A framework for an interactive project scheduling system under limited resources

Author keywords

Modeling framework; Project scheduling; Resource constraints

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; OPTIMIZATION; PERFORMANCE; RESOURCE ALLOCATION; SCHEDULING;

EID: 0030121707     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(95)00360-6     Document Type: Article
Times cited : (13)

References (34)
  • 1
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis
    • R. Slowinski and J. Weglarz, (eds.), Elsevier, Amsterdam
    • Alvarez-Valdes, R. and Tamarit, J.M. (1989), "Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis", in: R. Slowinski and J. Weglarz, (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 2
    • 0025385096 scopus 로고
    • Solving resource constrained project scheduling problems by A* search
    • Bell, C.E. and Park, K. (1990), "Solving resource constrained project scheduling problems by A* search", Naval Research Logistics 37, 61-84.
    • (1990) Naval Research Logistics , vol.37 , pp. 61-84
    • Bell, C.E.1    Park, K.2
  • 5
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource constrained project scheduling
    • Boctor, F.F. (1990), "Some efficient multi-heuristic procedures for resource constrained project scheduling", European Journal of Operational Research 49, 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 6
    • 0027694317 scopus 로고
    • Heuristics for scheduling projects with resource restrictions and several resource-duration modes
    • Boctor, F.F. (1993), "Heuristics for scheduling projects with resource restrictions and several resource-duration modes", International Journal of Production Research 31, 2547-2558.
    • (1993) International Journal of Production Research , vol.31 , pp. 2547-2558
    • Boctor, F.F.1
  • 8
    • 0016498438 scopus 로고
    • A comparison of heuristics and optimal solutions in resource constrained project scheduling
    • Davis, E.W., and Patterson, J.H. (1975), "A comparison of heuristics and optimal solutions in resource constrained project scheduling", Management Science 21, 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 9
    • 0025701918 scopus 로고
    • An evaluation of microcomputer-based sotware packages for project management
    • De Wit, J., and Herroelen, W. (1990), "An evaluation of microcomputer-based sotware packages for project management", European Journal of Operational Research 49, 102-139.
    • (1990) European Journal of Operational Research , vol.49 , pp. 102-139
    • De Wit, J.1    Herroelen, W.2
  • 10
    • 0017478425 scopus 로고
    • Scheduling a project to maximize its present value: A zero-one programming approach
    • Doersch, R.H., and Patterson, J.H. (1977), "Scheduling a project to maximize its present value: A zero-one programming approach", Management Science 23, 882-889.
    • (1977) Management Science , vol.23 , pp. 882-889
    • Doersch, R.H.1    Patterson, J.H.2
  • 11
    • 0025701916 scopus 로고
    • The scheduling of activities to maximize the net present value of projects
    • Elmaghraby, S.E., and Herroelen, W.S. (1990). "The scheduling of activities to maximize the net present value of projects", European Journal of Operational Research 49, 35-40.
    • (1990) European Journal of Operational Research , vol.49 , pp. 35-40
    • Elmaghraby, S.E.1    Herroelen, W.S.2
  • 16
    • 0009627197 scopus 로고
    • A local constraint based analysis approach to project scheduling under general resource constraints
    • Özdamar, L., and Ulusoy, G. (1994), "A local constraint based analysis approach to project scheduling under general resource constraints", European Journal of Operational Research 79, 287-298.
    • (1994) European Journal of Operational Research , vol.79 , pp. 287-298
    • Özdamar, L.1    Ulusoy, G.2
  • 17
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Özdamar, L., and Ulusoy, G. (1995), "A survey on the resource-constrained project scheduling problem", IIE Transactions 27, 574-586.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 19
    • 0027240748 scopus 로고
    • Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
    • Padman, R.,and Smith-Daniels, D.E. (1993), "Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach", European Journal of Operational Research 64, 295-311.
    • (1993) European Journal of Operational Research , vol.64 , pp. 295-311
    • Padman, R.1    Smith-Daniels, D.E.2
  • 20
