메뉴 건너뛰기




Volumn 56, Issue 1, 2009, Pages 283-293

Optimization of operation and changeover time for production planning and scheduling in a flexible manufacturing system

Author keywords

Flexible manufacturing system; Integer programming; Machine loading; Machining; Part grouping; Process planning; Sequencing; Tool allocation

Indexed keywords

DYNAMIC PROGRAMMING; ENGINE CYLINDERS; FLEXIBLE MANUFACTURING SYSTEMS; GROUP TECHNOLOGY; MACHINE DESIGN; MACHINING; MANUFACTURE; PLANNING; PROCESS CONTROL; PROCESS ENGINEERING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; PROGRAMMING THEORY; PROJECT MANAGEMENT;

EID: 59049096002     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2008.06.001     Document Type: Article
Times cited : (35)

References (29)
  • 1
    • 0030284842 scopus 로고    scopus 로고
    • Tool magazine arrangement and operations sequencing on CNC machines
    • Avci S., and Akturk M.S. Tool magazine arrangement and operations sequencing on CNC machines. Computers and Operations Research 23 11 (1996) 1069-1081
    • (1996) Computers and Operations Research , vol.23 , Issue.11 , pp. 1069-1081
    • Avci, S.1    Akturk, M.S.2
  • 2
    • 59049102799 scopus 로고    scopus 로고
    • Balas, E., 1964. Extension de l'algorithme additif á la programmation en nombres entiers et á la programmation non linéaire. Paris: C.R. Acad. Sci.
    • Balas, E., 1964. Extension de l'algorithme additif á la programmation en nombres entiers et á la programmation non linéaire. Paris: C.R. Acad. Sci.
  • 3
    • 0024140442 scopus 로고
    • A heuristic for minimizing number of tool switches on a flexible machine
    • Bard J.F. A heuristic for minimizing number of tool switches on a flexible machine. IIE Transactions 20 4 (1988) 382-391
    • (1988) IIE Transactions , vol.20 , Issue.4 , pp. 382-391
    • Bard, J.F.1
  • 4
    • 30244441969 scopus 로고
    • An integer programming approach to a class of combinatorial optimization problems
    • Beale E.M.L., and Tomlin J.A. An integer programming approach to a class of combinatorial optimization problems. Mathematical Programming 3 1 (1972) 339-344
    • (1972) Mathematical Programming , vol.3 , Issue.1 , pp. 339-344
    • Beale, E.M.L.1    Tomlin, J.A.2
  • 5
    • 12244256124 scopus 로고    scopus 로고
    • Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
    • Ecker K.H., and Gupta J.N.D. Scheduling tasks on a flexible manufacturing machine to minimize tool change delays. European Journal of Operational Research 164 3 (2005) 627-638
    • (2005) European Journal of Operational Research , vol.164 , Issue.3 , pp. 627-638
    • Ecker, K.H.1    Gupta, J.N.D.2
  • 8
    • 0001189913 scopus 로고
    • Converting the 0-1 polynomial programming problems to a 0-1 linear program
    • Glover F., and Woolsey E. Converting the 0-1 polynomial programming problems to a 0-1 linear program. Operations Research 22 1 (1974) 180-182
    • (1974) Operations Research , vol.22 , Issue.1 , pp. 180-182
    • Glover, F.1    Woolsey, E.2
  • 10
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimizing tool switches when scheduling part types on a flexible machine
    • Hertz A., Laporte G., Mittaz M., and Stecke K.E. Heuristics for minimizing tool switches when scheduling part types on a flexible machine. IIE Transactions 30 8 (1998) 689-694
    • (1998) IIE Transactions , vol.30 , Issue.8 , pp. 689-694
    • Hertz, A.1    Laporte, G.2    Mittaz, M.3    Stecke, K.E.4
  • 12
    • 0033099219 scopus 로고    scopus 로고
    • Real-time operation and tool selection in single-stage multi-machine systems
    • Koo P.H., and Tanchoco J.M.A. Real-time operation and tool selection in single-stage multi-machine systems. International Journal of Production Research 37 5 (1999) 1023-1039
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 1023-1039
    • Koo, P.H.1    Tanchoco, J.M.A.2
  • 13
    • 0029638546 scopus 로고
    • Dynamic grouping of parts in flexible manufacturing systems - a self organizing neural networks approach
    • Kulkarni U.R., and Kiang M.Y. Dynamic grouping of parts in flexible manufacturing systems - a self organizing neural networks approach. European Journal of Operational Research 84 1 (1995) 192-212
    • (1995) European Journal of Operational Research , vol.84 , Issue.1 , pp. 192-212
    • Kulkarni, U.R.1    Kiang, M.Y.2
  • 14
    • 0027608954 scopus 로고
    • An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems
    • Liang M., and Dutta S.P. An integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems. European Journal of Operational Research 67 3 (1993) 387-404
    • (1993) European Journal of Operational Research , vol.67 , Issue.3 , pp. 387-404
    • Liang, M.1    Dutta, S.P.2
  • 15
    • 84987041563 scopus 로고
    • Solving a combined part-selection, machine-loading, and tool-configuration problem in flexible manufacturing systems
    • Liang M., and Dutta S.P. Solving a combined part-selection, machine-loading, and tool-configuration problem in flexible manufacturing systems. Production and Operations Management 2 2 (1993) 97-113
    • (1993) Production and Operations Management , vol.2 , Issue.2 , pp. 97-113
    • Liang, M.1    Dutta, S.P.2
  • 16
    • 0028377653 scopus 로고
