-
1
-
-
84948647901
-
-
The Warren Company, The Association of Strategic Alliances Professional Inc., Wesley, MA
-
ASAP (1999) Alliance Work Book – Introduction Successful Alliances, The Warren Company, The Association of Strategic Alliances Professional Inc., Wesley, MA.
-
(1999)
Alliance Work Book – Introduction Successful Alliances
-
-
ASAP1
-
2
-
-
0034391513
-
A survey of supply chain collaboration and management in the UK construction industry
-
Akintoye, A., McIntosh, G. and Fitzgerald, E. (2000) ‘A survey of supply chain collaboration and management in the UK construction industry’, European Journal of Purchasing and Supply Management, Vol. 6, No. 3, pp.159–168.
-
(2000)
European Journal of Purchasing and Supply Management
, vol.6
, Issue.3
, pp. 159-168
-
-
Akintoye, A.1
McIntosh, G.2
Fitzgerald, E.3
-
3
-
-
0032595622
-
Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
-
Atkinson, R. (1999) ‘Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria’, International Journal of Project Management, Vol. 17, No. 6, pp.337–342.
-
(1999)
International Journal of Project Management
, vol.17
, Issue.6
, pp. 337-342
-
-
Atkinson, R.1
-
4
-
-
0000225043
-
Designing the green supply chain
-
Beamon, B.M. (1999) ‘Designing the green supply chain’, Logistics Information Management, Vol. 12, No. 4, pp.332–342.
-
(1999)
Logistics Information Management
, vol.12
, Issue.4
, pp. 332-342
-
-
Beamon, B.M.1
-
5
-
-
20744455983
-
KPIs: a critical appraisal of their use in construction
-
Beatham, S., Anumba, C., Thorp, T. and Hedges, I. (2004) ‘KPIs: a critical appraisal of their use in construction’, Benchmarking: An International Journal, Vol. 11, No. 1, pp.93–117.
-
(2004)
Benchmarking: An International Journal
, vol.11
, Issue.1
, pp. 93-117
-
-
Beatham, S.1
Anumba, C.2
Thorp, T.3
Hedges, I.4
-
6
-
-
0030173778
-
A new framework for determining criteria success/failure factors in projects
-
Belassi, W. and Tukel, O.I. (1996) ‘A new framework for determining criteria success/failure factors in projects’, International Journal of Project Management, Vol. 14, No. 3, pp.141–151.
-
(1996)
International Journal of Project Management
, vol.14
, Issue.3
, pp. 141-151
-
-
Belassi, W.1
Tukel, O.I.2
-
7
-
-
0033792524
-
Building partnerships: case studies of client-contractor collaboration in the UK construction industry
-
Bresnen, M. and Marshall, N. (2000) ‘Building partnerships: case studies of client-contractor collaboration in the UK construction industry’, Construction, Management and Economies, Vol. 18, No. 7, pp.819–832.
-
(2000)
Construction, Management and Economies
, vol.18
, Issue.7
, pp. 819-832
-
-
Bresnen, M.1
Marshall, N.2
-
8
-
-
0037109647
-
Analysing supply chain performance using a balanced measurement method
-
Bullinger, H.J., Kuhner, M. and van Hoof, A. (2002) ‘Analysing supply chain performance using a balanced measurement method’, International Journal of Production Research, Vol. 40, No. 15, pp.3533–3543.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.15
, pp. 3533-3543
-
-
Bullinger, H.J.1
Kuhner, M.2
van Hoof, A.3
-
9
-
-
0041308391
-
Barriers to partnerships in the public sector: the case of the UK construction industry
-
Burns, B. and Coram, R. (1999) ‘Barriers to partnerships in the public sector: the case of the UK construction industry’, Supply Chain Management, Vol. 4, No. 1, pp.43–50.
-
(1999)
Supply Chain Management
, vol.4
, Issue.1
, pp. 43-50
-
-
Burns, B.1
Coram, R.2
-
11
-
-
23744452042
-
Key performance indicators for measuring construction success
-
Chan, A. and Chan, A.P.L. (2004) ‘Key performance indicators for measuring construction success’, Benchmarking: An International Journal, Vol. 11, No. 2, pp.203–221.
