메뉴 건너뛰기




Volumn 36, Issue 8, 2009, Pages 2484-2489

Developing a coordinated vendor-buyer model in two-stage supply chains with stochastic lead-times

Author keywords

Coordinated vendor buyer; Integrated production inventory; Stochastic lead time

Indexed keywords

RANDOM PROCESSES; SHIPS; STOCHASTIC MODELS; SUPPLY CHAINS;

EID: 58549114175     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2008.10.001     Document Type: Article
Times cited : (64)

References (23)
  • 1
    • 41149149311 scopus 로고    scopus 로고
    • Topics in real-time supply chain management
    • Tarantilis C.D. Topics in real-time supply chain management. Computers & Operations Research 35 (2008) 3393-3396
    • (2008) Computers & Operations Research , vol.35 , pp. 3393-3396
    • Tarantilis, C.D.1
  • 3
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • Goyal S.K. An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research 15 1 (1976) 107-111
    • (1976) International Journal of Production Research , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 4
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee A. A joint economic-lot-size model for purchaser and vendor. Decision Sciences 17 (1986) 292-311
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 5
    • 84985781712 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor: a comment
    • Goyal S.K. A joint economic-lot-size model for purchaser and vendor: a comment. Decision Sciences 19 (1988) 236-241
    • (1988) Decision Sciences , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 6
    • 0001539415 scopus 로고
    • A one-vendor multi-buyer integrated inventory model: a comment
    • Goyal S.K. A one-vendor multi-buyer integrated inventory model: a comment. European Journal of Operational Research 82 (1995) 209-210
    • (1995) European Journal of Operational Research , vol.82 , pp. 209-210
    • Goyal, S.K.1
  • 7
    • 0031101243 scopus 로고    scopus 로고
    • The single-vendor single-buyer integrated production-inventory model with a generalized policy
    • Hill R.M. The single-vendor single-buyer integrated production-inventory model with a generalized policy. European Journal of Operational Research 97 (1997) 493-499
    • (1997) European Journal of Operational Research , vol.97 , pp. 493-499
    • Hill, R.M.1
  • 8
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory model
    • Hill R.M. The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory model. International Journal of Production Research 37 (1999) 2463-2475
    • (1999) International Journal of Production Research , vol.37 , pp. 2463-2475
    • Hill, R.M.1
  • 9
    • 3242717595 scopus 로고    scopus 로고
    • An optimal policy for a single-vendor single-buyer integrated production inventory problem with process unreliability consideration
    • Huang C.K. An optimal policy for a single-vendor single-buyer integrated production inventory problem with process unreliability consideration. International Journal of Production Economics 91 (2004) 91-98
    • (2004) International Journal of Production Economics , vol.91 , pp. 91-98
    • Huang, C.K.1
  • 10
    • 33646107382 scopus 로고    scopus 로고
    • A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer
    • Hoque M., and Goyal S.K. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics 102 (2006) 217-225
    • (2006) International Journal of Production Economics , vol.102 , pp. 217-225
    • Hoque, M.1    Goyal, S.K.2
  • 12
    • 26844537321 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
    • Chang H.C., Ouyang L.Y., Wu K.S., and Ho C.H. Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research 170 (2006) 481-495
    • (2006) European Journal of Operational Research , vol.170 , pp. 481-495
    • Chang, H.C.1    Ouyang, L.Y.2    Wu, K.S.3    Ho, C.H.4
  • 13
    • 33749988426 scopus 로고    scopus 로고
    • Production and shipment lot sizing in vendor-buyer supply chain with transportation cost
