Improving cost estimates of construction projects using phased cost factors

Author keywords

Construction costs; Cost control; Estimation; Project management

Indexed keywords

CONSTRUCTION INDUSTRY; COST ACCOUNTING; ESTIMATION; SOCIETIES AND INSTITUTIONS;

EID: 33845735085     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:1(91)     Document Type: Article
Times cited : (65)

References (21)
  • 1
    • 2242459831 scopus 로고    scopus 로고
    • Analysis of factors influencing project cost estimating practice
    • Akintoye, A. (2000). " Analysis of factors influencing project cost estimating practice.. " Constr. Manage. Econom., 18 (1), 77-89.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.1 , pp. 77-89
    • Akintoye, A.1
  • 2
    • 3242690152 scopus 로고    scopus 로고
    • A survey of current cost estimating practices in the UK
    • Akintoye, A., and Fitzgerald, E. (2000). " A survey of current cost estimating practices in the UK.. " Constr. Manage. Econom., 18 (2), 161-172.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.2 , pp. 161-172
    • Akintoye, A.1    Fitzgerald, E.2
  • 3
    • 0028735184 scopus 로고
    • Building construction detailed estimating practices in Saudi Arabia
    • Al-Harbi, K. M., Johnston, D. W., and Fayadh, H. (1994). " Building construction detailed estimating practices in Saudi Arabia.. " J. Constr. Eng. Manage., 120 (4), 774-784.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 774-784
    • Al-Harbi, K.M.1    Johnston, D.W.2    Fayadh, H.3
  • 4
    • 33845747583 scopus 로고
    • Accuracy in estimating
    • Chartered Institute of Building, London, No.27.
    • Ashworth, A., and Skitmore, M. (1982). " Accuracy in estimating.. " Occasional Paper, Chartered Institute of Building, London, No.27.
    • (1982) Occasional Paper
    • Ashworth, A.1    Skitmore, M.2
  • 6
    • 0022013369 scopus 로고
    • Control: Organisational and economic approaches
    • Eisenhardt, K. M. (1985). " Control: Organisational and economic approaches.. " Manage. Sci., 31 (2), 134-149.
    • (1985) Manage. Sci. , vol.31 , Issue.2 , pp. 134-149
    • Eisenhardt, K.M.1
  • 8
    • 0000551904 scopus 로고
    • The accuracy and monitoring of quantity surveyor's price forecasting for building work
    • Flanagan, R., and Norman, G. (1983). " The accuracy and monitoring of quantity surveyor's price forecasting for building work.. " Constr. Manage. Econom., 1 (2), 157-180.
    • (1983) Constr. Manage. Econom. , vol.1 , Issue.2 , pp. 157-180
    • Flanagan, R.1    Norman, G.2
  • 9
    • 0004594018 scopus 로고    scopus 로고
    • Comparative analysis of pre-bid forecasting of building prices based on Singapore data
    • Gunner, J., and Skitmore, M. (1999). " Comparative analysis of pre-bid forecasting of building prices based on Singapore data.. " Constr. Manage. Econom., 17 (5), 635-646.
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.5 , pp. 635-646
    • Gunner, J.1    Skitmore, M.2
  • 10
    • 0026913063 scopus 로고
    • Heavy construction estimates, with and without computers
    • Hicks, J. C. (1992). " Heavy construction estimates, with and without computers.. " J. Constr. Eng. Manage., 118 (3), 545-555.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 545-555
    • Hicks, J.C.1
  • 11
    • 0018018940 scopus 로고
    • Cost of delays in construction
    • Koehn, E., Young, R., Kuchar, J., and Seling, F. (1978). " Cost of delays in construction.. " J. Constr. Div., 104 (3), 323-331.
    • (1978) J. Constr. Div. , vol.104 , Issue.3 , pp. 323-331
    • Koehn, E.1    Young, R.2    Kuchar, J.3    Seling, F.4
  • 12
    • 0034939478 scopus 로고    scopus 로고
    • Improving the accuracy of approximate estimates of building projects
    • Ling, Y. Y., and Boo, J. H. S. (2001). " Improving the accuracy of approximate estimates of building projects.. " Build. Res. Inf., 29 (4), 312-318.
    • (2001) Build. Res. Inf. , vol.29 , Issue.4 , pp. 312-318
    • Ling, Y.Y.1    Boo, J.H.S.2
  • 13
    • 0009771673 scopus 로고
    • Experiential learning in cost estimating
    • Lowe, D., and Skitmore, M. (1994). " Experiential learning in cost estimating.. " Constr. Manage. Econom., 12 (5), 423-431.
    • (1994) Constr. Manage. Econom. , vol.12 , Issue.5 , pp. 423-431
    • Lowe, D.1    Skitmore, M.2
  • 16
    • 0001860409 scopus 로고
    • The accuracy of quantity surveyors cost estimating
    • Morrison, N. (1984). " The accuracy of quantity surveyors cost estimating.. " Constr. Manage. Econom., 2 (1), 57-75.
    • (1984) Constr. Manage. Econom. , vol.2 , Issue.1 , pp. 57-75
    • Morrison, N.1
  • 17
    • 0018519695 scopus 로고
    • A conceptual framework for the design of organizational control mechanisms
    • Ouchi, W. G. (1979). " A conceptual framework for the design of organizational control mechanisms.. " Manage. Sci., 25 (9), 833-848.
    • (1979) Manage. Sci. , vol.25 , Issue.9 , pp. 833-848
    • Ouchi, W.G.1
  • 18
    • 0026907767 scopus 로고
    • The production of accurate construction cost estimates in Saudi Arabia
    • Shash, A. A., and Al-Khaldi. (1992). " The production of accurate construction cost estimates in Saudi Arabia.. " Cost Eng., 34 (8), 15-24.
    • (1992) Cost Eng. , vol.34 , Issue.8 , pp. 15-24
    • Shash, A.A.1    Al-Khaldi2
  • 21
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • Trost, S. M., and Oberlender, G. D. (2003). " Predicting accuracy of early cost estimates using factor analysis and multivariate regression.. " J. Constr. Eng. Manage., 129 (2), 138-204.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.2 , pp. 138-204
    • Trost, S.M.1    Oberlender, G.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.