메뉴 건너뛰기




Volumn 40, Issue 3, 2009, Pages 212-228

A GA optimization model for workgroup-based repetitive scheduling (WoRSM)

Author keywords

Genetic algorithm; Optimization; Workgroup based repetitive scheduling

Indexed keywords

CONSTRUCTION INDUSTRY; GENETIC ALGORITHMS; OPTIMIZATION;

EID: 57649158649     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.advengsoft.2008.01.010     Document Type: Article
Times cited : (19)

References (34)
  • 1
    • 33646741580 scopus 로고    scopus 로고
    • Non-unit based planning and scheduling of repetitive construction project
    • Huang R.Y., and Sun K.S. Non-unit based planning and scheduling of repetitive construction project. J Constr Eng Manage ASCE 132 6 (2006) 585-597
    • (2006) J Constr Eng Manage ASCE , vol.132 , Issue.6 , pp. 585-597
    • Huang, R.Y.1    Sun, K.S.2
  • 3
    • 0004749860 scopus 로고
    • The application of the "Line-of-balance" technique to the construction industry
    • and 319-20
    • Khisty C.J. The application of the "Line-of-balance" technique to the construction industry. Indian Concr J 44 7 (1970) 297-300 and 319-20
    • (1970) Indian Concr J , vol.44 , Issue.7 , pp. 297-300
    • Khisty, C.J.1
  • 4
    • 0000981977 scopus 로고
    • Planning construction of repetitive building units
    • Carr R.I., and Meyer W.L. Planning construction of repetitive building units. J Constr Div ASCE 100 CO3 (1974) 403-412
    • (1974) J Constr Div ASCE , vol.100 , Issue.CO3 , pp. 403-412
    • Carr, R.I.1    Meyer, W.L.2
  • 5
    • 0016643558 scopus 로고
    • VPM scheduling for high-rise buildings
    • O'Brien J.J. VPM scheduling for high-rise buildings. J Constr Div ASCE 101 CO4 (1975) 895-905
    • (1975) J Constr Div ASCE , vol.101 , Issue.CO4 , pp. 895-905
    • O'Brien, J.J.1
  • 6
    • 0019064535 scopus 로고
    • Construction planning - beyond the critical path
    • Birrell G.S. Construction planning - beyond the critical path. J Constr Div ASCE 106 CO3 (1980) 389-407
    • (1980) J Constr Div ASCE , vol.106 , Issue.CO3 , pp. 389-407
    • Birrell, G.S.1
  • 7
    • 0022778511 scopus 로고
    • Line-of-balance scheduling in pavement construction
    • Arditi D., and Albulak M.Z. Line-of-balance scheduling in pavement construction. J Constr Eng Manage ASCE 112 3 (1986) 411-424
    • (1986) J Constr Eng Manage ASCE , vol.112 , Issue.3 , pp. 411-424
    • Arditi, D.1    Albulak, M.Z.2
  • 8
    • 0025598377 scopus 로고
    • Formal development of line-of-balance technique
    • Al Sarraj Z.M. Formal development of line-of-balance technique. J Constr Eng Manage ASCE 116 4 (1990) 689-704
    • (1990) J Constr Eng Manage ASCE , vol.116 , Issue.4 , pp. 689-704
    • Al Sarraj, Z.M.1
  • 9
    • 0025447970 scopus 로고
    • RPM: repetitive project modelling
    • Reda R.M. RPM: repetitive project modelling. J Constr Eng Manage ASCE 116 2 (1990) 316-330
    • (1990) J Constr Eng Manage ASCE , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 10
    • 0035482888 scopus 로고    scopus 로고
    • Algorithm for determining controlling path considering resource continuity
    • Ammar M.A., and Elbeltagi E. Algorithm for determining controlling path considering resource continuity. J Comput Civil Eng ASCE 15 4 (2001) 292-298
    • (2001) J Comput Civil Eng ASCE , vol.15 , Issue.4 , pp. 292-298
    • Ammar, M.A.1    Elbeltagi, E.2
  • 11
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive nonserial activities
    • Hegazy T., and Wassef N. Cost optimization in projects with repetitive nonserial activities. J Constr Eng Manage ASCE 127 3 (2001) 183-191
