메뉴 건너뛰기




Volumn 50, Issue 3, 2009, Pages 777-785

Integrating generation and transmission networks reliability for unit commitment solution

Author keywords

Integer coded genetic algorithm; Reliability constraints; Transmission network; Unit commitment

Indexed keywords

ELECTRIC POWER TRANSMISSION NETWORKS; GENETIC ALGORITHMS; INTEGRATION; LINEARIZATION; PROBABILITY; PUMPS; ULTRASONICS;

EID: 58649108542     PISSN: 01968904     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enconman.2008.09.027     Document Type: Article
Times cited : (15)

References (23)
  • 1
    • 33646379100 scopus 로고    scopus 로고
    • AC contingency dispatch based on security-constrained unit commitment
    • Fu Y., Shahidehpour M., and Li Z. AC contingency dispatch based on security-constrained unit commitment. IEEE Trans Power Syst 21 2 (2006) 897-907
    • (2006) IEEE Trans Power Syst , vol.21 , Issue.2 , pp. 897-907
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 2
    • 42949165510 scopus 로고    scopus 로고
    • Solving unit commitment problems with general ramp constraints
    • Frangioni A., Gentile C., and Lacalandra F. Solving unit commitment problems with general ramp constraints. Elect Power Energy Syst 30 5 (2008) 316-326
    • (2008) Elect Power Energy Syst , vol.30 , Issue.5 , pp. 316-326
    • Frangioni, A.1    Gentile, C.2    Lacalandra, F.3
  • 3
    • 38749093778 scopus 로고    scopus 로고
    • Ramp rate constrained unit commitment by improved priority list and augmented Lagrange Hopfield network
    • Dieu V.N., and Ongsakul W. Ramp rate constrained unit commitment by improved priority list and augmented Lagrange Hopfield network. Elect Power Syst Res 78 3 (2008) 291-301
    • (2008) Elect Power Syst Res , vol.78 , Issue.3 , pp. 291-301
    • Dieu, V.N.1    Ongsakul, W.2
  • 4
    • 0026103230 scopus 로고
    • A new approach for solving extended unit commitment problem
    • Ruzic S., and Rajakovic N. A new approach for solving extended unit commitment problem. IEEE Trans Power Syst 6 1 (1991) 269-277
    • (1991) IEEE Trans Power Syst , vol.6 , Issue.1 , pp. 269-277
    • Ruzic, S.1    Rajakovic, N.2
  • 5
    • 0026818580 scopus 로고
    • Fuel constrained unit commitment
    • Vemuri S., and Lemonidis L. Fuel constrained unit commitment. IEEE Trans Power Syst 7 1 (1992) 410-415
    • (1992) IEEE Trans Power Syst , vol.7 , Issue.1 , pp. 410-415
    • Vemuri, S.1    Lemonidis, L.2
  • 6
    • 0029252684 scopus 로고
    • The generalized unit commitment problem
    • Baldick R. The generalized unit commitment problem. IEEE Trans Power Syst 10 2 (1995) 465-475
    • (1995) IEEE Trans Power Syst , vol.10 , Issue.2 , pp. 465-475
    • Baldick, R.1
  • 8
    • 0029356616 scopus 로고
    • Short term generation scheduling with transmission and environmental constrains using an augmented lagrangian Relaxation
    • Wang S.J., Shahidehpour M., Kirschen D.S., Mokhtari S., and Irisarri G.D. Short term generation scheduling with transmission and environmental constrains using an augmented lagrangian Relaxation. IEEE Trans Power Syst 10 3 (1995) 1294-1301
    • (1995) IEEE Trans Power Syst , vol.10 , Issue.3 , pp. 1294-1301
    • Wang, S.J.1    Shahidehpour, M.2    Kirschen, D.S.3    Mokhtari, S.4    Irisarri, G.D.5
  • 9
    • 0033910136 scopus 로고    scopus 로고
    • Effective decomposition and coordination algorithms for unit commitment and economic dispatch with security constraints
    • Xiaa Q., Songb Y.H., Zhanga B., Kanga C.Q., and Xianga N. Effective decomposition and coordination algorithms for unit commitment and economic dispatch with security constraints. Electric Power Syst Res 53 (2000) 39-45
    • (2000) Electric Power Syst Res , vol.53 , pp. 39-45
    • Xiaa, Q.1    Songb, Y.H.2    Zhanga, B.3    Kanga, C.Q.4    Xianga, N.5
  • 10
