메뉴 건너뛰기




Volumn , Issue , 2008, Pages 987-995

Combined use of modeling techniques for the development of the conceptual model in simulation projects

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL MODELS; CONCEPTUAL MODELS; ENTERPRISE IS; MODELING TECHNIQUES; SIMULATION PROJECTS;

EID: 60749128657     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2008.4736165     Document Type: Conference Paper
Times cited : (11)

References (20)
  • 2
    • 0033114836 scopus 로고    scopus 로고
    • An integrated modelling method to support manufacturing systems analysis and design
    • Al-Ahmari, A. M. A., and Ridgway, K. 1999. An integrated modelling method to support manufacturing systems analysis and design. Computers in Industry 38 (3): 225-238.
    • (1999) Computers in Industry , vol.38 , Issue.3 , pp. 225-238
    • Al-Ahmari, A.M.A.1    Ridgway, K.2
  • 3
    • 1642519731 scopus 로고    scopus 로고
    • Verification, validation, and certification of modeling and simulation applications
    • eds, S. Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • Balci, O. 2003, Verification, validation, and certification of modeling and simulation applications. In Proceedings of the 2003 Winter Simulation Conference, eds, S. Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, 150-158. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 150-158
    • Balci, O.1
  • 9
    • 0034187609 scopus 로고    scopus 로고
    • Conceptual frame for development of optimized simulation based scheduling systems
    • Jeong, K. Y, 2000. Conceptual frame for development of optimized simulation based scheduling systems. Expert Systems with Applications 18 (4): 299-306,
    • (2000) Expert Systems with Applications , vol.18 , Issue.4 , pp. 299-306
    • Jeong, K.Y.1
  • 10
    • 0001841217 scopus 로고    scopus 로고
    • Business process change: A study of methodologies, techniques, and tools
    • Kettinger, W, J., Teng, J, T. C, and Guha, S, 1997, Business process change: a study of methodologies, techniques, and tools. MIS Quarterly 21 (1): 55-80,
    • (1997) MIS Quarterly , vol.21 , Issue.1 , pp. 55-80
    • Kettinger, W.J.1    Teng, J.T.C.2    Guha, S.3
  • 11
    • 60749102327 scopus 로고
    • Theory and Methodology: Verification and validation of simulation models
    • Kleijnen, J. P. C. 1995. Theory and Methodology: Verification and validation of simulation models. European Journal of Operational Research 82: 45-162.
    • (1995) European Journal of Operational Research , vol.82 , pp. 45-162
    • Kleijnen, J.P.C.1
  • 14
    • 49749132812 scopus 로고    scopus 로고
    • Montevechi, J. A. B., Pinho, A. F. de; Leal, F. and Marins, F. A. S. 2007. Application of design of experiments on the simulation of a process in an automotive industry. In Proceedings of the 2007 Winter Simulation Conference, eds. S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, 1601-1609. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Montevechi, J. A. B., Pinho, A. F. de; Leal, F. and Marins, F. A. S. 2007. Application of design of experiments on the simulation of a process in an automotive industry. In Proceedings of the 2007 Winter Simulation Conference, eds. S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, 1601-1609. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
  • 15
    • 0033874509 scopus 로고    scopus 로고
    • Methodology for rapid identification and collection of input data in the simulation of the manufacturing systems
    • Perera, T. and Liyanage, K. 2000. Methodology for rapid identification and collection of input data in the simulation of the manufacturing systems. Simulation Practice and Theory 7: 645-656.
    • (2000) Simulation Practice and Theory , vol.7 , pp. 645-656
    • Perera, T.1    Liyanage, K.2
  • 16
    • 33645498740 scopus 로고    scopus 로고
    • Potential pitfalls of process modeling: Part A
    • Rosemann, M. 2006. Potential pitfalls of process modeling: part A. Business Process Management Journal 12 (2): 249-254.
    • (2006) Business Process Management Journal , vol.12 , Issue.2 , pp. 249-254
    • Rosemann, M.1
  • 17
    • 49749092683 scopus 로고    scopus 로고
    • Verification and validation of simulation models
    • eds. S. G. Henderson, B. Biller, M, H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • Sargent, R. G. 2007. Verification and validation of simulation models. In Proceedings of the 2007 Winter Simulation Conference, eds. S. G. Henderson, B. Biller, M.- H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, 124-137. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2007) Proceedings of the 2007 Winter Simulation Conference , pp. 124-137
    • Sargent, R.G.1
  • 18
    • 0029368279 scopus 로고
    • Implementing IDEF techniques as simulation modelling specifications
    • Van Rensburg, A. and Zwemstra, N. 1995. Implementing IDEF techniques as simulation modelling specifications. Computers & Industrial Engineering 29(1): 467-471.
    • (1995) Computers & Industrial Engineering , vol.29 , Issue.1 , pp. 467-471
    • Van Rensburg, A.1    Zwemstra, N.2
  • 19
    • 49749113977 scopus 로고    scopus 로고
    • Empirical investigations of conceptual modeling and the modeling process
    • eds. S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • Wang, W. and Brooks, R. J. 2007. In: Empirical investigations of conceptual modeling and the modeling process. In Proceedings of the 2007 Winter Simulation Conference, eds. S. G. Henderson, B. Biller, M.-H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, 1601-1609. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2007) Proceedings of the 2007 Winter Simulation Conference , pp. 1601-1609
    • Wang, W.1    Brooks, R.J.2
  • 20
    • 46149106399 scopus 로고    scopus 로고
    • What can be done to automate conceptual simulation modeling?
    • eds. L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc
    • Zhou, M., Zhanh, Q. and Chen, Z. 2006. What can be done to automate conceptual simulation modeling? In Proceedings of the 2006 Winter Simulation Conference, eds. L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, 809-814. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2006) Proceedings of the 2006 Winter Simulation Conference , pp. 809-814
    • Zhou, M.1    Zhanh, Q.2    Chen, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.