-
(2004)
Benchmarking: An International Journal
, vol.11
, Issue.2
, pp. 203-221
-
-
Chan, A.1
Chan, A.P.L.2
-
12
-
-
61549137837
-
Construction process reengineering: a case study
-
Chan, A.P.C., Fan, L.C.N. and Yu, A.T.W. (1999) ‘Construction process reengineering: a case study’, Logistics Information Management, Vol. 12, No. 16, pp.467–475.
-
(1999)
Logistics Information Management
, vol.12
, Issue.16
, pp. 467-475
-
-
Chan, A.P.C.1
Fan, L.C.N.2
Yu, A.T.W.3
-
13
-
-
0038292124
-
Feasibility of performance measurement system for supply chain: a process-based approach and measures
-
Chan, F. and Qi, H. (2001) ‘Feasibility of performance measurement system for supply chain: a process-based approach and measures’, Integrated Manufacturing Systems, Vol. 14, No. 3, pp.179–190.
-
(2001)
Integrated Manufacturing Systems
, vol.14
, Issue.3
, pp. 179-190
-
-
Chan, F.1
Qi, H.2
-
14
-
-
0035483683
-
Infrastructure of partnering for construction projects
-
Cheng, E.W.L., Li, H., Drew, D.S. and Yeung, N. (2001) ‘Infrastructure of partnering for construction projects’, Journal of Management in Engineering, Vol. 17, No. 4, pp.229–237.
-
(2001)
Journal of Management in Engineering
, vol.17
, Issue.4
, pp. 229-237
-
-
Cheng, E.W.L.1
Li, H.2
Drew, D.S.3
Yeung, N.4
-
16
-
-
0031141618
-
Partnering process model
-
Crane, T.G., Felder, J.P., Thompson, P.J., Thompson, M.G. and Sanders, S.R. (1997) ‘Partnering process model’, Journal of Management in Engineering, Vol. 13, No. 3, pp.57–63.
-
(1997)
Journal of Management in Engineering
, vol.13
, Issue.3
, pp. 57-63
-
-
Crane, T.G.1
Felder, J.P.2
Thompson, P.J.3
Thompson, M.G.4
Sanders, S.R.5
-
17
-
-
84948647981
-
-
Newsletter, No. 3, August, Chun Wo Holding Limited
-
CWHL (2005) Subcontractor Partnership Alignment SPA, Newsletter, No. 3, August, Chun Wo Holding Limited, Accessed 5 March, 2006 at http://www.chunwo.com/chunwo/newsletter/info/news20.pdf.
-
(2005)
Subcontractor Partnership Alignment SPA
-
-
CWHL1
-
18
-
-
0011694470
-
Performance measurement: a practitioner’s perspective
-
Dreyer, D. (2000) ‘Performance measurement: a practitioner’s perspective’, Supply Chain Management Review, Vol. 4, No. 4, pp.62–68.
-
(2000)
Supply Chain Management Review
, vol.4
, Issue.4
, pp. 62-68
-
-
Dreyer, D.1
-
19
-
-
0003998117
-
-
UK Department of the Environment, Transport and the Regions – Local and Regional Government, London
-
Egan, J. (1998) Rethink Construction, UK Department of the Environment, Transport and the Regions – Local and Regional Government, London.
-
(1998)
Rethink Construction
-
-
Egan, J.1
-
20
-
-
9444267658
-
Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors
-
Egbu, C.O. (2004) ‘Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors’, Engineering, Construction and Architectural Management, Vol. 11, No. 5, pp.301–315.
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.5
, pp. 301-315
-
-
Egbu, C.O.1
-
21
-
-
32144435973
-
Development of an extended enterprise performance measurement system
-
Folan, P. and Browne, J. (2005) ‘Development of an extended enterprise performance measurement system’, Production Planning and Control, Vol. 16, No. 6, pp.531–544.
-
(2005)
Production Planning and Control
, vol.16
, Issue.6
, pp. 531-544
-
-
Folan, P.1
Browne, J.2
-
22
-
-
12344262759
-
The effect of design quality on quality performance
-
Fynes, B. and Burca, S.D. (2005) ‘The effect of design quality on quality performance’, International Journal of Production Economics, Vol. 96, No. 1, pp.1–14.
