메뉴 건너뛰기




Volumn 22, Issue 1, 2009, Pages 55-68

Real-time, cooperative enterprises for customised mass production

Author keywords

Coordination; Monitoring and control; Production network; Scheduling

Indexed keywords

INTEGRATED CONTROL; PRODUCTION CONTROL; REAL TIME CONTROL; SCHEDULING;

EID: 60849122863     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920802369324     Document Type: Article
Times cited : (7)

References (26)
  • 1
    • 77950515757 scopus 로고    scopus 로고
    • Supply chain coordination with contracts
    • G. de Kok and S.C. Graves, eds, Boston, MA: Elsevier
    • Cachon, G.P., 2003. Supply chain coordination with contracts. In: G. de Kok and S.C. Graves, eds. Supply chain management: Design, coordination, cooperation. Boston, MA: Elsevier, 229-339.
    • (2003) Supply chain management: Design, coordination, cooperation , pp. 229-339
    • Cachon, G.P.1
  • 2
    • 34249935613 scopus 로고    scopus 로고
    • The new role of inventories in business: Real world changes and research consequences
    • Chikán, A., 2007. The new role of inventories in business: Real world changes and research consequences. International Journal of Production Economics, 108, 54-62.
    • (2007) International Journal of Production Economics , vol.108 , pp. 54-62
    • Chikán, A.1
  • 3
    • 26644446942 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness in a generalized job shop
    • De Bontridder, K.M.J., 2005. Minimizing total weighted tardiness in a generalized job shop. Journal of Scheduling, 8, 479-496.
    • (2005) Journal of Scheduling , vol.8 , pp. 479-496
    • De Bontridder, K.M.J.1
  • 4
    • 60849088497 scopus 로고    scopus 로고
    • Computing lower and upper bounds for a large-scale industrial job-shop scheduling problem
    • At press
    • Drótos, M., Erdos, G., and Kis, T., 2008. Computing lower and upper bounds for a large-scale industrial job-shop scheduling problem. European Journal of Operational Research. At press.
    • (2008) European Journal of Operational Research
    • Drótos, M.1    Erdos, G.2    Kis, T.3
  • 6
    • 60849138090 scopus 로고    scopus 로고
    • A logistics framework for coordinating supply chains on unstable markets
    • P.F. Cunha and P.G. Maropoulos, eds, New York: Springer
    • Egri, P. and Váncza, J., 2007. A logistics framework for coordinating supply chains on unstable markets. In: P.F. Cunha and P.G. Maropoulos, eds. Digital Enterprises Technology - Perspectives and Future Challenges. New York: Springer, 59-66.
    • (2007) Digital Enterprises Technology - Perspectives and Future Challenges , pp. 59-66
    • Egri, P.1    Váncza, J.2
  • 7
  • 10
    • 0346438795 scopus 로고    scopus 로고
    • A large step random walk for minimizing total weighted tardiness in a job shop
    • Kreipl, S., 2000. A large step random walk for minimizing total weighted tardiness in a job shop. Journal of Scheduling, 3, 125-138.
    • (2000) Journal of Scheduling , vol.3 , pp. 125-138
    • Kreipl, S.1
  • 11
  • 12
    • 0742319169 scopus 로고    scopus 로고
    • An efficient genetic algorithm for job shop scheduling with tardiness objectives
    • Mattfeld, D.C. and Bierwirth, C., 2004. An efficient genetic algorithm for job shop scheduling with tardiness objectives. European Journal of Operational Research, 155, 616-630.
    • (2004) European Journal of Operational Research , vol.155 , pp. 616-630
    • Mattfeld, D.C.1    Bierwirth, C.2
  • 13
    • 0141569723 scopus 로고    scopus 로고
    • AI and machine learning techniques for managing complexity, changes and uncertainties in manufacturing
    • Monostori, L., 2003. AI and machine learning techniques for managing complexity, changes and uncertainties in manufacturing. Engineering Applications of Artificial Intelligence, 16 (4), 277-291.
