메뉴 건너뛰기




Volumn 1, Issue 2, 2007, Pages 169-183

Performance measurement perspectives in Virtual Partnering projects in the construction industry

Author keywords

measurement perspectives; SCM; SCR; supply chain management; supply chain relationship; virtual partnering; virtual partnering relationship; VP; VPR

Indexed keywords


EID: 58449114510     PISSN: 17500664     EISSN: 17500672     Source Type: Journal    
DOI: 10.1504/IJECRM.2007.016019     Document Type: Article
Times cited : (1)

References (63)
  • 1
    • 84948647901 scopus 로고    scopus 로고
    • The Warren Company, The Association of Strategic Alliances Professional Inc., Wesley, MA
    • ASAP (1999) Alliance Work Book – Introduction Successful Alliances, The Warren Company, The Association of Strategic Alliances Professional Inc., Wesley, MA.
    • (1999) Alliance Work Book – Introduction Successful Alliances
    • ASAP1
  • 2
    • 0034391513 scopus 로고    scopus 로고
    • A survey of supply chain collaboration and management in the UK construction industry
    • Akintoye, A., McIntosh, G. and Fitzgerald, E. (2000) ‘A survey of supply chain collaboration and management in the UK construction industry’, European Journal of Purchasing and Supply Management, Vol. 6, No. 3, pp.159–168.
    • (2000) European Journal of Purchasing and Supply Management , vol.6 , Issue.3 , pp. 159-168
    • Akintoye, A.1    McIntosh, G.2    Fitzgerald, E.3
  • 3
    • 0032595622 scopus 로고    scopus 로고
    • Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • Atkinson, R. (1999) ‘Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria’, International Journal of Project Management, Vol. 17, No. 6, pp.337–342.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 4
    • 0000225043 scopus 로고    scopus 로고
    • Designing the green supply chain
    • Beamon, B.M. (1999) ‘Designing the green supply chain’, Logistics Information Management, Vol. 12, No. 4, pp.332–342.
    • (1999) Logistics Information Management , vol.12 , Issue.4 , pp. 332-342
    • Beamon, B.M.1
  • 6
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining criteria success/failure factors in projects
    • Belassi, W. and Tukel, O.I. (1996) ‘A new framework for determining criteria success/failure factors in projects’, International Journal of Project Management, Vol. 14, No. 3, pp.141–151.
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-151
    • Belassi, W.1    Tukel, O.I.2
  • 7
    • 0033792524 scopus 로고    scopus 로고
    • Building partnerships: case studies of client-contractor collaboration in the UK construction industry
    • Bresnen, M. and Marshall, N. (2000) ‘Building partnerships: case studies of client-contractor collaboration in the UK construction industry’, Construction, Management and Economies, Vol. 18, No. 7, pp.819–832.
    • (2000) Construction, Management and Economies , vol.18 , Issue.7 , pp. 819-832
    • Bresnen, M.1    Marshall, N.2
  • 8
    • 0037109647 scopus 로고    scopus 로고
    • Analysing supply chain performance using a balanced measurement method
    • Bullinger, H.J., Kuhner, M. and van Hoof, A. (2002) ‘Analysing supply chain performance using a balanced measurement method’, International Journal of Production Research, Vol. 40, No. 15, pp.3533–3543.
    • (2002) International Journal of Production Research , vol.40 , Issue.15 , pp. 3533-3543
    • Bullinger, H.J.1    Kuhner, M.2    van Hoof, A.3
  • 9
    • 0041308391 scopus 로고    scopus 로고
    • Barriers to partnerships in the public sector: the case of the UK construction industry
    • Burns, B. and Coram, R. (1999) ‘Barriers to partnerships in the public sector: the case of the UK construction industry’, Supply Chain Management, Vol. 4, No. 1, pp.43–50.
    • (1999) Supply Chain Management , vol.4 , Issue.1 , pp. 43-50
    • Burns, B.1    Coram, R.2
  • 11
    • 23744452042 scopus 로고    scopus 로고
    • Key performance indicators for measuring construction success
    • Chan, A. and Chan, A.P.L. (2004) ‘Key performance indicators for measuring construction success’, Benchmarking: An International Journal, Vol. 11, No. 2, pp.203–221.