-
(2005)
International Journal of Production Economics
, vol.96
, Issue.1
, pp. 1-14
-
-
Fynes, B.1
Burca, S.D.2
-
23
-
-
84948647653
-
-
Gammon Construction Ltd., Hong Kong
-
GCL (2004) The Link 2004 Partners Year, Gammon Construction Ltd., Hong Kong.
-
(2004)
The Link 2004 Partners Year
-
-
GCL1
-
24
-
-
84993083606
-
Client drivers for construction projects: implications for standardization
-
Gibb, A.G.F. and Isack, F. (2001) ‘Client drivers for construction projects: implications for standardization’, Engineering, Construction and Architectural Management, Vol. 8, No. 1, pp.46–58.
-
(2001)
Engineering, Construction and Architectural Management
, vol.8
, Issue.1
, pp. 46-58
-
-
Gibb, A.G.F.1
Isack, F.2
-
25
-
-
0346339454
-
A framework for supply chain performance measurement
-
Gunasekaran, A., Patel, C. and McGaughey, R.E. (2004) ‘A framework for supply chain performance measurement’, International Journal of Production Economics, Vol. 87, No. 3, pp.333–347.
-
(2004)
International Journal of Production Economics
, vol.87
, Issue.3
, pp. 333-347
-
-
Gunasekaran, A.1
Patel, C.2
McGaughey, R.E.3
-
26
-
-
0030559353
-
Supply chain management: relationships chains and networks
-
Harland, C.M. (1996) ‘Supply chain management: relationships chains and networks’, British Journal of Management, Vol. 7, No. 1, pp.63–80.
-
(1996)
British Journal of Management
, vol.7
, Issue.1
, pp. 63-80
-
-
Harland, C.M.1
-
27
-
-
0000942012
-
Evaluating contractor prequalification data: selection criteria a project success factors
-
Hatush, Z. and Skitmore, M. (1997) ‘Evaluating contractor prequalification data: selection criteria a project success factors’, Construction Management and Economics, Vol. 15, No. 2, pp.129–147.
-
(1997)
Construction Management and Economics
, vol.15
, Issue.2
, pp. 129-147
-
-
Hatush, Z.1
Skitmore, M.2
-
28
-
-
33749006577
-
Alliances in construction investigating initiatives and barriers for long-term collaboration
-
Ingirige, B. and Sexton, M. (2006) ‘Alliances in construction investigating initiatives and barriers for long-term collaboration’, Engineering, Construction and Architectural Management, Vol. 13, No. 5, pp.521–535.
-
(2006)
Engineering, Construction and Architectural Management
, vol.13
, Issue.5
, pp. 521-535
-
-
Ingirige, B.1
Sexton, M.2
-
29
-
-
0030355287
-
Linking the balanced scorecard to strategy
-
Kaplan, R.S. and Norton, D.P. (1996a) ‘Linking the balanced scorecard to strategy’, California Management Review, Vol. 39, No. 1, pp.53–79.
-
(1996)
California Management Review
, vol.39
, Issue.1
, pp. 53-79
-
-
Kaplan, R.S.1
Norton, D.P.2
-
30
-
-
0002091684
-
Using the balanced scorecard as a strategic management system
-
Kaplan, R.S. and Norton, D.P. (1996b) ‘Using the balanced scorecard as a strategic management system’, Harvard Business Review, Vol. 74, No. 1, pp.75–85.
-
(1996)
Harvard Business Review
, vol.74
, Issue.1
, pp. 75-85
-
-
Kaplan, R.S.1
Norton, D.P.2
-
31
-
-
84874995285
-
An evaluation of clients’ needs and responsibilities in the construction process
-
Kometa, S., Olomolaiye, P.O. and Harris, F.C. (1995) ‘An evaluation of clients’ needs and responsibilities in the construction process’, Engineering, Construction and Architectural Management, Vol. 2, No. 1, pp.45–56.
-
(1995)
Engineering, Construction and Architectural Management
, vol.2
, Issue.1
, pp. 45-56
-
-
Kometa, S.1
Olomolaiye, P.O.2
Harris, F.C.3
-
32
-
-
0029734237
-
Systematizing construction project evaluations
-
Kumaraswamy, M.M. and Thorpe, A. (1996) ‘Systematizing construction project evaluations’, Journal of Management in Engineering, Vol. 12, No. 1, pp.34–39.
