Non-unit based planning and scheduling of repetitive construction project
-
Huang R.Y., and Sun K.S. Non-unit based planning and scheduling of repetitive construction project. J Constr Eng Manage ASCE 132 6 (2006) 585-597
-
(2006)
J Constr Eng Manage ASCE
, vol.132
, Issue.6
, pp. 585-597
-
-
Huang, R.Y.1
Sun, K.S.2
-
2
-
-
80053399277
-
An optimization model for workgroup-based repetitive scheduling
-
Topping B.H.V. (Ed), Civil-Comp Press, Stirling, United Kingdom [paper 78]
-
Huang R.Y., and Sun K.S. An optimization model for workgroup-based repetitive scheduling. In: Topping B.H.V. (Ed). Proceedings of the 10th international conference on civil, structural and environmental engineering computing (2005), Civil-Comp Press, Stirling, United Kingdom [paper 78]
-
(2005)
Proceedings of the 10th international conference on civil, structural and environmental engineering computing
-
-
Huang, R.Y.1
Sun, K.S.2
-
3
-
-
0004749860
-
The application of the "Line-of-balance" technique to the construction industry
-
and 319-20
-
Khisty C.J. The application of the "Line-of-balance" technique to the construction industry. Indian Concr J 44 7 (1970) 297-300 and 319-20
-
(1970)
Indian Concr J
, vol.44
, Issue.7
, pp. 297-300
-
-
Khisty, C.J.1
-
4
-
-
0000981977
-
Planning construction of repetitive building units
-
Carr R.I., and Meyer W.L. Planning construction of repetitive building units. J Constr Div ASCE 100 CO3 (1974) 403-412
-
(1974)
J Constr Div ASCE
, vol.100
, Issue.CO3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
5
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
O'Brien J.J. VPM scheduling for high-rise buildings. J Constr Div ASCE 101 CO4 (1975) 895-905
-
(1975)
J Constr Div ASCE
, vol.101
, Issue.CO4
, pp. 895-905
-
-
O'Brien, J.J.1
-
6
-
-
0019064535
-
Construction planning - beyond the critical path
-
Birrell G.S. Construction planning - beyond the critical path. J Constr Div ASCE 106 CO3 (1980) 389-407
-
(1980)
J Constr Div ASCE
, vol.106
, Issue.CO3
, pp. 389-407
-
-
Birrell, G.S.1
-
7
-
-
0022778511
-
Line-of-balance scheduling in pavement construction
-
Arditi D., and Albulak M.Z. Line-of-balance scheduling in pavement construction. J Constr Eng Manage ASCE 112 3 (1986) 411-424
-
(1986)
J Constr Eng Manage ASCE
, vol.112
, Issue.3
, pp. 411-424
-
-
Arditi, D.1
Albulak, M.Z.2
-
8
-
-
0025598377
-
Formal development of line-of-balance technique
-
Al Sarraj Z.M. Formal development of line-of-balance technique. J Constr Eng Manage ASCE 116 4 (1990) 689-704
-
(1990)
J Constr Eng Manage ASCE
, vol.116
, Issue.4
, pp. 689-704
-
-
Al Sarraj, Z.M.1
-
9
-
-
0025447970
-
RPM: repetitive project modelling
-
Reda R.M. RPM: repetitive project modelling. J Constr Eng Manage ASCE 116 2 (1990) 316-330
-
(1990)
J Constr Eng Manage ASCE
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.M.1
-
10
-
-
0035482888
-
Algorithm for determining controlling path considering resource continuity
-
Ammar M.A., and Elbeltagi E. Algorithm for determining controlling path considering resource continuity. J Comput Civil Eng ASCE 15 4 (2001) 292-298
-
(2001)
J Comput Civil Eng ASCE
, vol.15
, Issue.4
, pp. 292-298
-
-
Ammar, M.A.1
Elbeltagi, E.2
-
11
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy T., and Wassef N. Cost optimization in projects with repetitive nonserial activities. J Constr Eng Manage ASCE 127 3 (2001) 183-191
-
(2001)
J Constr Eng Manage ASCE
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
12
-
-
0019030431
-
Construction planning for linear projects
-
Selinger S. Construction planning for linear projects. J Constr Div ASCE 106 CO2 (1980) 195-205
-
(1980)
J Constr Div ASCE
, vol.106
, Issue.CO2
, pp. 195-205
-
-
Selinger, S.1
-
13
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston D.W. Linear scheduling method for highway construction. J Constr Div ASCE 107 CO2 (1981) 247-261
-
(1981)
J Constr Div ASCE
, vol.107
, Issue.CO2
, pp. 247-261
-
-
Johnston, D.W.1
-
14
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi O., and El-Rayes K. Scheduling of repetitive projects with cost optimization. J Constr Eng Manage ASCE 119 4 (1993) 681-697
-
(1993)
J Constr Eng Manage ASCE
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
15
-
-
0027607475
-
New generation of planning structures
-
Russell A.D., and Wong W.C.M. New generation of planning structures. J Constr Eng Manage ASCE 119 2 (1993) 196-214
-
(1993)
J Constr Eng Manage ASCE
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
16
-
-
0028409229
-
Scheduling and control of linear projects
-
Eldin N.N., and Senouci A.B. Scheduling and control of linear projects. Can J Civil Eng 21 (1994) 219-230
-
(1994)
Can J Civil Eng
, vol.21
, pp. 219-230
-
-
Eldin, N.N.1