    • (2004) Benchmarking: An International Journal , vol.11 , Issue.2 , pp. 203-221
    • Chan, A.1    Chan, A.P.L.2
  • 12
    • 61549137837 scopus 로고    scopus 로고
    • Construction process reengineering: a case study
    • Chan, A.P.C., Fan, L.C.N. and Yu, A.T.W. (1999) ‘Construction process reengineering: a case study’, Logistics Information Management, Vol. 12, No. 16, pp.467–475.
    • (1999) Logistics Information Management , vol.12 , Issue.16 , pp. 467-475
    • Chan, A.P.C.1    Fan, L.C.N.2    Yu, A.T.W.3
  • 13
    • 0038292124 scopus 로고    scopus 로고
    • Feasibility of performance measurement system for supply chain: a process-based approach and measures
    • Chan, F. and Qi, H. (2001) ‘Feasibility of performance measurement system for supply chain: a process-based approach and measures’, Integrated Manufacturing Systems, Vol. 14, No. 3, pp.179–190.
    • (2001) Integrated Manufacturing Systems , vol.14 , Issue.3 , pp. 179-190
    • Chan, F.1    Qi, H.2
  • 17
    • 84948647981 scopus 로고    scopus 로고
    • Newsletter, No. 3, August, Chun Wo Holding Limited
    • CWHL (2005) Subcontractor Partnership Alignment SPA, Newsletter, No. 3, August, Chun Wo Holding Limited, Accessed 5 March, 2006 at http://www.chunwo.com/chunwo/newsletter/info/news20.pdf.
    • (2005) Subcontractor Partnership Alignment SPA
    • CWHL1
  • 18
    • 0011694470 scopus 로고    scopus 로고
    • Performance measurement: a practitioner’s perspective
    • Dreyer, D. (2000) ‘Performance measurement: a practitioner’s perspective’, Supply Chain Management Review, Vol. 4, No. 4, pp.62–68.
    • (2000) Supply Chain Management Review , vol.4 , Issue.4 , pp. 62-68
    • Dreyer, D.1
  • 19
    • 0003998117 scopus 로고    scopus 로고
    • UK Department of the Environment, Transport and the Regions – Local and Regional Government, London
    • Egan, J. (1998) Rethink Construction, UK Department of the Environment, Transport and the Regions – Local and Regional Government, London.
    • (1998) Rethink Construction
    • Egan, J.1
  • 20
    • 9444267658 scopus 로고    scopus 로고
    • Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors
    • Egbu, C.O. (2004) ‘Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors’, Engineering, Construction and Architectural Management, Vol. 11, No. 5, pp.301–315.
    • (2004) Engineering, Construction and Architectural Management , vol.11 , Issue.5 , pp. 301-315
    • Egbu, C.O.1
  • 21
    • 32144435973 scopus 로고    scopus 로고
    • Development of an extended enterprise performance measurement system
    • Folan, P. and Browne, J. (2005) ‘Development of an extended enterprise performance measurement system’, Production Planning and Control, Vol. 16, No. 6, pp.531–544.
    • (2005) Production Planning and Control , vol.16 , Issue.6 , pp. 531-544
    • Folan, P.1    Browne, J.2
  • 22
    • 12344262759 scopus 로고    scopus 로고
    • The effect of design quality on quality performance
    • Fynes, B. and Burca, S.D. (2005) ‘The effect of design quality on quality performance’, International Journal of Production Economics, Vol. 96, No. 1, pp.1–14.
    • (2005) International Journal of Production Economics , vol.96 , Issue.1 , pp. 1-14
    • Fynes, B.1    Burca, S.D.2
  • 23
    • 84948647653 scopus 로고    scopus 로고
    • Gammon Construction Ltd., Hong Kong
    • GCL (2004) The Link 2004 Partners Year, Gammon Construction Ltd., Hong Kong.
    • (2004) The Link 2004 Partners Year
    • GCL1
  • 24
    • 84993083606 scopus 로고    scopus 로고
    • Client drivers for construction projects: implications for standardization
    • Gibb, A.G.F. and Isack, F. (2001) ‘Client drivers for construction projects: implications for standardization’, Engineering, Construction and Architectural Management, Vol. 8, No. 1, pp.46–58.