-
(1996)
Journal of Management in Engineering
, vol.12
, Issue.1
, pp. 34-39
-
-
Kumaraswamy, M.M.1
Thorpe, A.2
-
34
-
-
18844379685
-
Is there a relationship between construction conflicts and participants’ satisfaction?
-
Leung, M.Y., Liu, A.M.M. and Ng, S.T. (2005) ‘Is there a relationship between construction conflicts and participants’ satisfaction?’, Engineering, Construction and Architectural Management, Vol. 12, No. 2, pp.149–167.
-
(2005)
Engineering, Construction and Architectural Management
, vol.12
, Issue.2
, pp. 149-167
-
-
Leung, M.Y.1
Liu, A.M.M.2
Ng, S.T.3
-
35
-
-
0004204252
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Martin, J. (1990) Information Engineering, Prentice-Hall, Englewood Cliffs, NJ, pp.1–3.
-
(1990)
Information Engineering
, pp. 1-3
-
-
Martin, J.1
-
36
-
-
0037210847
-
An overview into the concept of partnering
-
Naoum, S. (2003) ‘An overview into the concept of partnering’, International Journal of Project Management, Vol. 21, No. 1, pp.71–76.
-
(2003)
International Journal of Project Management
, vol.21
, Issue.1
, pp. 71-76
-
-
Naoum, S.1
-
37
-
-
0036132474
-
Causes of construction delay: traditional contracts
-
Odeh, A.M. and Battaineh, H.T. (2002) ‘Causes of construction delay: traditional contracts’, International Journal of Project Management, Vol. 20, No. 1, pp.67–73.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.1
, pp. 67-73
-
-
Odeh, A.M.1
Battaineh, H.T.2
-
38
-
-
0011596871
-
Supply chain management: logistics catches up with strategy
-
Christopher, M. (Ed.) Chapman and Hall, London, UK
-
Oliver, R.K. and Webber, M.D. (1982) ‘Supply chain management: logistics catches up with strategy’, in Christopher, M. (Ed.) (1992) Logistics: The Strategic Issues, Chapman and Hall, London, UK, pp.63–75.
-
(1982)
(1992) Logistics: The Strategic Issues
, pp. 63-75
-
-
Oliver, R.K.1
Webber, M.D.2
-
39
-
-
0242513873
-
Reforging construction supply chains: a source selection perspective
-
Palaneeswaran, E., Kumaraswamy, M.M. and Zhang, X.Q. (2001) ‘Reforging construction supply chains: a source selection perspective’, European Journal of Purchasing Management, Vol. 7, No. 3, pp.165–178.
-
(2001)
European Journal of Purchasing Management
, vol.7
, Issue.3
, pp. 165-178
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
Zhang, X.Q.3
-
40
-
-
0037399418
-
Curin congenital construction industry disorders through relationally integrated supply chains
-
Palaneeswaran, E., Kumaraswamy, M.M., Rahman, M. and Ng, T. (2003) ‘Curin congenital construction industry disorders through relationally integrated supply chains’, Building and Environment, Vol. 38, No. 4, pp.571–582.
-
(2003)
Building and Environment
, vol.38
, Issue.4
, pp. 571-582
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
Rahman, M.3
Ng, T.4
-
41
-
-
2342510870
-
How important is cooperation to construction project success? A grounded empirical quantification
-
Phua, F.T.T. and Rowlinson, S. (2004) ‘How important is cooperation to construction project success? A grounded empirical quantification’, Engineering, Construction and Architectural Management, Vol. 11, No. 1, pp.45–54.
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.1
, pp. 45-54
-
-
Phua, F.T.T.1
Rowlinson, S.2
-
42
-
-
0011997327
-
Determinants of cross-functional cooperation in the project implementation process
-
Pinto, M.B. and Pinto, J.K. (1991) ‘Determinants of cross-functional cooperation in the project implementation process’, Project Management Journal, Vol. 22, No. 2, pp.13–20.
