메뉴 건너뛰기




Volumn 58, Issue 2, 2009, Pages 160-173

Identifying key performance indicators for use in control of pre-project stage process in construction

Author keywords

Construction industry; Construction operations; Performance management; Performance measures; Project planning

Indexed keywords


EID: 58449088710     PISSN: 17410401     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410400910928743     Document Type: Article
Times cited : (29)

References (32)
  • 2
    • 58449126456 scopus 로고    scopus 로고
    • "Performance measuring, benchmarking and modeling of project performance", Proceedings of the 5th International Conference of the International Group for Lean Construction, the University of Birmingham, Edgbaston, August
    • Alarcon, L.F., Serpell, A. 1996 "Performance measuring, benchmarking and modeling of project performance", Proceedings of the 5th International Conference of the International Group for Lean Construction, the University of Birmingham, Edgbaston, August
    • (1996)
    • Alarcon, L.F.1    Serpell, A.2
  • 3
    • 58449118451 scopus 로고    scopus 로고
    • "Looking ahead planning: a missing link in production control", Proceedings of the 5th Annual Conference of the International Group for Lean Construction (IGLC-12), Gold Coast, Australia, July, pp. 13-25
    • Ballard, G. 1997 "Looking ahead planning: a missing link in production control", Proceedings of the 5th Annual Conference of the International Group for Lean Construction (IGLC-12), Gold Coast, Australia, July, pp. 13-25
    • (1997)
    • Ballard, G.1
  • 5
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • Belassi, W., Tukel, O.I. A new framework for determining critical success/failure factors in projects International Journal of Project Management 14 3 1996 141-51
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-51
    • Belassi, W.1    Tukel, O.I.2
  • 9
    • 58449125340 scopus 로고    scopus 로고
    • "Performance measurement systems for benchmarking in the construction industry", available at: www.indicatores.locaweb.com.br
    • Costa, D.B., Formoso, C.T., Kagioglou, M., Alarcon, L.F. 2004 "Performance measurement systems for benchmarking in the construction industry", available at: www.indicatores.locaweb.com.br
    • (2004)
    • Costa, D.B.1    Formoso, C.T.2    Kagioglou, M.3    Alarcon, L.F.4
  • 12
    • 0031235507 scopus 로고    scopus 로고
    • Scope management using the Project Definition Rating Index (PDRI)
    • Dumon, P., Gibson, G., Fish, J. Scope management using the Project Definition Rating Index (PDRI) Journal of Management and Engineering 13 5 1997 54-60
    • (1997) Journal of Management and Engineering , vol.13 , Issue.5 , pp. 54-60
    • Dumon, P.1    Gibson, G.2    Fish, J.3
  • 17
    • 58449105772 scopus 로고
    • "Modelling the construction process using plans of work", Proceedings of International Conference CIB W65, Dubrovnik
    • Hughes, W. 1991 "Modelling the construction process using plans of work", Proceedings of International Conference CIB W65, Dubrovnik
    • (1991)
    • Hughes, W.1
  • 18
    • 58449088285 scopus 로고    scopus 로고
    • "Cross-industry learning: the development of a generic design and construction process based on stage/gate new product development processes found in the manufacturing industry", Proceedings of the Engineering Design Conference, Brunel University, Uxbridge, June
    • Kagioglou, M., Cooper, R., Aouad, G., Hinks, J., Sexton, M., Sheath, D. 1998 "Cross-industry learning: the development of a generic design and construction process based on stage/gate new product development processes found in the manufacturing industry", Proceedings of the Engineering Design Conference, Brunel University, Uxbridge, June
    • (1998)
    • Kagioglou, M.1    Cooper, R.2    Aouad, G.3    Hinks, J.4    Sexton, M.5    Sheath, D.6
  • 20
    • 58449125613 scopus 로고    scopus 로고
    • "Lessons learnt in developing effective performance measures for construction safety management", Proceedings of 12th Annual Conference of the International Group for Lean Construction, Elsinore, Denmark, August
