planning and scheduling. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London
-
(2001)
Human Performance in Planning and Scheduling
-
-
Crawford, S.1
Wiers, V.C.S.2
Wilson, J.3
-
13
-
-
0003470094
-
Investigating the work of industrial schedulers through field study
-
S Crawford BL MacCarthy JR Wilson C Vernon 1999 Investigating the work of industrial schedulers through field study Cognition Technol Work 1 63 77
-
(1999)
Cognition Technol Work
, vol.1
, pp. 63-77
-
-
Crawford, S.1
Wilson, J.R.2
Vernon, C.3
-
15
-
-
0000450174
-
From complex organizations with simple jobs to simple organizations with complex jobs
-
De Sitter U, Den Hertog JF, Dankbaar B (1997) From complex organizations with simple jobs to simple organizations with complex jobs. Human Relations 50(5)
-
(1997)
Human Relations
, vol.50
, Issue.5
-
-
De Sitter, U.1
Den Hertog, J.F.2
Dankbaar, B.3
-
16
-
-
0031153682
-
Interactive scheduling in the chemical process industry
-
9
-
K Dockx Y De Boeck K Meert 1997 Interactive scheduling in the chemical process industry Comput Chem Eng 21 9 925 946
-
(1997)
Comput Chem Eng
, vol.21
, pp. 925-946
-
-
Dockx, K.1
De Boeck, Y.2
Meert, K.3
-
17
-
-
0003344096
-
Production scheduling: A behavior model
-
1
-
JM Dutton 1964 Production scheduling: a behavior model Int J Prod Res 3 1 3 27
-
(1964)
Int J Prod Res
, vol.3
, pp. 3-27
-
-
Dutton, J.M.1
-
18
-
-
61349100947
-
An empirical study of scheduling decision behavior
-
6
-
PD Fox CH Kriebel 1967 An empirical study of scheduling decision behavior Int J Ind Eng 18 6 354 360
-
(1967)
Int J Ind Eng
, vol.18
, pp. 354-360
-
-
Fox, P.D.1
Kriebel, C.H.2
-
20
-
-
0037118560
-
Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite
-
3
-
V Gabrel D Vanderpooten 2002 Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite Eur J Oper Res 139 3 533 542
-
(2002)
Eur J Oper Res
, vol.139
, pp. 533-542
-
-
Gabrel, V.1
Vanderpooten, D.2
-
24
-
-
4243550864
-
Heuristic scheduling in a woolen mill
-
4
-
EG Hurst AB McNamara 1967 Heuristic scheduling in a woolen mill Manage Sci 14 4 182 203
-
(1967)
Manage Sci
, vol.14
, pp. 182-203
-
-
Hurst, E.G.1
-
25
-
-
61349176684
-
Planning, anticipatory systems, and kinds of actors
-
Dubois DM (eds) Melville (NY): American institute of physics conference proceedings
-
Jorna RJ, Van Wezel W (2002) Planning, anticipatory systems, and kinds of actors. In: Dubois DM (eds) Computing anticipatory systems, casys 2001. Melville (NY): American institute of physics conference proceedings, vol 627, pp 411-423
-
(2002)
Computing Anticipatory Systems, Casys 2001
, vol.627
, pp. 411-423
-
-
Jorna, R.J.1
Van Wezel, W.2
-
26
-
-
61349137767
-
Plannen en Roosteren: Taakgericht analyseren, ontwerpen en ondersteunen
-
Jorna RJ, Gazendam H, Heesen HC, Van Wezel W (1996) Plannen en Roosteren: Taakgericht analyseren, ontwerpen en ondersteunen. Leidschendam, Lansa. (Planning and Scheduling: task oriented analysis, design and support)
-
(1996)
Leidschendam, Lansa. (Planning and Scheduling: Task Oriented Analysis, Design and Support)
-
-
Jorna, R.J.1
Gazendam, H.2
Heesen, H.C.3
Van Wezel, W.4
-
27
-
-
27144464836
-
Planners and their cognitive maps: An analysis of domain representations using multi dimensional scaling
-
DJ Kiewiet RJ Jorna W Van Wezel 2005 Planners and their cognitive maps: an analysis of domain representations using multi dimensional scaling Appl Ergon 36 695 708
-
(2005)
Appl Ergon
, vol.36
, pp. 695-708
-
-
Kiewiet, D.J.1
Jorna, R.J.2
Van Wezel, W.3
-
28
-
-
0028414104
-
The training of knowledge structures for manufacturing tasks: An empirical study
-
4
-
RJ Koubek TP Clarkston 1994 The training of knowledge structures for manufacturing tasks: an empirical study Ergonomics 37 4 765 780
-
(1994)
Ergonomics
, vol.37
, pp. 765-780
-
-
Koubek, R.J.1
Clarkston, T.P.2
-
29
-
-
0010167431
-
An interactive, optimization-based decision support system for scheduling part-time, computer lab attendants
-
6
-
J Lauer LW Jacobs MJ Brusco SE Bechtold 1994 An interactive, optimization-based decision support system for scheduling part-time, computer lab attendants Omega Int J Manage Sci 22 6 613 626
-
(1994)
Omega Int J Manage Sci
, vol.22
, pp. 613-626
-
-
Lauer, J.1
Jacobs, L.W.2
Brusco, M.J.3
Bechtold, S.E.4
-
30
-
-
0003413481
-
The human contribution to planning, scheduling and control in manufacturing Industry-background and context
-
MacCarthy B, Wilson J (eds) Taylor and Francis, London
-
MacCarthy B, Wilson J (2001) The human contribution to planning, scheduling and control in manufacturing Industry-background and context. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London
-
(2001)
Human Performance in Planning and Scheduling
-
-
MacCarthy, B.1
Wilson, J.2
-
31
-
-
0002748923
-
Job-shop scheduling theory: What is relevant?