-
(1991)
Project Management Journal
, vol.22
, Issue.2
, pp. 13-20
-
-
Pinto, M.B.1
Pinto, J.K.2
-
43
-
-
0000995248
-
Relationship between project interaction and performance indicator
-
Pocock, J.B., Hyun, C.T., Liu, L.Y. and Kim, M.K. (1996) ‘Relationship between project interaction and performance indicator’, Journal of Construction Engineering and Management, Vol. 122, No. 2, pp.165–176.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.2
, pp. 165-176
-
-
Pocock, J.B.1
Hyun, C.T.2
Liu, L.Y.3
Kim, M.K.4
-
44
-
-
19944423175
-
Insights from research – business performance measurements practices in construction engineering organizations
-
Robinson, H.S., Anumba, C.J., Carrillo, P.M. and Al-Ghassani, A.M. (2005) ‘Insights from research – business performance measurements practices in construction engineering organizations’, Measuring Business Excellence, Vol. 9, No. 1, pp.13–22.
-
(2005)
Measuring Business Excellence
, vol.9
, Issue.1
, pp. 13-22
-
-
Robinson, H.S.1
Anumba, C.J.2
Carrillo, P.M.3
Al-Ghassani, A.M.4
-
45
-
-
0002505617
-
The role of main contractors in developing customer focus up and down construction’s supply chain
-
Saad, M. and Jones, M. (1999) ‘The role of main contractors in developing customer focus up and down construction’s supply chain’, Proceedings of Perspectives on Purchasing and Supply for the Millennium, 8th International Annual Conference of the International Purchasing and Supply Education and Research, Dublin, March, pp.29–31.
-
(1999)
Proceedings of Perspectives on Purchasing and Supply for the Millennium, 8th International Annual Conference of the International Purchasing and Supply Education and Research, Dublin
, vol.March
, pp. 29-31
-
-
Saad, M.1
Jones, M.2
-
46
-
-
0036337777
-
A review of the progress towards the adoption of supply chain management relationships in construction
-
Saad, M., Jones, M. and James, P. (2002) ‘A review of the progress towards the adoption of supply chain management relationships in construction’, European Journal of Purchasing and Supply Management, Vol. 8, No. 3, pp.173–183.
-
(2002)
European Journal of Purchasing and Supply Management
, vol.8
, Issue.3
, pp. 173-183
-
-
Saad, M.1
Jones, M.2
James, P.3
-
47
-
-
0002532863
-
Improving project organization through strategic planning of information
-
Sarshar, M. (1994) ‘Improving project organization through strategic planning of information’, International Journal Construction Information Technology, Vol. 2, No. 3, pp.77–94.
-
(1994)
International Journal Construction Information Technology
, vol.2
, Issue.3
, pp. 77-94
-
-
Sarshar, M.1
-
48
-
-
2342475270
-
Supplier logistics performance measurement: indications from a study of the automotive industry
-
Schmitz, J. and Platts, K.W. (2004) ‘Supplier logistics performance measurement: indications from a study of the automotive industry’, International Journal of Production Economics, Vol. 89, No. 2, pp.231–243.
-
(2004)
International Journal of Production Economics
, vol.89
, Issue.2
, pp. 231-243
-
-
Schmitz, J.1
Platts, K.W.2
-
50
-
-
2142767201
-
Implementing innovative functions in construction project management towards the mission of sustainable environment
-
Shen, L.Y., Bao, Q. and Yip, S.L. (2000) ‘Implementing innovative functions in construction project management towards the mission of sustainable environment’, Proceedings of the Millennium Conference on Construction Project Management – Recent Developments and the Way Forward 2000, pp.77–84.
-
(2000)
Proceedings of the Millennium Conference on Construction Project Management – Recent Developments and the Way Forward 2000
, pp. 77-84
-
-
Shen, L.Y.1
Bao, Q.2
Yip, S.L.3
-
51
-
-
84948646132
-
Achieving quality construction projects based on harmonious working relationships
-
Soetanto, R. and Buirn, B. (2001) ‘Achieving quality construction projects based on harmonious working relationships’, International Journal of Quality and Reliability Management, Vol. 16, No. 5, pp.485–506.
-
(2001)
International Journal of Quality and Reliability Management
, vol.16
, Issue.5
, pp. 485-506
-
-
Soetanto, R.1
Buirn, B.2
-
52
-
-
0000971955
-
Project characteristics for successful public-sector design-build
-
Songer, A.D. and Molenaar, K.R. (1997) ‘Project characteristics for successful public-sector design-build’, Journal of Construction Engineering and Management, Vol. 123, No. 1, pp.34–40.
