-
2
-
-
58049197346
-
Traffic assignment model for the city of Isfahan, Isfahan
-
Isfahan, Iran
-
AASHTIANI, H and POURZAHEDI, H (1990). Traffic assignment model for the city of Isfahan, Isfahan, Comprehensive Transportation Studies, Isfahan Traffic Organization, Isfahan, Iran.
-
(1990)
Comprehensive Transportation Studies, Isfahan Traffic Organization
-
-
AASHTIANI, H.1
POURZAHEDI, H.2
-
3
-
-
0003954826
-
Traffic signals: Capacity and timing analysis,
-
ARR123, Australian Road Research Board, Vermont South, Victoria
-
AKCELIK, R (1981). Traffic signals: capacity and timing analysis, Research Report ARR123, Australian Road Research Board, Vermont South, Victoria.
-
(1981)
Research Report
-
-
AKCELIK, R.1
-
4
-
-
0032651925
-
Measuring control delay at signalised intersection
-
CESAR, AQ and BULLOCK, D (1999). Measuring control delay at signalised intersection, Journal of Transportation Engineering, 125(4), 271-79.
-
(1999)
Journal of Transportation Engineering
, vol.125
, Issue.4
, pp. 271-279
-
-
CESAR, A.Q.1
BULLOCK, D.2
-
5
-
-
0030290928
-
Accounting for non-random arrivals in estimate of delay at signalised intersections
-
DANIEL, J, FAMBRO, DB and ROUPHAIL, NM (1996). Accounting for non-random arrivals in estimate of delay at signalised intersections, Transportation Research Record 1555, 9-16.
-
(1996)
Transportation Research Record
, vol.1555
, pp. 9-16
-
-
DANIEL, J.1
FAMBRO, D.B.2
ROUPHAIL, N.M.3
-
6
-
-
0003693579
-
-
HCM , Transportation Research Board, National Research Council, Washington DC
-
HCM (2000). Highway Capacity Manual, Transportation Research Board, National Research Council, Washington DC.
-
(2000)
Highway Capacity Manual
-
-
-
7
-
-
0021583754
-
Signalised intersection delay models: A primer for the uninitiated
-
HURDLE, VF (1984). Signalised intersection delay models: a primer for the uninitiated, Transportation Research Record 971, pp. 96-105.
-
(1984)
Transportation Research Record
, vol.971
, pp. 96-105
-
-
HURDLE, V.F.1
-
8
-
-
58049204934
-
-
ITSR (1996). Mashhad Comprehensive Transportation Studies, Special Report: Traffic assignment model for the city of Mashhad in EMME/2 software, The Institute for Transportation Studies and Research (ITSR) of Sharif University of Technology, Sharif University of Technology, Tehran, Iran.
-
ITSR (1996). Mashhad Comprehensive Transportation Studies, Special Report: Traffic assignment model for the city of Mashhad in EMME/2 software, The Institute for Transportation Studies and Research (ITSR) of Sharif University of Technology, Sharif University of Technology, Tehran, Iran.
-
-
-
-
12
-
-
0027694885
-
Overall delay, stopped delay, and stops at signalised intersections
-
OLSZEWSKI, P (1993). Overall delay, stopped delay, and stops at signalised intersections, Journal of Transportation Engineering, Vol. 119(6) 835-52.
-
(1993)
Journal of Transportation Engineering
, vol.119
, Issue.6
, pp. 835-852
-
-
OLSZEWSKI, P.1
-
13
-
-
0004018470
-
Oversaturation delay estimates with consideration of peaking
-
ROUPHAIL, NM and AKCELIK, R (1992). Oversaturation delay estimates with consideration of peaking, Transportation Research Record, 1365, 71-81.
-
(1992)
Transportation Research Record
, vol.1365
, pp. 71-81
-
-
ROUPHAIL, N.M.1
AKCELIK, R.2
-
14
-
-
0030285781
-
Estimating intersection approach delay using 1985 and 1994 Highway Capacity Manual procedures
-
STEPHEN, MB and IVAN, JN (1996). Estimating intersection approach delay using 1985 and 1994 Highway Capacity Manual procedures, Transportation Research Record 1555, 23-32.
-
(1996)
Transportation Research Record
, vol.1555
, pp. 23-32
-
-
STEPHEN, M.B.1
IVAN, J.N.2
|