메뉴 건너뛰기




Volumn , Issue , 2008, Pages 726-731

A data enabled operation-based simulation for automotive assembly

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY MACHINES; FLOORS; MODELS; SANDWICH STRUCTURES; SYSTEMS ENGINEERING; THROUGHPUT;

EID: 58049174348     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ASC-ICSC.2008.4675455     Document Type: Conference Paper
Times cited : (8)

References (12)
  • 3
    • 1042300749 scopus 로고    scopus 로고
    • A comprehensive survey and future trend of simulation study on FMS scheduling
    • January, pp
    • F.T.S Chan and H.K. Chan, "A comprehensive survey and future trend of simulation study on FMS scheduling", Journal of Intelligent Manufacturing, vol. 15, no. 1, January, pp. 87-102, 2004.
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.1 , pp. 87-102
    • Chan, F.T.S.1    Chan, H.K.2
  • 4
    • 3042692204 scopus 로고    scopus 로고
    • Survey on the use of simulation for manufacturing system design and operation
    • February, pp
    • J. S. Smith, "Survey on the use of simulation for manufacturing system design and operation", Journal of Manufacturing Systems, vol. 22, no. 2, February, pp. 157-171, 2003.
    • (2003) Journal of Manufacturing Systems , vol.22 , Issue.2 , pp. 157-171
    • Smith, J.S.1
  • 7
    • 0033874509 scopus 로고    scopus 로고
    • Methodology for rapid identification and collection of input data in the simulation of manufacturing systems
    • June, pp
    • T. Perera and K. Liyanage, "Methodology for rapid identification and collection of input data in the simulation of manufacturing systems", Simulation Practice and Theory, vol. 7, no. 6, June, pp. 645-656, 2000.
    • (2000) Simulation Practice and Theory , vol.7 , Issue.6 , pp. 645-656
    • Perera, T.1    Liyanage, K.2
  • 8
    • 0034628949 scopus 로고    scopus 로고
    • A conceptual framework for the generation of simulation models from process plans and resource configuration
    • February, pp
    • S. H. Leey, H.B. Choy, and M. Y. Jung, "A conceptual framework for the generation of simulation models from process plans and resource configuration", International Journal of Production Research, vol. 38, no. 4, February, pp. 811-828, 2000.
    • (2000) International Journal of Production Research , vol.38 , Issue.4 , pp. 811-828
    • Leey, S.H.1    Choy, H.B.2    Jung, M.Y.3
  • 9
    • 0037905614 scopus 로고    scopus 로고
    • Component based simulation modeling from neutral component libraries
    • February, pp
    • Y. J. Son, A. T. Jones, and R. A. Wysk, "Component based simulation modeling from neutral component libraries", Computers & Industrial Engineering, vol. 45, no. 4, February, pp. 141-165, 2003.
    • (2003) Computers & Industrial Engineering , vol.45 , Issue.4 , pp. 141-165
    • Son, Y.J.1    Jones, A.T.2    Wysk, R.A.3
  • 10
    • 0035396337 scopus 로고    scopus 로고
    • Automatic simulation model generation for simulation-based, real-time shop floor control
    • March, pp
    • Y. J. Son and R. A. Wysk, "Automatic simulation model generation for simulation-based, real-time shop floor control", Computers in Industry, vol. 45, no. 3, March, pp. 291-308, 2001.
    • (2001) Computers in Industry , vol.45 , Issue.3 , pp. 291-308
    • Son, Y.J.1    Wysk, R.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.