메뉴 건너뛰기




Volumn , Issue , 2007, Pages 121-127

Large-scale production scheduling with the fundamental tree algorithm - model, case study and comparisons

Author keywords

[No Author keywords available]

Indexed keywords

COPPER; COPPER MINES; DYNAMIC PROGRAMMING; INTEGER PROGRAMMING; LINEARIZATION; MATHEMATICAL PROGRAMMING; MINES; MINING; OPEN PIT MINING; ORE DEPOSITS; ORES; PLANNING; PLASMA WAVES; PRODUCTION ENGINEERING; RISK ANALYSIS; RISK MANAGEMENT; SCHEDULING; SCHEDULING ALGORITHMS; TREES (MATHEMATICS);

EID: 58049180513     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (10)

References (21)
  • 3
    • 0001391104 scopus 로고
    • Decomposition principle for linear programs
    • Dantzig, G B and Wolfe, P, 1960. Decomposition principle for linear programs, Oper Res, 8(1): 101-111.
    • (1960) Oper Res , vol.8 , Issue.1 , pp. 101-111
    • Dantzig, G.B.1    Wolfe, P.2
  • 4
    • 58049162745 scopus 로고    scopus 로고
    • Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
    • Dimitrakopoulos, R, in press. Applied risk analysis for ore reserves and strategic mine planning: Stochastic simulation and optimisation, 350 p (Springer - SME: Dordrecht).
  • 5
    • 35548992349 scopus 로고    scopus 로고
    • Uncertainty based production scheduling in open pit mining
    • Dimitrakopoulos, R and Ramazan, S, 2004. Uncertainty based production scheduling in open pit mining, SME Transactions, 316:106-112.
    • (2004) SME Transactions , vol.316 , pp. 106-112
    • Dimitrakopoulos, R.1    Ramazan, S.2
  • 6
    • 21644464661 scopus 로고
    • Optimal mine production scheduling evaluation of large scale mathematical programming approaches
    • Gershon, M E, 1983. Optimal mine production scheduling evaluation of large scale mathematical programming approaches, Int J Mining Engineering, 1:315-329.
    • (1983) Int J Mining Engineering , vol.1 , pp. 315-329
    • Gershon, M.E.1
  • 7
    • 33750463822 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling
    • Godoy, M and Dimitrakopoulos, R, 2004. Managing risk and waste mining in long-term production scheduling, SME Trans, 316:43-50.
    • (2004) SME Trans , vol.316 , pp. 43-50
    • Godoy, M.1    Dimitrakopoulos, R.2
  • 8
    • 0034313704 scopus 로고    scopus 로고
    • Performance analysis and best implementations of old and new algorithms for the open-pit mining problem
    • Hochbaum, D S and Chen, A, 2000. Performance analysis and best implementations of old and new algorithms for the open-pit mining problem, Oper Res, 48:894-913.
    • (2000) Oper Res , vol.48 , pp. 894-913
    • Hochbaum, D.S.1    Chen, A.2
  • 9
    • 0007113636 scopus 로고
    • PhD dissertation, University of California, Berkeley, California, p
    • Johnson, T B, 1968. Optimum open pit mine production scheduling, PhD dissertation, University of California, Berkeley, California, p 120.
    • (1968) Optimum open pit mine production scheduling , pp. 120
    • Johnson, T.B.1
  • 10
    • 58049146765 scopus 로고    scopus 로고
    • Lemieux, M, 1979. Moving cone optimizing algorithm, Computer methods for the 80s in the mineral industry (ed: A Weiss), pp 329-345 (SME - AIME).
    • Lemieux, M, 1979. Moving cone optimizing algorithm, Computer methods for the 80s in the mineral industry (ed: A Weiss), pp 329-345 (SME - AIME).
  • 14
    • 21644484543 scopus 로고    scopus 로고
    • Recent applications of operations research in open pit mining
    • Ramazan, S and Dimitrakopoulos, R, 2004. Recent applications of operations research in open pit mining, SME Transactions, 316:73-78.
    • (2004) SME Transactions , vol.316 , pp. 73-78
    • Ramazan, S.1    Dimitrakopoulos, R.2
  • 15
    • 33645605389 scopus 로고
    • Pit limit parameterization from modified 3D Lerchs- Grossmann algorithm
    • Seymour, F, 1995. Pit limit parameterization from modified 3D Lerchs- Grossmann algorithm, SME Preprint Number 95-96.
    • (1995) SME Preprint Number , pp. 95-96
    • Seymour, F.1
  • 17
    • 41849089877 scopus 로고    scopus 로고
    • Extensions to an efficient optimization model for long-term production planning at LKAB's Kiruna Mine, applications of computers and operations research in minerals industries
    • Topal, E, Kuchta, M and Newman, A, 2003. Extensions to an efficient optimization model for long-term production planning at LKAB's Kiruna Mine, applications of computers and operations research in minerals industries, in Proceedings 31st International APCOM Symposium, pp 289-293.
    • (2003) Proceedings 31st International APCOM Symposium , pp. 289-293
    • Topal, E.1    Kuchta, M.2    Newman, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.