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.1
, pp. 34-40
-
-
Songer, A.D.1
Molenaar, K.R.2
-
53
-
-
33847308577
-
Mutual objectives setting for partnering projects in the public sector
-
Swan, W. and Khalfan, M.A. (2007) ‘Mutual objectives setting for partnering projects in the public sector’, Engineering, Construction and Architectural Management, Vol. 14, No. 2, pp.119–130.
-
(2007)
Engineering, Construction and Architectural Management
, vol.14
, Issue.2
, pp. 119-130
-
-
Swan, W.1
Khalfan, M.A.2
-
54
-
-
84948645353
-
Information modelling for a construction project risk management system
-
Tah, J.H.M. and Carr, V. (1992) ‘Information modelling for a construction project risk management system’, Engineering, Construction and Architectural Management, Vol. 7, No. 2, pp.102–119.
-
(1992)
Engineering, Construction and Architectural Management
, vol.7
, Issue.2
, pp. 102-119
-
-
Tah, J.H.M.1
Carr, V.2
-
56
-
-
30644465929
-
The importance of project cultures in achieving quality outcomes in construction
-
Formoso, C.T. and Ballard, G. (Eds.) Federal University of Rio Grande do Sul, Brazil
-
Thomas, R., Marosszeky, M., Karim, K., Davis, S. and McGeorge, D. (2002) ‘The importance of project cultures in achieving quality outcomes in construction’, in Formoso, C.T. and Ballard, G. (Eds.): Proceedings of 10th Conference of the International Group for Lean Construction, Federal University of Rio Grande do Sul, Brazil, pp.101–113.
-
(2002)
Proceedings of 10th Conference of the International Group for Lean Construction
, pp. 101-113
-
-
Thomas, R.1
Marosszeky, M.2
Karim, K.3
Davis, S.4
McGeorge, D.5
-
58
-
-
84986172670
-
Assessing the inputs and outputs of partnership arrangements for health and safety management
-
Vassie, L.H. and Fuller, C.W. (2003) ‘Assessing the inputs and outputs of partnership arrangements for health and safety management’, Employee Relations, Vol. 25, No. 5, pp.490–501.
-
(2003)
Employee Relations
, vol.25
, Issue.5
, pp. 490-501
-
-
Vassie, L.H.1
Fuller, C.W.2
-
59
-
-
0000331042
-
An investigation into construction time performance
-
Walker, D.H.T. (1995) ‘An investigation into construction time performance’, Construction Management and Economics, Vol. 13, No. 3, pp.263–274.
-
(1995)
Construction Management and Economics
, vol.13
, Issue.3
, pp. 263-274
-
-
Walker, D.H.T.1
-
60
-
-
0442325259
-
Total quality management in construction industry in Hong Kong: a supply chain management perspective
-
Wong, A. and Fung, P. (1999) ‘Total quality management in construction industry in Hong Kong: a supply chain management perspective’, Total Quality Management, Vol. 10, No. 2, pp.191–200.
-
(1999)
Total Quality Management
, vol.10
, Issue.2
, pp. 191-200
-
-
Wong, A.1
Fung, P.2
-
61
-
-
0025462150
-
Project performance evaluation checklist for consulting engineers
-
Wuellner, W.W. (1990) ‘Project performance evaluation checklist for consulting engineers’, Journal of Management in Engineering, Vol. 6, No. 3, pp.270–281.
-
(1990)
Journal of Management in Engineering
, vol.6
, Issue.3
, pp. 270-281
-
-
Wuellner, W.W.1
-
62
-
-
33846466483
-
Coordination mechanisms for construction supply chain management in the internet environment
-
Xue, X., Wang, Y., Shen, Q. and Yu, X. (2007) ‘Coordination mechanisms for construction supply chain management in the internet environment’, International Journal of Project Management, Vol. 25, No. 2, pp.150–157.
-
(2007)
International Journal of Project Management
, vol.25
, Issue.2
, pp. 150-157
-
-
Xue, X.1
Wang, Y.2
Shen, Q.3
Yu, X.4
|