    • (2003) Engineering Applications of Artificial Intelligence , vol.16 , Issue.4 , pp. 277-291
    • Monostori, L.1
  • 14
    • 34250214965 scopus 로고    scopus 로고
    • Solution approaches to real-time control of customized mass production
    • Monostori, L., et al., 2007. Solution approaches to real-time control of customized mass production. CIRP Annals - Manufacturing Technology, 56 (1), 431-434.
    • (2007) CIRP Annals - Manufacturing Technology , vol.56 , Issue.1 , pp. 431-434
    • Monostori, L.1
  • 16
    • 70349389243 scopus 로고    scopus 로고
    • Real-time, cooperative enterprises: Requirements and solution approaches
    • London: Elsevier
    • Monostori, L., et al., 2006b. Real-time, cooperative enterprises: requirements and solution approaches. Information Control Problems in Manufacturing, Vol. I, London: Elsevier, 561-566.
    • (2006) Information Control Problems in Manufacturing , vol.1 , pp. 561-566
    • Monostori, L.1
  • 18
    • 10444237299 scopus 로고    scopus 로고
    • Supply chain management and advanced planning-basics, overview and challenges
    • Stadtler, H., 2005. Supply chain management and advanced planning-basics, overview and challenges. European Journal of Operational Research, 163, 575-588.
    • (2005) European Journal of Operational Research , vol.163 , pp. 575-588
    • Stadtler, H.1
  • 19
    • 0030705504 scopus 로고    scopus 로고
    • A collaborative control system for mass customization manufacturing
    • Tseng, M.M., Lei, M., and Su, C., 1997. A collaborative control system for mass customization manufacturing. CIRP Annals - Manufacturing Technology, 46 (1), 373-376.
    • (1997) CIRP Annals - Manufacturing Technology , vol.46 , Issue.1 , pp. 373-376
    • Tseng, M.M.1    Lei, M.2    Su, C.3
  • 20
    • 0346528633 scopus 로고    scopus 로고
    • Tseng, M.M. and Piller, F.T, eds, New York: Springer
    • Tseng, M.M. and Piller, F.T., (eds), 2003. The Customer Centric Enterprise. New York: Springer.
    • (2003) The Customer Centric Enterprise
  • 21
    • 33750072036 scopus 로고    scopus 로고
    • Coordinating supply networks in customized mass production - A contract-based approach
    • Vancza, J. and Egri, P., 2006. Coordinating supply networks in customized mass production - A contract-based approach. CIRP Annals - Manufacturing Technology, 55 (1), 489-492.
    • (2006) CIRP Annals - Manufacturing Technology , vol.55 , Issue.1 , pp. 489-492
    • Vancza, J.1    Egri, P.2
  • 22
    • 43649096691 scopus 로고    scopus 로고
    • A coordination mechanism for rolling horizon planning in supply networks
    • At press
    • Váncza, J., Egri, P., and Monostori, L., 2008. A coordination mechanism for rolling horizon planning in supply networks. CIRP Annals - Manufacturing Technology, 57 (1). At press.
    • (2008) CIRP Annals - Manufacturing Technology , vol.57 , Issue.1
    • Váncza, J.1    Egri, P.2    Monostori, L.3
  • 23
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M. and Whitin, T.M., 1958. Dynamic version of the economic lot size model. Management Science, 5, 89-96.
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 26
    • 0033705205 scopus 로고    scopus 로고
    • Finite schedule monitoring and filtering in a computer integrated manufacturing environment
    • Wilhelm, R., et al., 2000. Finite schedule monitoring and filtering in a computer integrated manufacturing environment. CIRP Annals - Manufacturing Technology, 49 (1), 335-338.
    • (2000) CIRP Annals - Manufacturing Technology , vol.49 , Issue.1 , pp. 335-338
    • Wilhelm, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.