-
4
-
KN McKay FR Safayeni JA Buzacott 1988 Job-shop scheduling theory: what is relevant? Interfaces 8 4 84 90
-
(1988)
Interfaces
, vol.8
, pp. 84-90
-
-
Safayeni, F.R.1
Buzacott, J.A.2
-
32
-
-
0029323355
-
'Common sense' realities of planning and scheduling in printed circuit board production
-
6
-
KN McKay FR Safayeni JA Buzacott 1995 'Common sense' realities of planning and scheduling in printed circuit board production Int J Prod Res 33 6 1587 1603
-
(1995)
Int J Prod Res
, vol.33
, pp. 1587-1603
-
-
Safayeni, F.R.1
Buzacott, J.A.2
-
33
-
-
0033746932
-
The application of computerized production control systems in job shop environments
-
KN McKay JA Buzacott 2000 The application of computerized production control systems in job shop environments Comput Ind 42 9 97
-
(2000)
Comput Ind
, vol.42
, pp. 9-97
-
-
Buzacott, J.A.1
-
34
-
-
34548476395
-
Planning, scheduling and dispatching tasks in production control
-
2
-
KN McKay VCS Wiers 2003 Planning, scheduling and dispatching tasks in production control Cognition Technol Work 5 2 82 93
-
(2003)
Cognition Technol Work
, vol.5
, pp. 82-93
-
-
Wiers, V.C.S.1
-
38
-
-
33745186372
-
PASSAT: A user-centric planning framework
-
Myers KL, Tyson WM, Wolverton MJ, Jarvis PA, Lee TJ, desJardins M (2002) PASSAT: a user-centric planning framework. In: Proceedings of the 3rd international NASA workshop on planning and scheduling for space
-
(2002)
Proceedings of the 3rd International NASA Workshop on Planning and Scheduling for Space
-
-
Myers, K.L.1
Tyson, W.M.2
Wolverton, M.J.3
Jarvis, P.A.4
Lee, T.J.5
Desjardins, M.6
-
39
-
-
0023995707
-
An experimental study of human decision-making in computer-based scheduling of flexible manufacturing system
-
4
-
N Nakamura G Salvendy 1988 An experimental study of human decision-making in computer-based scheduling of flexible manufacturing system Int J Prod Res 26 4 567 583
-
(1988)
Int J Prod Res
, vol.26
, pp. 567-583
-
-
Nakamura, N.1
Salvendy, G.2
-
40
-
-
0002124297
-
The knowledge level
-
2
-
A Newell 1981 The knowledge level AI Magazine 2 2 1 20
-
(1981)
AI Magazine
, vol.2
, pp. 1-20
-
-
Newell, A.1
-
42
-
-
34249316029
-
Elements of a theory of human problem solving
-
A Newell JC Shaw HA Simon 1958 Elements of a theory of human problem solving Psychol Rev 65 151 166
-
(1958)
Psychol Rev
, vol.65
, pp. 151-166
-
-
Newell, A.1
Shaw, J.C.2
Simon, H.A.3
-
43
-
-
5644266357
-
A comparison of expert system and human operator performance for cement kiln operation
-
11
-
P Norman S Naveed 1990 A comparison of expert system and human operator performance for cement kiln operation J Oper Res Soc 41 11 1007 1019
-
(1990)
J Oper Res Soc
, vol.41
, pp. 1007-1019
-
-
Norman, P.1
Naveed, S.2
-
44
-
-
0034308309
-
Toward interactive scheduling systems for managing medical resources
-
2
-
A Oddi A Cesta 2000 Toward interactive scheduling systems for managing medical resources Artif Intell Med 20 2 113 138
-
(2000)
Artif Intell Med
, vol.20
, pp. 113-138
-
-
Oddi, A.1
Cesta, A.2
-
45
-
-
0004772702
-
MacMerl: Mixed-Initiative scheduling with coincident problem spaces
-
Zweben M, Fox MS (eds) Morgan Kaufman, San Francisco
-
Prietula MJ, Hsu W, Ow PS (1994) MacMerl: mixed-Initiative scheduling with coincident problem spaces. In: Zweben M, Fox MS (eds) Intelligent scheduling. Morgan Kaufman, San Francisco
-
(1994)
Intelligent Scheduling
-
-
Prietula, M.J.1
Hsu, W.2
Ow, P.S.3
-
47
-
-
84874411581
-
Planner-oriented design of algorithms for train shunting scheduling
-
Van Wezel W, Jorna RJ, Meystel A (eds) Wiley, New York
-
Reizebos J, Van Wezel W (2006) Planner-oriented design of algorithms for train shunting scheduling. In: Van Wezel W, Jorna RJ, Meystel A (eds) Planning in intelligent systems, Wiley, New York
-
(2006)