    • 0036087297 scopus 로고    scopus 로고
    • Chattopadhyay D, Balclick R. Unit commitment with probabilistic reserve. In: Proceeding of the IEEE power engineering society winter meeting; 2002. p. 280-5.
    • Chattopadhyay D, Balclick R. Unit commitment with probabilistic reserve. In: Proceeding of the IEEE power engineering society winter meeting; 2002. p. 280-5.
  • 11
    • 0029283223 scopus 로고
    • An expert system approach to the unit commitment problem
    • Kothari D.P., and Ahmad A. An expert system approach to the unit commitment problem. Energy Convers Manage 36 4 (1995) 257-261
    • (1995) Energy Convers Manage , vol.36 , Issue.4 , pp. 257-261
    • Kothari, D.P.1    Ahmad, A.2
  • 12
    • 1442289950 scopus 로고    scopus 로고
    • An electricity market with a probabilistic spinning reserve criteria
    • Bouffard F., and Galiana F.D. An electricity market with a probabilistic spinning reserve criteria. IEEE Trans Power Syst 19 1 (2004) 300-306
    • (2004) IEEE Trans Power Syst , vol.19 , Issue.1 , pp. 300-306
    • Bouffard, F.1    Galiana, F.D.2
  • 14
    • 0034298498 scopus 로고    scopus 로고
    • A reliability framework for generating unit commitment
    • Billinton R., and Fotuhi-Firuzabad M. A reliability framework for generating unit commitment. Elect Power Syst Res 56 (2000) 81-88
    • (2000) Elect Power Syst Res , vol.56 , pp. 81-88
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 15
    • 0028482457 scopus 로고
    • Generating system operating health analysis considering stand-by units, interruptible load and postponable outages
    • Billinton R., and Fotuhi-Firuzabad M. Generating system operating health analysis considering stand-by units, interruptible load and postponable outages. IEEE Trans Power Syst 9 3 (1994) 1618-1625
    • (1994) IEEE Trans Power Syst , vol.9 , Issue.3 , pp. 1618-1625
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 16
    • 33847666075 scopus 로고    scopus 로고
    • Reliability constrained unit commitment using simulated annealing
    • Simopoulos D.N., Kavatza S.D., and Vournas C.D. Reliability constrained unit commitment using simulated annealing. IEEE Trans Power Syst 21 4 (2006) 1699-1706
    • (2006) IEEE Trans Power Syst , vol.21 , Issue.4 , pp. 1699-1706
    • Simopoulos, D.N.1    Kavatza, S.D.2    Vournas, C.D.3
  • 17
    • 33845910110 scopus 로고    scopus 로고
    • Unit commitment with probabilistic reserve: an IPSO approach
    • Lee T.Y., and Chen C.L. Unit commitment with probabilistic reserve: an IPSO approach. Energy Convers Manage 48 2 (2007) 486-493
    • (2007) Energy Convers Manage , vol.48 , Issue.2 , pp. 486-493
    • Lee, T.Y.1    Chen, C.L.2
  • 18
    • 1342344949 scopus 로고    scopus 로고
    • Ant colony optimization algorithm with random perturbation behavior to the problem of optimal unit commitment with probabilistic spinning reserve determination
    • Shia L., Haoa J., Zhoub J., and Xub G. Ant colony optimization algorithm with random perturbation behavior to the problem of optimal unit commitment with probabilistic spinning reserve determination. Electric Power Syst Res 69 (2004) 295-303
    • (2004) Electric Power Syst Res , vol.69 , pp. 295-303
    • Shia, L.1    Haoa, J.2    Zhoub, J.3    Xub, G.4
  • 20
    • 2542640865 scopus 로고    scopus 로고
    • A solution to the unit-commitment problem using integer-coded genetic algorithm
    • Damousis I.G., Bakirtzis A.G., and Dokopoulos P.S. A solution to the unit-commitment problem using integer-coded genetic algorithm. IEEE Trans Power Syst 19 2 (2004) 1165-1172
    • (2004) IEEE Trans Power Syst , vol.19 , Issue.2 , pp. 1165-1172
    • Damousis, I.G.1    Bakirtzis, A.G.2    Dokopoulos, P.S.3
  • 22
    • 58649107467 scopus 로고    scopus 로고
    • .
    • .


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.