메뉴 건너뛰기




Volumn 43, Issue 1, 2009, Pages 35-54

Machine repair problem in production systems with spares and server vacations

Author keywords

Hybrid multiple single vacation; Machine repair problem; Matrix geometric approach; Multiple vacations; Single vacation

Indexed keywords

MARKOV PROCESSES;

EID: 59149089906     PISSN: 03990559     EISSN: 28047303     Source Type: Journal    
DOI: 10.1051/ro/2009004     Document Type: Article
Times cited : (25)

References (22)
  • 2
    • 0042856082 scopus 로고
    • A queueing model for spare coal faces
    • F.J. Toft and H. Boothroyd, A queueing model for spare coal faces. Oper. Res. Quart. 10 (1959) 245-251.
    • (1959) Oper. Res. Quart , vol.10 , pp. 245-251
    • Toft, F.J.1    Boothroyd, H.2
  • 3
    • 0024878188 scopus 로고
    • Economic analysis of the M/M/R machine repair problem with warm standbys
    • B.D. Sivazlian and K.-H. Wang, Economic analysis of the M/M/R machine repair problem with warm standbys. Microelectron. Reliab. 29 (1989) 25-35.
    • (1989) Microelectron. Reliab , vol.29 , pp. 25-35
    • Sivazlian, B.D.1    Wang, K.-H.2
  • 4
    • 0027628185 scopus 로고
    • Cost analysis of the M/M/R machine repair problem with mixed standby spares
    • K.-H. Wang, Cost analysis of the M/M/R machine repair problem with mixed standby spares. Microelectron. Reliab. 33 (1993) 1293-1301.
    • (1993) Microelectron. Reliab , vol.33 , pp. 1293-1301
    • Wang, K.-H.1
  • 5
    • 0032017420 scopus 로고    scopus 로고
    • Cost analysis of the cold-standby M/M/R machine repair problem with multiple modes of failure
    • K.-H. Wang and H.-C. Lee, Cost analysis of the cold-standby M/M/R machine repair problem with multiple modes of failure. Microelectron. Reliab. 38. (1998) 435-441.
    • (1998) Microelectron. Reliab , vol.38 , pp. 435-441
    • Wang, K.-H.1    Lee, H.-C.2
  • 6
    • 2142762512 scopus 로고    scopus 로고
    • M. Jain, Rakhee and S. Maheshwari, N-policy for a machine repair system with spares and reneging. Appl. Math. Model. 28 (2004) 513-531.
    • M. Jain, Rakhee and S. Maheshwari, N-policy for a machine repair system with spares and reneging. Appl. Math. Model. 28 (2004) 513-531.
  • 7
    • 0037565734 scopus 로고
    • The productivity of several machines under the care of one operator
    • H. Ashcroft, The productivity of several machines under the care of one operator. J. R. Stat. Soc. B 12 (1950) 145-151.
    • (1950) J. R. Stat. Soc. B , vol.12 , pp. 145-151
    • Ashcroft, H.1
  • 8
    • 0019613266 scopus 로고
    • An optimum repair policy for the machine interference problem
    • E.A. Elsayed, An optimum repair policy for the machine interference problem. J. Oper. Res. Soc. 32 (1981) 793-801.
    • (1981) J. Oper. Res. Soc , vol.32 , pp. 793-801
    • Elsayed, E.A.1
  • 9
    • 0016927922 scopus 로고
    • An approach to cost analysis of maintenance float systems
    • J.E. Hilliard, An approach to cost analysis of maintenance float systems. IIE Trans. 8 (1976) 128-133.
    • (1976) IIE Trans , vol.8 , pp. 128-133
    • Hilliard, J.E.1
  • 11
    • 0020887683 scopus 로고
    • A closed queueing network model for multi-echelon repairable item provisioning
    • D. Gross, D.R. Miller and R.M. Soland, A closed queueing network model for multi-echelon repairable item provisioning. IIE Trans. 15 (1983) 344-352.
