메뉴 건너뛰기




Volumn 45, Issue 24, 2007, Pages 5769-5788

Minimizing and balancing setups in a serial production system

Author keywords

Bi objective optimization; Manufacturing; Metaheuristic; Sequencing; Setup

Indexed keywords

OPTIMIZATION; PROBLEM SOLVING; PRODUCTION CONTROL;

EID: 36248991867     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701636306     Document Type: Article
Times cited : (17)

References (34)
  • 2
    • 0035564269 scopus 로고    scopus 로고
    • Set-up coordination between two stages of a supply chain
    • Agnetis, A., Detti, P., Meloni, C. and Pacciarelli, D., Set-up coordination between two stages of a supply chain. Ann. Oper. Res., 2001, 107, 15-32.
    • (2001) Ann. Oper. Res , vol.107 , pp. 15-32
    • Agnetis, A.1    Detti, P.2    Meloni, C.3    Pacciarelli, D.4
  • 3
    • 0037209879 scopus 로고    scopus 로고
    • A tabu search based algorithm for minimizing the number of tool switches on a flexible machine
    • Al-Fawzan, M.A. and Al-Sultan, K.S., A tabu search based algorithm for minimizing the number of tool switches on a flexible machine. Comput. Ind. Eng., 2002, 44, 35-47.
    • (2002) Comput. Ind. Eng , vol.44 , pp. 35-47
    • Al-Fawzan, M.A.1    Al-Sultan, K.S.2
  • 4
    • 0027904995 scopus 로고
    • A sequencing problem in the weaving industry
    • Al-Haboubi, M.H. and Selim, S.Z., A sequencing problem in the weaving industry. Euro. J. Oper. Res., 1993, 66, 65-71.
    • (1993) Euro. J. Oper. Res , vol.66 , pp. 65-71
    • Al-Haboubi, M.H.1    Selim, S.Z.2
  • 5
    • 0037410252 scopus 로고    scopus 로고
    • The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
    • Allahverdi, A., The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. Euro. J. Oper. Res., 2003, 147, 373-396.
    • (2003) Euro. J. Oper. Res , vol.147 , pp. 373-396
    • Allahverdi, A.1
  • 6
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., Gupta, J.N.D. and Aldowaisan, T., A review of scheduling research involving setup considerations. Omega, 1999, 27, 219-239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 7
    • 0031997369 scopus 로고    scopus 로고
    • Guided local search with shifting bottleneck for job shop scheduling
    • Balas, E. and Vazacopoulos, A., Guided local search with shifting bottleneck for job shop scheduling. Mgmt Sci., 1998, 44, 262-275.
    • (1998) Mgmt Sci , vol.44 , pp. 262-275
    • Balas, E.1    Vazacopoulos, A.2
  • 8
    • 0031139162 scopus 로고    scopus 로고
    • Combinatorial optimization models for production scheduling in automated manufacturing systems
    • Crama, Y., Combinatorial optimization models for production scheduling in automated manufacturing systems. Euro. J. Oper. Res., 1997, 99, 136-153.
    • (1997) Euro. J. Oper. Res , vol.99 , pp. 136-153
    • Crama, Y.1
  • 11
    • 34548685672 scopus 로고    scopus 로고
    • Local search algorithms for the minimum cardinality dominating trail set of a graph
    • Detti, P., Meloni, C., and Pranzo, M., Local search algorithms for the minimum cardinality dominating trail set of a graph. Ann. Oper. Res., 2007, 156, 5-24.
    • (2007) Ann. Oper. Res , vol.156 , pp. 5-24
    • Detti, P.1    Meloni, C.2    Pranzo, M.3
  • 12
    • 34548688169 scopus 로고    scopus 로고
    • Simple bounds for the minimum cardinality dominating trail set problem
    • Technical Report RT-DIA-87-2004, Dipartimento di Informatica e Automazione, Universita Roma Tre, Roma, Italy
    • Detti, P., Meloni, C. and Pranzo, M., Simple bounds for the minimum cardinality dominating trail set problem. Technical Report RT-DIA-87-2004, Dipartimento di Informatica e Automazione, Universita Roma Tre, Roma, Italy, 2004.
    • (2004)
    • Detti, P.1    Meloni, C.2    Pranzo, M.3
  • 14
    • 13544272573 scopus 로고    scopus 로고
    • Two-machine shop scheduling: Compromise between flexibility and makespan value
    • Esswein, C., Billaut, J.C. and Strusevich, V.A., Two-machine shop scheduling: compromise between flexibility and makespan value. Euro. J. Oper. Res., 2005, 167, 796-809.
    • (2005) Euro. J. Oper. Res , vol.167 , pp. 796-809
    • Esswein, C.1    Billaut, J.C.2    Strusevich, V.A.3
  • 15
    • 35248897594 scopus 로고    scopus 로고
    • The Measure of Pareto Optima: Applications to Multi-objective Metaheuristics
    • Berlin: Springer
    • Fleischer, M., 2003 The Measure of Pareto Optima: Applications to Multi-objective Metaheuristics (Lecture Notes in Computer Science), pp. 519-533 (Berlin: Springer).
    • (2003) Lecture Notes in Computer Science , pp. 519-533
    • Fleischer, M.1
  • 17
    • 0034818087 scopus 로고    scopus 로고
    • Variable neighborhood search: Principles and applications
