메뉴 건너뛰기




Volumn 45, Issue 2, 1997, Pages 258-274

Computational evaluation of hierarchical production control policies for stochastic manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTATIONAL METHODS; COSTS; FEEDBACK CONTROL; HEURISTIC METHODS; HIERARCHICAL SYSTEMS; INVENTORY CONTROL; OPTIMIZATION; RANDOM PROCESSES; SCHEDULING;

EID: 0031099719     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.45.2.258     Document Type: Article
Times cited : (15)

References (16)
  • 1
    • 0022667867 scopus 로고
    • Optimal control of production rate in failure prone manufacturing system
    • AKELLA, R. AND P. R. KUMAR. 1986. Optimal Control of Production Rate in Failure Prone Manufacturing System. IEEE Trans. Automat. Control, AC-31, 116-126.
    • (1986) IEEE Trans. Automat. Control , vol.AC-31 , pp. 116-126
    • Akella, R.1    Kumar, A.P.R.2
  • 2
    • 0025532680 scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory
    • Honolulu, HI
    • BAI, S. AND S. GERSHWIN. 1990. Scheduling Manufacturing Systems with Work-In-Process Inventory. Proc. 29th IEEE Conference on Decision and Control, Honolulu, HI, 557-564.
    • (1990) Proc. 29th IEEE Conference on Decision and Control , pp. 557-564
    • Bai, S.1    Gershwin, S.2
  • 4
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • BIELECKI, T. AND P. R. KUMAR. 1988. Optimality of Zero-inventory Policies for Unreliable Manufacturing Systems. Opns. Res. 36, 532-541.
    • (1988) Opns. Res. , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 5
    • 84987012950 scopus 로고
    • A general approach for coordinating production in multiple-cell manufacturing systems
    • BUZACOTT, J. A. AND J. G. SHANTHIKUMAR. 1992. A General Approach for Coordinating Production in Multiple-Cell Manufacturing Systems. Production and Operation Management, 1, 1, 34-52.
    • (1992) Production and Operation Management , vol.1 , Issue.1 , pp. 34-52
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 6
    • 85084180829 scopus 로고
    • Perturbation analysis for the design of flexible manufacturing system flow controllers
    • CARAMANIS, M. AND G. LIBEROPOULOS. 1992. Perturbation Analysis for the Design of Flexible Manufacturing System Flow Controllers. Opns. Res. 40, 1107-1125.
    • (1992) Opns. Res. , vol.40 , pp. 1107-1125
    • Caramanis, M.1    Liberopoulos, G.2
  • 9
    • 0020915621 scopus 로고
    • An algorithm for the computer control of production in flexible manufacturing systems
    • KIMEMIA, J. G. AND S. B. GERSHWIN. 1983. An Algorithm for the Computer Control of Production in Flexible Manufacturing Systems. IIE Trans. 15, 353-362.
    • (1983) IIE Trans. , vol.15 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 12
    • 0001130358 scopus 로고
    • An asymptotic analysis of hierarchical control of manufacturing systems under uncertainty
    • LEHOCZKY, J., S. P. SETHI, H. M. SONER, AND M. TAKSAR. 1991. An Asymptotic Analysis of Hierarchical Control of Manufacturing Systems under Uncertainty. Math. O.R. 16, 596-608.
    • (1991) Math. O.R. , vol.16 , pp. 596-608
    • Lehoczky, J.1    Sethi, S.P.2    Soner, H.M.3    Taksar, M.4
  • 13
    • 0028392099 scopus 로고
    • Optimal feedback production planning in a stochastic two-machine flowshop
    • LOU, S. X. C, S. P. SETHI, AND Q. ZHANG. 1994. Optimal Feedback Production Planning in a Stochastic Two-machine Flowshop. European J. O.R. 73, 331-345.
    • (1994) European J. O.R. , vol.73 , pp. 331-345
    • Lou, S.X.C.1    Sethi, S.P.2    Zhang, Q.3
  • 14
    • 0001744740 scopus 로고
    • Optimal control rules for scheduling job shops
    • LOU, S. X. C. AND G. VAN RYZIN. 1989. Optimal Control Rules for Scheduling Job Shops. Ann. O.R. 17, 233-248.
    • (1989) Ann. O.R. , vol.17 , pp. 233-248
    • Lou, S.X.C.1    Van Ryzin, G.2
  • 15
    • 85033315327 scopus 로고    scopus 로고
    • Optimal feedback production planning in stochastic dynamic job-shops
    • Proceedings of the 1996 SIAM-AMS Workshop on the Mathematics and Stochastic Manufacturing Systems, Williamsburg, VA, June 17-21, 1996. G. Yin and Q. Zhang (eds.). American Mathematical Society, Providence, RI
    • PRESMAN, E., S. P. SETHI, AND W. Suo. 1997. Optimal Feedback Production Planning in Stochastic Dynamic Job-shops. Proceedings of the 1996 SIAM-AMS Workshop on the Mathematics and Stochastic Manufacturing Systems, Williamsburg, VA, June 17-21, 1996. G. Yin and Q. Zhang (eds.). Lectures in Applied Mathematics. American Mathematical Society, Providence, RI.
    • (1997) Lectures in Applied Mathematics
    • Presman, E.1    Sethi, S.P.2    Suo, W.3
  • 16
    • 0026836253 scopus 로고
    • A comparison of order release strategies in production control systems
    • RODERICK, L. M., D. T. PHILLIPS, AND G. L. HOGG. 1992. A Comparison of Order Release Strategies in Production Control Systems. Int. J. Prod. Res. 30, 3, 611-626.
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.3 , pp. 611-626
    • Roderick, L.M.1    Phillips, D.T.2    Hogg, G.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.