    • Ertogral K., Ben-Daya M., and Darwish M. Production and shipment lot sizing in vendor-buyer supply chain with transportation cost. European Journal of Operational Research 176 (2007) 1592-1606
    • (2007) European Journal of Operational Research , vol.176 , pp. 1592-1606
    • Ertogral, K.1    Ben-Daya, M.2    Darwish, M.3
  • 14
    • 0034236847 scopus 로고    scopus 로고
    • Economic ordering policy of deteriorated item for vendor and buyer: an integrated approach
    • Yang P.C., and Wee H.M. Economic ordering policy of deteriorated item for vendor and buyer: an integrated approach. Production Planning & Control 11 5 (2000) 474-480
    • (2000) Production Planning & Control , vol.11 , Issue.5 , pp. 474-480
    • Yang, P.C.1    Wee, H.M.2
  • 15
    • 37849188598 scopus 로고    scopus 로고
    • A discussion on economic ordering policy of deteriorated item for vendor and buyer
    • Wee H.M., Jong J.F., and Yang P.C. A discussion on economic ordering policy of deteriorated item for vendor and buyer. Production Planning & Control 17 8 (2006) 792-795
    • (2006) Production Planning & Control , vol.17 , Issue.8 , pp. 792-795
    • Wee, H.M.1    Jong, J.F.2    Yang, P.C.3
  • 16
    • 33947188042 scopus 로고    scopus 로고
    • Optimal replenishment policy for an integrated supplier-buyer deteriorating inventory model considering multiple JIT delivery and other cost functions
    • Chung C.J., and Wee H.M. Optimal replenishment policy for an integrated supplier-buyer deteriorating inventory model considering multiple JIT delivery and other cost functions. Asia Pacific Journal of Operations Research 24 1 (2007) 125-145
    • (2007) Asia Pacific Journal of Operations Research , vol.24 , Issue.1 , pp. 125-145
    • Chung, C.J.1    Wee, H.M.2
  • 17
    • 36148988360 scopus 로고    scopus 로고
    • Collaborative vendor-buyer inventory system with declining market
    • Yang P.C., Wee H.M., and Hsu P.H. Collaborative vendor-buyer inventory system with declining market. Computers & Industrial Engineering 54 1 (2008) 128-139
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.1 , pp. 128-139
    • Yang, P.C.1    Wee, H.M.2    Hsu, P.H.3
  • 18
    • 34547144645 scopus 로고    scopus 로고
    • A mutual beneficial pricing strategy of an integrated vendor-buyers inventory system
    • Wee H.M., and Yang P.C. A mutual beneficial pricing strategy of an integrated vendor-buyers inventory system. International Journal of Advanced Manufacturing Technology 34 (2007) 179-187
    • (2007) International Journal of Advanced Manufacturing Technology , vol.34 , pp. 179-187
    • Wee, H.M.1    Yang, P.C.2
  • 19
    • 58549116452 scopus 로고    scopus 로고
    • A win-win strategy for an integrated vendor-buyer deteriorating inventory system
    • Yang P.C., and Wee H.M. A win-win strategy for an integrated vendor-buyer deteriorating inventory system. Mathematical Modeling and Analysis 11 1 (2006) 1-16
    • (2006) Mathematical Modeling and Analysis , vol.11 , Issue.1 , pp. 1-16
    • Yang, P.C.1    Wee, H.M.2
  • 20
    • 10144234131 scopus 로고    scopus 로고
    • A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering
    • Lee W. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering. Omega 33 (2005) 163-174
    • (2005) Omega , vol.33 , pp. 163-174
    • Lee, W.1
  • 22
    • 9544241347 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
    • Ouyang L., Wu K., and Ho C. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics 92 (2004) 255-266
    • (2004) International Journal of Production Economics , vol.92 , pp. 255-266
    • Ouyang, L.1    Wu, K.2    Ho, C.3
  • 23
    • 0346503081 scopus 로고    scopus 로고
    • An integrated single-vendor single-buyer inventory system with shortage derived algebraically
    • Wu K., and Ouyang L. An integrated single-vendor single-buyer inventory system with shortage derived algebraically. Production Planning & Control 14 6 (2003) 555-561
    • (2003) Production Planning & Control , vol.14 , Issue.6 , pp. 555-561
    • Wu, K.1    Ouyang, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.