    • A formulation and solution methodology for part movement minimization and workload balancing at loading decisions in FMS
    • Modi B.K., and Shankar K. A formulation and solution methodology for part movement minimization and workload balancing at loading decisions in FMS. International Journal of production Economics 34 1 (1994) 73-82
    • (1994) International Journal of production Economics , vol.34 , Issue.1 , pp. 73-82
    • Modi, B.K.1    Shankar, K.2
  • 18
    • 0026239447 scopus 로고
    • Heuristic solution to the scheduling problems in flexible manufacturing system
    • Mukhopadhyay S.K., Maiti B., and Garg S. Heuristic solution to the scheduling problems in flexible manufacturing system. International Journal of Production Research 29 10 (1991) 2003-2024
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 2003-2024
    • Mukhopadhyay, S.K.1    Maiti, B.2    Garg, S.3
  • 20
    • 0002874558 scopus 로고
    • Formulations and heuristic solutions for part grouping and tool loading in flexible manufacturing systems
    • University of Michigan, Ann Arbor, MI, USA
    • Rajagopalan S. Formulations and heuristic solutions for part grouping and tool loading in flexible manufacturing systems. Proc. of the 2nd ORSA/TIMS Conf. FMS (1986), University of Michigan, Ann Arbor, MI, USA 447-486
    • (1986) Proc. of the 2nd ORSA/TIMS Conf. FMS , pp. 447-486
    • Rajagopalan, S.1
  • 21
    • 0025419819 scopus 로고
    • Modeling and scheduling of a flexible manufacturing system
    • Sawik T. Modeling and scheduling of a flexible manufacturing system. European Journal of Operational Research 45 2-3 (1990) 177-190
    • (1990) European Journal of Operational Research , vol.45 , Issue.2-3 , pp. 177-190
    • Sawik, T.1
  • 22
    • 0023384747 scopus 로고
    • Machine loading and tool allocation problem in flexible manufacturing systems
    • Sarin S.C., and Chen C.S. Machine loading and tool allocation problem in flexible manufacturing systems. International Journal of Production Research 25 7 (1987) 1081-1094
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 23
    • 0035480394 scopus 로고    scopus 로고
    • Sequencing, scheduling and tooling single-stage multifunctional machines in a small batch environment
    • Sinriech D., Rubinovitz J., Milo D., and Nakbily G. Sequencing, scheduling and tooling single-stage multifunctional machines in a small batch environment. IIE Transactions 33 10 (2001) 897-911
    • (2001) IIE Transactions , vol.33 , Issue.10 , pp. 897-911
    • Sinriech, D.1    Rubinovitz, J.2    Milo, D.3    Nakbily, G.4
  • 24
    • 0028517614 scopus 로고
    • A hierarchical model for control of flexible manufacturing systems
    • Sodhi M.S., Askin R.G., and Sen S. A hierarchical model for control of flexible manufacturing systems. Journal of the Operational Research Society 45 10 (1994) 1185-1196
    • (1994) Journal of the Operational Research Society , vol.45 , Issue.10 , pp. 1185-1196
    • Sodhi, M.S.1    Askin, R.G.2    Sen, S.3
  • 25
    • 0020718128 scopus 로고
    • Formulations and solutions of nonlinear integer production planning problems for flexible manufacturing systems
    • Stecke K.E. Formulations and solutions of nonlinear integer production planning problems for flexible manufacturing systems. Management Science 29 3 (1983) 273-288
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 26
    • 59049083465 scopus 로고    scopus 로고
    • Stecke, K. E., & Kim, I. (1988). Comparison of various approaches to part type selection problem in flexible manufacturing systems, Recent developments in production research, Collection of refereed papers presented at the IXth international conference on production research (pp. 675-681).
    • Stecke, K. E., & Kim, I. (1988). Comparison of various approaches to part type selection problem in flexible manufacturing systems, Recent developments in production research, Collection of refereed papers presented at the IXth international conference on production research (pp. 675-681).
  • 27
    • 0025894458 scopus 로고
    • A flexible approach to part type selection in flexible flow systems using part mix ratios
    • Stecke K.E., and Kim I. A flexible approach to part type selection in flexible flow systems using part mix ratios. International Journal of Production Research 29 1 (1991) 53-75
    • (1991) International Journal of Production Research , vol.29 , Issue.1 , pp. 53-75
    • Stecke, K.E.1    Kim, I.2
  • 28
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, part I: minimization of the number of tool switches
    • Tang C.S., and Denardo E.V. Models arising from a flexible manufacturing machine, part I: minimization of the number of tool switches. Operations Research 36 5 (1988) 767-777
    • (1988) Operations Research , vol.36 , Issue.5 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 29
    • 0024071392 scopus 로고
    • Models arising from a flexible manufacturing machine, part II: minimization of the number of tool switches
    • Tang C.S., and Denardo E.V. Models arising from a flexible manufacturing machine, part II: minimization of the number of tool switches. Operations Research 36 5 (1988) 778-784
    • (1988) Operations Research , vol.36 , Issue.5 , pp. 778-784
    • Tang, C.S.1    Denardo, E.V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.