    • (2001) Engineering, Construction and Architectural Management , vol.8 , Issue.1 , pp. 46-58
    • Gibb, A.G.F.1    Isack, F.2
  • 26
    • 0030559353 scopus 로고    scopus 로고
    • Supply chain management: relationships chains and networks
    • Harland, C.M. (1996) ‘Supply chain management: relationships chains and networks’, British Journal of Management, Vol. 7, No. 1, pp.63–80.
    • (1996) British Journal of Management , vol.7 , Issue.1 , pp. 63-80
    • Harland, C.M.1
  • 27
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequalification data: selection criteria a project success factors
    • Hatush, Z. and Skitmore, M. (1997) ‘Evaluating contractor prequalification data: selection criteria a project success factors’, Construction Management and Economics, Vol. 15, No. 2, pp.129–147.
    • (1997) Construction Management and Economics , vol.15 , Issue.2 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 28
    • 33749006577 scopus 로고    scopus 로고
    • Alliances in construction investigating initiatives and barriers for long-term collaboration
    • Ingirige, B. and Sexton, M. (2006) ‘Alliances in construction investigating initiatives and barriers for long-term collaboration’, Engineering, Construction and Architectural Management, Vol. 13, No. 5, pp.521–535.
    • (2006) Engineering, Construction and Architectural Management , vol.13 , Issue.5 , pp. 521-535
    • Ingirige, B.1    Sexton, M.2
  • 29
    • 0030355287 scopus 로고    scopus 로고
    • Linking the balanced scorecard to strategy
    • Kaplan, R.S. and Norton, D.P. (1996a) ‘Linking the balanced scorecard to strategy’, California Management Review, Vol. 39, No. 1, pp.53–79.
    • (1996) California Management Review , vol.39 , Issue.1 , pp. 53-79
    • Kaplan, R.S.1    Norton, D.P.2
  • 30
    • 0002091684 scopus 로고    scopus 로고
    • Using the balanced scorecard as a strategic management system
    • Kaplan, R.S. and Norton, D.P. (1996b) ‘Using the balanced scorecard as a strategic management system’, Harvard Business Review, Vol. 74, No. 1, pp.75–85.
    • (1996) Harvard Business Review , vol.74 , Issue.1 , pp. 75-85
    • Kaplan, R.S.1    Norton, D.P.2
  • 32
    • 0029734237 scopus 로고    scopus 로고
    • Systematizing construction project evaluations
    • Kumaraswamy, M.M. and Thorpe, A. (1996) ‘Systematizing construction project evaluations’, Journal of Management in Engineering, Vol. 12, No. 1, pp.34–39.
    • (1996) Journal of Management in Engineering , vol.12 , Issue.1 , pp. 34-39
    • Kumaraswamy, M.M.1    Thorpe, A.2
  • 34
    • 18844379685 scopus 로고    scopus 로고
    • Is there a relationship between construction conflicts and participants’ satisfaction?
    • Leung, M.Y., Liu, A.M.M. and Ng, S.T. (2005) ‘Is there a relationship between construction conflicts and participants’ satisfaction?’, Engineering, Construction and Architectural Management, Vol. 12, No. 2, pp.149–167.
    • (2005) Engineering, Construction and Architectural Management , vol.12 , Issue.2 , pp. 149-167
    • Leung, M.Y.1    Liu, A.M.M.2    Ng, S.T.3
  • 35
    • 0004204252 scopus 로고
    • Prentice-Hall, Englewood Cliffs, NJ
    • Martin, J. (1990) Information Engineering, Prentice-Hall, Englewood Cliffs, NJ, pp.1–3.
    • (1990) Information Engineering , pp. 1-3
    • Martin, J.1
  • 36
    • 0037210847 scopus 로고    scopus 로고
    • An overview into the concept of partnering
    • Naoum, S. (2003) ‘An overview into the concept of partnering’, International Journal of Project Management, Vol. 21, No. 1, pp.71–76.
    • (2003) International Journal of Project Management , vol.21 , Issue.1 , pp. 71-76
    • Naoum, S.1
  • 38
    • 0011596871 scopus 로고
    • Supply chain management: logistics catches up with strategy
    • Christopher, M. (Ed.) Chapman and Hall, London, UK
    • Oliver, R.K. and Webber, M.D. (1982) ‘Supply chain management: logistics catches up with strategy’, in Christopher, M. (Ed.) (1992) Logistics: The Strategic Issues, Chapman and Hall, London, UK, pp.63–75.