    • (1983) IIE Trans , vol.15 , pp. 344-352
    • Gross, D.1    Miller, D.R.2    Soland, R.M.3
  • 12
    • 33748288041 scopus 로고    scopus 로고
    • Profit analysis of the M/M/R machine repair problem with balking, reneging, and standby switching failures
    • K.H.Wang, J.B. Ke and J.C. Ke, Profit analysis of the M/M/R machine repair problem with balking, reneging, and standby switching failures. Comput. Oper. Res. 34 (2007) 835-847.
    • (2007) Comput. Oper. Res , vol.34 , pp. 835-847
    • Wang, K.H.1    Ke, J.B.2    Ke, J.C.3
  • 13
    • 34250125289 scopus 로고
    • Queueing system with vacations-a survey
    • B.T. Doshi, Queueing system with vacations-a survey. Queueing Syst. 1 (1986) 29-66.
    • (1986) Queueing Syst , vol.1 , pp. 29-66
    • Doshi, B.T.1
  • 14
    • 0010212052 scopus 로고
    • Queueing analysis: A foundation of performance evaluation
    • Part I. North-Holland, Amsterdam
    • H. Takagi, Queueing analysis: A foundation of performance evaluation, Vol. I. Vacation and priority systems, Part I. North-Holland, Amsterdam (1991).
    • (1991) Vacation and priority systems , vol.1
    • Takagi, H.1
  • 15
    • 0031118455 scopus 로고    scopus 로고
    • Machine interference problem with warm spares, server vacations and exhaustive service
    • S.M. Gupta, Machine interference problem with warm spares, server vacations and exhaustive service. Perform. Eval. 29 (1997) 195-211.
    • (1997) Perform. Eval , vol.29 , pp. 195-211
    • Gupta, S.M.1
  • 16
    • 7244232826 scopus 로고    scopus 로고
    • M. Jain, Rakhee and M. Singh, Bilevel control of degraded machining system with warm standbys, setup and vacation. Appl. Math. Model 28 (2004) 1015-1026.
    • M. Jain, Rakhee and M. Singh, Bilevel control of degraded machining system with warm standbys, setup and vacation. Appl. Math. Model 28 (2004) 1015-1026.
  • 17
    • 33645284984 scopus 로고    scopus 로고
    • Vacation policies for machine interference problem with an un-reliable server and state-dependent service rate
    • J.C. Ke, Vacation policies for machine interference problem with an un-reliable server and state-dependent service rate. J. Chinese Institute Industrial Engineers 23 (2006) 100-114.
    • (2006) J. Chinese Institute Industrial Engineers , vol.23 , pp. 100-114
    • Ke, J.C.1
  • 18
    • 0009469245 scopus 로고
    • Stochastic Petri net analysis of finite population vacation queueing systems
    • O.C. Ibe and K.S. Trivedi, Stochastic Petri net analysis of finite population vacation queueing systems. Queueing Syst. 8 (1991) 111-128.
    • (1991) Queueing Syst , vol.8 , pp. 111-128
    • Ibe, O.C.1    Trivedi, K.S.2
  • 19
    • 0038535926 scopus 로고
    • A coal unloader: A finite queueing system with breakdowns
    • K. Chelst, A.Z. Tilles and J.S. Pipis, A coal unloader: a finite queueing system with breakdowns. Interfaces 11 (1981) 12-24.
    • (1981) Interfaces , vol.11 , pp. 12-24
    • Chelst, K.1    Tilles, A.Z.2    Pipis, J.S.3
  • 22
    • 0003018305 scopus 로고
    • The productivity of machines requiring attention at random interval
    • F. Benson and D.R. Cox, The productivity of machines requiring attention at random interval. J. R. Stat. Soc. B 13 (1951) 65-82.
    • (1951) J. R. Stat. Soc. B , vol.13 , pp. 65-82
    • Benson, F.1    Cox, D.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.