Senouci, A.B.2
-
18
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes K., and Moselhi O. Resource-driven scheduling of repetitive activities. Constr Manage Econ 16 (1998) 433-446
-
(1998)
Constr Manage Econ
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
19
-
-
0023984188
-
Extensions to linear scheduling optimization
-
Russell A.D., and Caselton W.F. Extensions to linear scheduling optimization. J Constr Eng Manage ASCE 114 1 (1988) 36-52
-
(1988)
J Constr Eng Manage ASCE
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
20
-
-
0000674566
-
Scheduling projects with repeating activities
-
Harris R.B., and Ioannou P.G. Scheduling projects with repeating activities. J Constr Eng Manage ASCE 124 4 (1998) 269-278
-
(1998)
J Constr Eng Manage ASCE
, vol.124
, Issue.4
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
21
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rayes K., and Moselhi O. Optimizing resource utilization for repetitive construction projects. J Constr Eng Manage ASCE 127 1 (2001) 18-27
-
(2001)
J Constr Eng Manage ASCE
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
22
-
-
0004436232
-
Planning repetitive construction: current practices
-
Lutz J.D., and Hijazi A. Planning repetitive construction: current practices. J Constr Manage Econ 11 (1993) 99-110
-
(1993)
J Constr Manage Econ
, vol.11
, pp. 99-110
-
-
Lutz, J.D.1
Hijazi, A.2
-
24
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean J.C. Genetic algorithms and random keys for sequencing and optimization. ORSA J Comput 6 2 (1994) 154-160
-
(1994)
ORSA J Comput
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
25
-
-
0029207545
-
An application of genetic algorithms for flow shop problems
-
Chen C.L., Vempati V.S., and Aljaber N. An application of genetic algorithms for flow shop problems. Eur J Oper Res 80 (1995) 389-396
-
(1995)
Eur J Oper Res
, vol.80
, pp. 389-396
-
-
Chen, C.L.1
Vempati, V.S.2
Aljaber, N.3
-
26
-
-
0004374576
-
time-cost tradeoff model with resource consideration using genetic algorithm
-
Chua D.K.H., Can W.T., and Govinan K.A. time-cost tradeoff model with resource consideration using genetic algorithm. Civil Eng Syst 14 (1997) 291-311
-
(1997)
Civil Eng Syst
, vol.14
, pp. 291-311
-
-
Chua, D.K.H.1
Can, W.T.2
Govinan, K.A.3
-
27
-
-
0029224965
-
A genetic algorithm for flowshop sequencing
-
Reeves C.R. A genetic algorithm for flowshop sequencing. Comput Oper Res 22 1 (1995) 5-13
-
(1995)
Comput Oper Res
, vol.22
, Issue.1
, pp. 5-13
-
-
Reeves, C.R.1
-
28
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost tradeoff problems
-
Feng C.W., Liu L., and Burns S.A. Using genetic algorithms to solve construction time-cost tradeoff problems. J Constr Eng Manage ASCE 11 3 (1997) 184-189
-
(1997)
J Constr Eng Manage ASCE
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
29
-
-
0035391119
-
Optimal repetitive scheduling model with shareable resource constraint
-
Leu S.S., and Hwang S.T. Optimal repetitive scheduling model with shareable resource constraint. J Constr Eng Manage ASCE 127 4 (2001) 270-280
-
(2001)
J Constr Eng Manage ASCE
, vol.127
, Issue.4
, pp. 270-280
-
-
Leu, S.S.1
Hwang, S.T.2
-
30
-
-
12144266471
-
A heuristic to maximize the net present value for resource-constrained project-scheduling problems
-
Abbasi G.Y., and Arabiat Y.A. A heuristic to maximize the net present value for resource-constrained project-scheduling problems. Project Manage J 32 2 (2001) 17-24
-
(2001)
Project Manage J
, vol.32
, Issue.2
, pp. 17-24
-
-
Abbasi, G.Y.1
Arabiat, Y.A.2
-
31
-
-
0347410241
-
Net-present-value cost-time tradeoff
-
Sunde L., and Lichtenberg S. Net-present-value cost-time tradeoff. Int J Project Manage 13 1 (1995) 45-49
-
(1995)
Int J Project Manage
, vol.13
, Issue.1
, pp. 45-49
-
-
Sunde, L.1
Lichtenberg, S.2
-
32
-
-
0030784381
-
Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows
-
Etgar R., Shtub A., and LeBlanc L.J. Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows. Eur J Oper Res 96 1 (1996) 90-96
-
(1996)
Eur J Oper Res
, vol.96
, Issue.1
, pp. 90-96
-
-
Etgar, R.1
Shtub, A.2
LeBlanc, L.J.3
-
33
-
-
85009511502
-
-
Sun KS. Scheduling and optimization of workgroup-based repetitive projects, Doctoral dissertation. Taiwan: National Central University; 2005.
-
Sun KS. Scheduling and optimization of workgroup-based repetitive projects, Doctoral dissertation. Taiwan: National Central University; 2005.
-
-
-
-
34
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
Harmelink D.J., and Rowings J.E. Linear scheduling model: Development of controlling activity path. J Constr Eng Manage ASCE 124 4 (1998) 263-268
-
(1998)
J Constr Eng Manage ASCE
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
|