    • (1982) (1992) Logistics: The Strategic Issues , pp. 63-75
    • Oliver, R.K.1    Webber, M.D.2
  • 40
    • 0037399418 scopus 로고    scopus 로고
    • Curin congenital construction industry disorders through relationally integrated supply chains
    • Palaneeswaran, E., Kumaraswamy, M.M., Rahman, M. and Ng, T. (2003) ‘Curin congenital construction industry disorders through relationally integrated supply chains’, Building and Environment, Vol. 38, No. 4, pp.571–582.
    • (2003) Building and Environment , vol.38 , Issue.4 , pp. 571-582
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2    Rahman, M.3    Ng, T.4
  • 41
    • 2342510870 scopus 로고    scopus 로고
    • How important is cooperation to construction project success? A grounded empirical quantification
    • Phua, F.T.T. and Rowlinson, S. (2004) ‘How important is cooperation to construction project success? A grounded empirical quantification’, Engineering, Construction and Architectural Management, Vol. 11, No. 1, pp.45–54.
    • (2004) Engineering, Construction and Architectural Management , vol.11 , Issue.1 , pp. 45-54
    • Phua, F.T.T.1    Rowlinson, S.2
  • 42
    • 0011997327 scopus 로고
    • Determinants of cross-functional cooperation in the project implementation process
    • Pinto, M.B. and Pinto, J.K. (1991) ‘Determinants of cross-functional cooperation in the project implementation process’, Project Management Journal, Vol. 22, No. 2, pp.13–20.
    • (1991) Project Management Journal , vol.22 , Issue.2 , pp. 13-20
    • Pinto, M.B.1    Pinto, J.K.2
  • 44
    • 19944423175 scopus 로고    scopus 로고
    • Insights from research – business performance measurements practices in construction engineering organizations
    • Robinson, H.S., Anumba, C.J., Carrillo, P.M. and Al-Ghassani, A.M. (2005) ‘Insights from research – business performance measurements practices in construction engineering organizations’, Measuring Business Excellence, Vol. 9, No. 1, pp.13–22.
    • (2005) Measuring Business Excellence , vol.9 , Issue.1 , pp. 13-22
    • Robinson, H.S.1    Anumba, C.J.2    Carrillo, P.M.3    Al-Ghassani, A.M.4
  • 46
    • 0036337777 scopus 로고    scopus 로고
    • A review of the progress towards the adoption of supply chain management relationships in construction
    • Saad, M., Jones, M. and James, P. (2002) ‘A review of the progress towards the adoption of supply chain management relationships in construction’, European Journal of Purchasing and Supply Management, Vol. 8, No. 3, pp.173–183.
    • (2002) European Journal of Purchasing and Supply Management , vol.8 , Issue.3 , pp. 173-183
    • Saad, M.1    Jones, M.2    James, P.3
  • 47
    • 0002532863 scopus 로고
    • Improving project organization through strategic planning of information
    • Sarshar, M. (1994) ‘Improving project organization through strategic planning of information’, International Journal Construction Information Technology, Vol. 2, No. 3, pp.77–94.
    • (1994) International Journal Construction Information Technology , vol.2 , Issue.3 , pp. 77-94
    • Sarshar, M.1
  • 48
    • 2342475270 scopus 로고    scopus 로고
    • Supplier logistics performance measurement: indications from a study of the automotive industry
    • Schmitz, J. and Platts, K.W. (2004) ‘Supplier logistics performance measurement: indications from a study of the automotive industry’, International Journal of Production Economics, Vol. 89, No. 2, pp.231–243.
    • (2004) International Journal of Production Economics , vol.89 , Issue.2 , pp. 231-243
    • Schmitz, J.1    Platts, K.W.2
  • 51
    • 84948646132 scopus 로고    scopus 로고
    • Achieving quality construction projects based on harmonious working relationships
    • Soetanto, R. and Buirn, B. (2001) ‘Achieving quality construction projects based on harmonious working relationships’, International Journal of Quality and Reliability Management, Vol. 16, No. 5, pp.485–506.
