메뉴 건너뛰기




Volumn 51, Issue 1, 2002, Pages 371-374

Deadlock-free rescheduling in flexible manufacturing systems

Author keywords

Flexible manufacturing systems; Rescheduling and Time Petri Nets

Indexed keywords

MATERIALS HANDLING; PETRI NETS; PRODUCTION;

EID: 0037501228     PISSN: 00078506     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0007-8506(07)61539-X     Document Type: Article
Times cited : (14)

References (15)
  • 1
    • 0000312362 scopus 로고
    • Scheduling and control of flexible manufacturing systems: A critical review
    • Basnet C., and Mize J. H., "Scheduling and Control of Flexible Manufacturing Systems: a Critical Review", Int. J. Comp. Integ. Manuf., 7(6), pp. 340-355, 1994.
    • (1994) Int. J. Comp. Integ. Manuf. , vol.7 , Issue.6 , pp. 340-355
    • Basnet, C.1    Mize, J.H.2
  • 3
    • 0030415222 scopus 로고
    • On-line knowledge-based simulation for FMS: A state of the art survey
    • Gonzalez L. R., "On-line Knowledge-based Simulation for FMS: a State of the Art Survey", Proc. of the 1995 Winter Simulation Conf., pp. 1057-1061.
    • (1995) Proc. of the 1995 Winter Simulation Conf. , pp. 1057-1061
    • Gonzalez, L.R.1
  • 4
    • 0029505630 scopus 로고
    • Simulation-based real-time scheduling: Review of recent development
    • Harmonosky M., "Simulation-based Real-time Scheduling: Review of Recent Development", Proc. of the 1995 Winter Simulation Conf., pp. 220-225 1995.
    • (1995) Proc. of the 1995 Winter Simulation Conf. , pp. 220-225
    • Harmonosky, M.1
  • 5
    • 0001982473 scopus 로고
    • Real-time scheduling in computer integrated manufacturing: A review if recent research
    • Harmonosky M., and Robohn S. F., "Real-time Scheduling in Computer Integrated Manufacturing: a Review if Recent Research", Int. J. Comp. Integ. Manuf., 4(6), pp. 331-340, 1991.
    • (1991) Int. J. Comp. Integ. Manuf. , vol.4 , Issue.6 , pp. 331-340
    • Harmonosky, M.1    Robohn, S.F.2
  • 6
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jain K., and ElMaraghy H. A., "Production Scheduling/Rescheduling In Flexible Manufacturing", Int. J. Prod. Res., 35(1), pp. 281-309, 1997.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.1 , pp. 281-309
    • Jain, K.1    ElMaraghy, H.A.2
  • 7
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • Li R., Shyu Y., and Adiga S., "A Heuristic Rescheduling Algorithm for Computer-based Production Scheduling Systems", Int. J. Prod. Res., 31(8), pp. 1815-1826, 1993.
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.8 , pp. 1815-1826
    • Li, R.1    Shyu, Y.2    Adiga, S.3
  • 8
    • 0034206959 scopus 로고    scopus 로고
    • Alternative shop floor control of a flexible manufacturing system - A temporal rescheduling approach
    • USA
    • Lin C. R., "Alternative shop floor control of a flexible manufacturing system - a temporal rescheduling approach", Int. J. of Ind. Eng.: Theory Applications and Practice, 7(2), USA pp. 168-178, 2000.
    • (2000) Int. J. of Ind. Eng.: Theory Applications and Practice , vol.7 , Issue.2 , pp. 168-178
    • Lin, C.R.1
  • 9
    • 0030399084 scopus 로고    scopus 로고
    • The state of the art in intelligent real-time FMS control: A comprehensive survey
    • Shukla S., and Chen F. F., "The State of the Art in Intelligent Real-time FMS Control: a Comprehensive Survey", J. Intelligent Manuf., 7, pp. 441-455, 1996.
    • (1996) J. Intelligent Manuf. , vol.7 , pp. 441-455
    • Shukla, S.1    Chen, F.F.2
  • 10
    • 0002646899 scopus 로고
    • Knowledge-based reactive scheduling
    • Szelke S., and Kerr R. M., "Knowledge-based Reactive Scheduling", J. Prod. Planning and Control, 5(2), pp. 124-145, 1994.
    • (1994) J. Prod. Planning and Control , vol.5 , Issue.2 , pp. 124-145
    • Szelke, S.1    Kerr, R.M.2
  • 11
    • 0022097890 scopus 로고
    • Scheduling / rescheduling in the manufacturing operating system environment
    • Yamamoto M., and Nof S.Y., Scheduling / rescheduling in the Manufacturing Operating System Environment", Int. J. Prod. Res., 23(4), pp, 705-7 22, 1985.
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2
  • 12
    • 0033296663 scopus 로고    scopus 로고
    • Dispatching rules for scheduling and feedback control in a virtual enterprise: A simulation approach
    • Tipi N. S., and Bennett S., "Dispatching rules for scheduling and feedback control in a virtual enterprise: a simulation approach", Int. J. of Flexible Automation and Integ. Manuf., 7(3), pp. 293-303, 1999.
    • (1999) Int. J. of Flexible Automation and Integ. Manuf. , vol.7 , Issue.3 , pp. 293-303
    • Tipi, N.S.1    Bennett, S.2
  • 13
    • 0034953281 scopus 로고    scopus 로고
    • Backlog-oriented automatic production control
    • Wiendahl H. P., and Breithaupt J. W., "Backlog-oriented automatic production control", CIRP Annals, Manuf. Tech., 50(1), pp. 331-334, 2001
    • (2001) CIRP Annals, Manuf. Tech. , vol.50 , Issue.1 , pp. 331-334
    • Wiendahl, H.P.1    Breithaupt, J.W.2
  • 14
    • 0033640850 scopus 로고    scopus 로고
    • Automatic production control applying control theory
    • Wiendahl H. P., and Breithaupt J. W., "Automatic production control applying control theory", Int. J. of Prod. Economics, 63(1), pp. 33-46, 2000
    • (2000) Int. J. of Prod. Economics , vol.63 , Issue.1 , pp. 33-46
    • Wiendahl, H.P.1    Breithaupt, J.W.2
  • 15
    • 0032630279 scopus 로고    scopus 로고
    • Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
    • Wu N., "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model", IEEE Trans, on Sys., Man and Cybernetics, 29(2), p 192-204, 1999.
    • (1999) IEEE Trans, on Sys., Man and Cybernetics , vol.29 , Issue.2 , pp. 192-204
    • Wu, N.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.