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic performance
    • Patterson, J.H. (1976), "Project scheduling: The effects of problem structure on heuristic performance", Naval Research Logistics 23, 95-123.
    • (1976) Naval Research Logistics , vol.23 , pp. 95-123
    • Patterson, J.H.1
  • 21
    • 0025701909 scopus 로고
    • Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems
    • Patterson, J.H., Slowinski, R., Talbot, F.B., and Weglarz, J. (1991), "Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems", European Journal of Operational Research 49, 68-79.
    • (1991) European Journal of Operational Research , vol.49 , pp. 68-79
    • Patterson, J.H.1    Slowinski, R.2    Talbot, F.B.3    Weglarz, J.4
  • 22
    • 0014574409 scopus 로고
    • Multi-project scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.B., Watters, L.J., and Wolfe, P.M. (1969), "Multi-project scheduling with limited resources: A zero-one programming approach", Management Science 16, 93-108.
    • (1969) Management Science , vol.16 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 23
    • 0022794872 scopus 로고
    • A comparison of heuristics for scheduling projects with cash flows and resource restrictions
    • Russel, R.A. (1986), "A comparison of heuristics for scheduling projects with cash flows and resource restrictions", Management Science 32, 1291-1300.
    • (1986) Management Science , vol.32 , pp. 1291-1300
    • Russel, R.A.1
  • 24
    • 0023015634 scopus 로고
    • CALUSTO: An intelligent project management system
    • Sathi, A., Morton,E., Roth, S.F. (1986), "CALUSTO: An intelligent project management system", Al Magazine 7, 34-52.
    • (1986) Al Magazine , vol.7 , pp. 34-52
    • Sathi, A.1    Morton, E.2    Roth, S.F.3
  • 25
    • 84985756242 scopus 로고
    • Using a late start resource constrained project schedule to improve project net present value
    • Smith-Daniels, D.E., and Aquilano, N.J. (1987), "Using a late start resource constrained project schedule to improve project net present value", Decision Sciences 18, 617-630.
    • (1987) Decision Sciences , vol.18 , pp. 617-630
    • Smith-Daniels, D.E.1    Aquilano, N.J.2
  • 26
    • 38249035744 scopus 로고
    • Maximizing the net present value of a project subject to materials and capital constraints
    • Smith-Daniels, D.E., and Smith-Daniels, V.L. (1987), "Maximizing the net present value of a project subject to materials and capital constraints", Journal of Operations Management 7, 33-45.
    • (1987) Journal of Operations Management , vol.7 , pp. 33-45
    • Smith-Daniels, D.E.1    Smith-Daniels, V.L.2
  • 28
    • 0020193734 scopus 로고
    • Resource constrained project scheduling with time-resource trade-offs: The nonpreemptive case
    • Talbot, F.B. (1982), "Resource constrained project scheduling with time-resource trade-offs: The nonpreemptive case", Management Science 28, 1197-1210.
    • (1982) Management Science , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 29
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems
    • Talbot, F.B. and Patterson, J.H. (1978), "An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems", Management Science 24, 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 30
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G., and Özdamar, L. (1989), "Heuristic performance and network/resource characteristics in resource-constrained project scheduling", Journal of the Operational Research Society 40, 1145-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2
  • 31
    • 0028396719 scopus 로고
    • A constraint based perspective in resource constrained project scheduling
    • Ulusoy, G., and Özdamar, L. (1994), "A constraint based perspective in resource constrained project scheduling", International Journal of Production Research 32, 693-705.
    • (1994) International Journal of Production Research , vol.32 , pp. 693-705
    • Ulusoy, G.1    Özdamar, L.2
  • 34
    • 0027235016 scopus 로고
    • Scheduling a project to maximize its net present value: An integer programming approach
    • Yang, K.K., Talbot, F.B., and Patterson, J.H. (1993), "Scheduling a project to maximize its net present value: An integer programming approach", European Journal of Operational Research 64, 188-198.
    • (1993) European Journal of Operational Research , vol.64 , pp. 188-198
    • Yang, K.K.1    Talbot, F.B.2    Patterson, J.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.