Planning in Intelligent Systems
-
-
Reizebos, J.1
Van Wezel, W.2
-
48
-
-
0024956638
-
The human planning and scheduling role in advanced manufacturing systems: An emerging human factors domain
-
6
-
PM Sanderson 1989 The human planning and scheduling role in advanced manufacturing systems: an emerging human factors domain Hum Factors 31 6 635 666
-
(1989)
Hum Factors
, vol.31
, pp. 635-666
-
-
Sanderson, P.M.1
-
50
-
-
0004016734
-
-
Schraagen JM, Chipman SF, Shalin VL (eds) Lawrence Erlbaum Associates, Mahwah
-
Schraagen JM, Chipman SF, Shalin VL (eds) (2000) Cognitive task analysis. Lawrence Erlbaum Associates, Mahwah
-
(2000)
Cognitive Task Analysis
-
-
-
51
-
-
0003540407
-
-
MIT, Cambridge
-
Schreiber G, Akkermans H, Anjewierden A, De Hoog R, Shadbolt N, Van de Velde W, Wielinga B (2000) Knowledge engineering and management: the common-KADS methodology. MIT, Cambridge
-
(2000)
Knowledge Engineering and Management: The Common-KADS Methodology
-
-
Schreiber, G.1
Akkermans, H.2
Anjewierden, A.3
De Hoog, R.4
Shadbolt, N.5
Van De Velde, W.6
Wielinga, B.7
-
52
-
-
0016975520
-
Iterative methods for determining the k shortest paths in a network
-
DR Shier 1976 Iterative methods for determining the k shortest paths in a network Networks 6 205 230
-
(1976)
Networks
, vol.6
, pp. 205-230
-
-
Shier, D.R.1
-
54
-
-
0026936702
-
Knowledge-based production management: Approaches, results and prospects
-
4
-
SF Smith 1992 Knowledge-based production management: approaches, results and prospects Prod Plann Control 3 4 350 380
-
(1992)
Prod Plann Control
, vol.3
, pp. 350-380
-
-
Smith, S.F.1
-
55
-
-
0030121707
-
A framework for an interactive project scheduling system under limited resources
-
2
-
G Ulusoy L Özdamar 1996 A framework for an interactive project scheduling system under limited resources Eur J Oper Res 90 2 362 375
-
(1996)
Eur J Oper Res
, vol.90
, pp. 362-375
-
-
Ulusoy, G.1
Özdamar, L.2
-
56
-
-
61349192400
-
Tasks, hierarchies, and flexibility
-
Labyrint Publication, Capelle a/d IJssel
-
Van Wezel W (2001) Tasks, hierarchies, and flexibility. Planning in food processing industries. Labyrint Publication, Capelle a/d IJssel
-
(2001)
Planning in Food Processing Industries
-
-
Van Wezel, W.1
-
58
-
-
0032641328
-
The SEC-system: Reuse support for scheduling system development
-
1
-
W Van Wezel RJ Jorna 1999 The SEC-system: reuse support for scheduling system development Decis Support Syst 26 1 67 87
-
(1999)
Decis Support Syst
, vol.26
, pp. 67-87
-
-
Van Wezel, W.1
Jorna, R.J.2
-
60
-
-
84891025679
-
-
Van Wezel W, Jorna RJ, Meystel A (eds) Wiley, New York
-
Van Wezel W, Jorna RJ, Meystel A (eds) (2006) Planning in intelligent systems. Wiley, New York
-
(2006)
Planning in Intelligent Systems
-
-
-
64
-
-
3042618601
-
Planning and sScheduling in secondary work systems
-
MacCarthy B, Wilson J (eds) Taylor and Francis, London
-
Wäfler T (2001) Planning and sScheduling in secondary work systems. In: MacCarthy B, Wilson J (eds) Human performance in planning and scheduling. Taylor and Francis, London
-
(2001)
Human Performance in Planning and Scheduling
-
-
Wäfler, T.1
-
65
-
-
0034443665
-
Prospects for computer aided railway scheduling: Perspectives from users and parallels from mass transit
-
4
-
R Watson 2000 Prospects for computer aided railway scheduling: perspectives from users and parallels from mass transit Transp Plann Technol 23 4 303 321
-
(2000)
Transp Plann Technol
, vol.23
, pp. 303-321
-
-
Watson, R.1
-
66
-
-
0030191589
-
A quantitative field study of the decision behaviour of four shop floor schedulers
-
4
-
VCS Wiers 1996 A quantitative field study of the decision behaviour of four shop floor schedulers Prod Plann Control 7 4 383 392
-
(1996)
Prod Plann Control
, vol.7
, pp. 383-392
-
-
Wiers, V.C.S.1
|