    • (2001) International Journal of Quality and Reliability Management , vol.16 , Issue.5 , pp. 485-506
    • Soetanto, R.1    Buirn, B.2
  • 52
    • 0000971955 scopus 로고    scopus 로고
    • Project characteristics for successful public-sector design-build
    • Songer, A.D. and Molenaar, K.R. (1997) ‘Project characteristics for successful public-sector design-build’, Journal of Construction Engineering and Management, Vol. 123, No. 1, pp.34–40.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.1 , pp. 34-40
    • Songer, A.D.1    Molenaar, K.R.2
  • 53
    • 33847308577 scopus 로고    scopus 로고
    • Mutual objectives setting for partnering projects in the public sector
    • Swan, W. and Khalfan, M.A. (2007) ‘Mutual objectives setting for partnering projects in the public sector’, Engineering, Construction and Architectural Management, Vol. 14, No. 2, pp.119–130.
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.2 , pp. 119-130
    • Swan, W.1    Khalfan, M.A.2
  • 54
    • 84948645353 scopus 로고
    • Information modelling for a construction project risk management system
    • Tah, J.H.M. and Carr, V. (1992) ‘Information modelling for a construction project risk management system’, Engineering, Construction and Architectural Management, Vol. 7, No. 2, pp.102–119.
    • (1992) Engineering, Construction and Architectural Management , vol.7 , Issue.2 , pp. 102-119
    • Tah, J.H.M.1    Carr, V.2
  • 56
    • 30644465929 scopus 로고    scopus 로고
    • The importance of project cultures in achieving quality outcomes in construction
    • Formoso, C.T. and Ballard, G. (Eds.) Federal University of Rio Grande do Sul, Brazil
    • Thomas, R., Marosszeky, M., Karim, K., Davis, S. and McGeorge, D. (2002) ‘The importance of project cultures in achieving quality outcomes in construction’, in Formoso, C.T. and Ballard, G. (Eds.): Proceedings of 10th Conference of the International Group for Lean Construction, Federal University of Rio Grande do Sul, Brazil, pp.101–113.
    • (2002) Proceedings of 10th Conference of the International Group for Lean Construction , pp. 101-113
    • Thomas, R.1    Marosszeky, M.2    Karim, K.3    Davis, S.4    McGeorge, D.5
  • 57
  • 58
    • 84986172670 scopus 로고    scopus 로고
    • Assessing the inputs and outputs of partnership arrangements for health and safety management
    • Vassie, L.H. and Fuller, C.W. (2003) ‘Assessing the inputs and outputs of partnership arrangements for health and safety management’, Employee Relations, Vol. 25, No. 5, pp.490–501.
    • (2003) Employee Relations , vol.25 , Issue.5 , pp. 490-501
    • Vassie, L.H.1    Fuller, C.W.2
  • 59
    • 0000331042 scopus 로고
    • An investigation into construction time performance
    • Walker, D.H.T. (1995) ‘An investigation into construction time performance’, Construction Management and Economics, Vol. 13, No. 3, pp.263–274.
    • (1995) Construction Management and Economics , vol.13 , Issue.3 , pp. 263-274
    • Walker, D.H.T.1
  • 60
    • 0442325259 scopus 로고    scopus 로고
    • Total quality management in construction industry in Hong Kong: a supply chain management perspective
    • Wong, A. and Fung, P. (1999) ‘Total quality management in construction industry in Hong Kong: a supply chain management perspective’, Total Quality Management, Vol. 10, No. 2, pp.191–200.
    • (1999) Total Quality Management , vol.10 , Issue.2 , pp. 191-200
    • Wong, A.1    Fung, P.2
  • 61
    • 0025462150 scopus 로고
    • Project performance evaluation checklist for consulting engineers
    • Wuellner, W.W. (1990) ‘Project performance evaluation checklist for consulting engineers’, Journal of Management in Engineering, Vol. 6, No. 3, pp.270–281.
    • (1990) Journal of Management in Engineering , vol.6 , Issue.3 , pp. 270-281
    • Wuellner, W.W.1
  • 62
    • 33846466483 scopus 로고    scopus 로고
    • Coordination mechanisms for construction supply chain management in the internet environment
    • Xue, X., Wang, Y., Shen, Q. and Yu, X. (2007) ‘Coordination mechanisms for construction supply chain management in the internet environment’, International Journal of Project Management, Vol. 25, No. 2, pp.150–157.
    • (2007) International Journal of Project Management , vol.25 , Issue.2 , pp. 150-157
    • Xue, X.1    Wang, Y.2    Shen, Q.3    Yu, X.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.