    • Hansen, P. and Mladenović, N., Variable neighborhood search: principles and applications. Euro. J. Oper. Res., 2001, 130, 449-467.
    • (2001) Euro. J. Oper. Res , vol.130 , pp. 449-467
    • Hansen, P.1    Mladenović, N.2
  • 18
    • 0001228654 scopus 로고
    • On Eulerian and Hamiltonian graphs and line-graphs
    • Harary, F. and Nash-Williams, C.St.J.A., On Eulerian and Hamiltonian graphs and line-graphs. Can. Math. Bulletin., 1965, 8, 701-709.
    • (1965) Can. Math. Bulletin , vol.8 , pp. 701-709
    • Harary, F.1    Nash-Williams, C.S.J.A.2
  • 19
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimizing tool switches when scheduling part types on a flexible machine
    • Hertz, A., Laporte, G., Mittaz, M. and Stecke, K., Heuristics for minimizing tool switches when scheduling part types on a flexible machine. HE Trans., 1998, 30, 689-694.
    • (1998) HE Trans , vol.30 , pp. 689-694
    • Hertz, A.1    Laporte, G.2    Mittaz, M.3    Stecke, K.4
  • 22
    • 0005386585 scopus 로고    scopus 로고
    • Iterated local Search
    • edited by F. Glover and G. Kochenberger, pp, Kluwer: Dordrecht
    • Lourenço, H.R.D., Martin, O. and Stützle, T., Iterated local Search. In Handbook of Metaheuristics, edited by F. Glover and G. Kochenberger, pp. 321-353, 2002 (Kluwer: Dordrecht).
    • (2002) Handbook of Metaheuristics , pp. 321-353
    • Lourenço, H.R.D.1    Martin, O.2    Stützle, T.3
  • 24
    • 27844495113 scopus 로고    scopus 로고
    • Coordination of set-ups between two stages of a supply chain using multiobjective genetic algorithms
    • Mansouri, S.A., Coordination of set-ups between two stages of a supply chain using multiobjective genetic algorithms. Inter. J. Prod. Res., 2005, 43, 3163-3180.
    • (2005) Inter. J. Prod. Res , vol.43 , pp. 3163-3180
    • Mansouri, S.A.1
  • 25
    • 33749359631 scopus 로고    scopus 로고
    • Setup coordination between two stages of a production system: A multi-objective evolutionary approach
    • Meloni, C., Naso, D. and Turchiano, B., 2005. Setup coordination between two stages of a production system: a multi-objective evolutionary approach. Ann. Oper. Res., 2007, 147, 175-198.
    • (2005) Ann. Oper. Res , vol.2007 , Issue.147 , pp. 175-198
    • Meloni, C.1    Naso, D.2    Turchiano, B.3
  • 26
    • 27144541535 scopus 로고    scopus 로고
    • A study of stochastic local search algorithms for the biobjective QAP with correlated flow matrices
    • Paquete, L. and Stützle, T., A study of stochastic local search algorithms for the biobjective QAP with correlated flow matrices. Euro. J. Oper. Res., 2006, 169, 943-959.
    • (2006) Euro. J. Oper. Res , vol.169 , pp. 943-959
    • Paquete, L.1    Stützle, T.2
  • 27
    • 0032189491 scopus 로고    scopus 로고
    • Heuristics for the flow line problem with setup costs
    • Rios-Mercado, R.Z. and Bard, J.F., Heuristics for the flow line problem with setup costs. Euro. J. Oper. Res., 1998, 110, 76-98.
    • (1998) Euro. J. Oper. Res , vol.110 , pp. 76-98
    • Rios-Mercado, R.Z.1    Bard, J.F.2
  • 29
    • 0346093873 scopus 로고    scopus 로고
    • A hybrid approach to the single line scheduling problem with multiple products and sequence-dependent time
    • Spina, R., Galantucci, L.M. and Dassisti, M., A hybrid approach to the single line scheduling problem with multiple products and sequence-dependent time. Comput. Ind. Eng., 2003, 45, 573-583.
    • (2003) Comput. Ind. Eng , vol.45 , pp. 573-583
    • Spina, R.1    Galantucci, L.M.2    Dassisti, M.3
  • 31
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine. Part I: Minimization of the number of tool switches
    • Tang, C.S. and Denardo, E.V., Models arising from a flexible manufacturing machine. Part I: Minimization of the number of tool switches. Oper. Res., 1988, 36, 767-777.
    • (1988) Oper. Res , vol.36 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 32
    • 36248974194 scopus 로고    scopus 로고
    • Parts loading scheduling in a flexible forging machine using an advanced genetic algorithm
    • Tsujimura, Y. and Gen, M., Parts loading scheduling in a flexible forging machine using an advanced genetic algorithm. J. Intell. Manufi., 1999, 12, 413-420.
    • (1999) J. Intell. Manufi , vol.12 , pp. 413-420
    • Tsujimura, Y.1    Gen, M.2
  • 34
    • 0031139978 scopus 로고    scopus 로고
    • MIP modelling of changeovers in production planning and scheduling problems
    • Wolsey, L.A., MIP modelling of changeovers in production planning and scheduling problems. Euro. J. Oper. Res., 1997, 99, 154-165.
    • (1997) Euro. J. Oper. Res , vol.99 , pp. 154-165
    • Wolsey, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.