    • Marosszeky, M., Karim, K., Davis, S., Naik, N. 2004 "Lessons learnt in developing effective performance measures for construction safety management", Proceedings of 12th Annual Conference of the International Group for Lean Construction, Elsinore, Denmark, August
    • (2004)
    • Marosszeky, M.1    Karim, K.2    Davis, S.3    Naik, N.4
  • 21
    • 0000610842 scopus 로고
    • Determinants of performance in the traditional building process
    • Mohsini, R., Davidson, C. Determinants of performance in the traditional building process Construction Management and Economics 10 1992 343-59
    • (1992) Construction Management and Economics , vol.10 , pp. 343-59
    • Mohsini, R.1    Davidson, C.2
  • 23
    • 0036466972 scopus 로고    scopus 로고
    • Performance measurement of R&D projects in a multi-project, concurrent engineering environment
    • Pillai, A. Performance measurement of R&D projects in a multi-project, concurrent engineering environment International Journal of Project management 20 2002 165-77
    • (2002) International Journal of Project Management , vol.20 , pp. 165-77
    • Pillai, A.1
  • 24
    • 58449128401 scopus 로고    scopus 로고
    • "Safety and production: an integrated planning and control model", Proceedings of the 10th Conference of the International Group for Lean Construction, Federal University of Rio Grande do Sul, Brazil, August
    • Saurin, T., Formoso, C., Guimaraes, L., Soares, A. 2002 "Safety and production: an integrated planning and control model", Proceedings of the 10th Conference of the International Group for Lean Construction, Federal University of Rio Grande do Sul, Brazil, August
    • (2002)
    • Saurin, T.1    Formoso, C.2    Guimaraes, L.3    Soares, A.4
  • 25
    • 58449106692 scopus 로고    scopus 로고
    • "Ensuring value for money: a value management approach to manage multiple stakeholders in the briefing process", Proceedings of the Conference on Client Driving Innovation: Moving Ideas into Practice, Gold Coast, Australia, March
    • Shen, G. 2006 "Ensuring value for money: a value management approach to manage multiple stakeholders in the briefing process", Proceedings of the Conference on Client Driving Innovation: Moving Ideas into Practice, Gold Coast, Australia, March
    • (2006)
    • Shen, G.1
  • 26
    • 84986085484 scopus 로고    scopus 로고
    • Strategic needs analysis: Its role in brief development
    • Smith, J., Jackson, N. Strategic needs analysis: its role in brief development Facilities 18 13/14 2000 502-12
    • (2000) Facilities , vol.18 , Issue.13-14 , pp. 502-12
    • Smith, J.1    Jackson, N.2
  • 27
    • 58449135269 scopus 로고    scopus 로고
    • "The importance of project cultures in achieving quality outcomes in construction", Proceedings of the 10th Conference of the International Group for Lean Construction, Federal University of Rio Grande do Sul, Brazil, August
    • Thomas, R., Marosszeky, M., Karim, K., Davis, S., McGeorge, D. 2002 "The importance of project cultures in achieving quality outcomes in construction", Proceedings of the 10th Conference of the International Group for Lean Construction, Federal University of Rio Grande do Sul, Brazil, August
    • (2002)
    • Thomas, R.1    Marosszeky, M.2    Karim, K.3    Davis, S.4    McGeorge, D.5
  • 28
    • 0000331042 scopus 로고
    • An investigation into construction time performance
    • Walker, D. An investigation into construction time performance Construction Management and Economics 13 3 1995 263-74
    • (1995) Construction Management and Economics , vol.13 , Issue.3 , pp. 263-74
    • Walker, D.1
  • 31
    • 84986135442 scopus 로고    scopus 로고
    • Investigation of the early stages of project formulation
    • Woodhead, R. Investigation of the early stages of project formulation Facilities 18 13/14 2000 524-34
    • (2000) Facilities , vol.18 , Issue.13-14 , pp. 524-34
    • Woodhead, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.