    • (2001) J Constr Eng Manage ASCE , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1    Wassef, N.2
  • 12
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • Selinger S. Construction planning for linear projects. J Constr Div ASCE 106 CO2 (1980) 195-205
    • (1980) J Constr Div ASCE , vol.106 , Issue.CO2 , pp. 195-205
    • Selinger, S.1
  • 13
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston D.W. Linear scheduling method for highway construction. J Constr Div ASCE 107 CO2 (1981) 247-261
    • (1981) J Constr Div ASCE , vol.107 , Issue.CO2 , pp. 247-261
    • Johnston, D.W.1
  • 14
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • Moselhi O., and El-Rayes K. Scheduling of repetitive projects with cost optimization. J Constr Eng Manage ASCE 119 4 (1993) 681-697
    • (1993) J Constr Eng Manage ASCE , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 15
    • 0027607475 scopus 로고
    • New generation of planning structures
    • Russell A.D., and Wong W.C.M. New generation of planning structures. J Constr Eng Manage ASCE 119 2 (1993) 196-214
    • (1993) J Constr Eng Manage ASCE , vol.119 , Issue.2 , pp. 196-214
    • Russell, A.D.1    Wong, W.C.M.2
  • 16
    • 0028409229 scopus 로고
    • Scheduling and control of linear projects
    • Eldin N.N., and Senouci A.B. Scheduling and control of linear projects. Can J Civil Eng 21 (1994) 219-230
    • (1994) Can J Civil Eng , vol.21 , pp. 219-230
    • Eldin, N.N.1    Senouci, A.B.2
  • 18
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities
    • El-Rayes K., and Moselhi O. Resource-driven scheduling of repetitive activities. Constr Manage Econ 16 (1998) 433-446
    • (1998) Constr Manage Econ , vol.16 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 19
    • 0023984188 scopus 로고
    • Extensions to linear scheduling optimization
    • Russell A.D., and Caselton W.F. Extensions to linear scheduling optimization. J Constr Eng Manage ASCE 114 1 (1988) 36-52
    • (1988) J Constr Eng Manage ASCE , vol.114 , Issue.1 , pp. 36-52
    • Russell, A.D.1    Caselton, W.F.2
  • 20
    • 0000674566 scopus 로고    scopus 로고
    • Scheduling projects with repeating activities
    • Harris R.B., and Ioannou P.G. Scheduling projects with repeating activities. J Constr Eng Manage ASCE 124 4 (1998) 269-278
    • (1998) J Constr Eng Manage ASCE , vol.124 , Issue.4 , pp. 269-278
    • Harris, R.B.1    Ioannou, P.G.2
  • 21
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • El-Rayes K., and Moselhi O. Optimizing resource utilization for repetitive construction projects. J Constr Eng Manage ASCE 127 1 (2001) 18-27
    • (2001) J Constr Eng Manage ASCE , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 22
    • 0004436232 scopus 로고
    • Planning repetitive construction: current practices
    • Lutz J.D., and Hijazi A. Planning repetitive construction: current practices. J Constr Manage Econ 11 (1993) 99-110
    • (1993) J Constr Manage Econ , vol.11 , pp. 99-110
    • Lutz, J.D.1    Hijazi, A.2
  • 24
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Bean J.C. Genetic algorithms and random keys for sequencing and optimization. ORSA J Comput 6 2 (1994) 154-160
    • (1994) ORSA J Comput , vol.6 , Issue.2 , pp. 154-160
    • Bean, J.C.1
  • 25
    • 0029207545 scopus 로고
    • An application of genetic algorithms for flow shop problems
    • Chen C.L., Vempati V.S., and Aljaber N. An application of genetic algorithms for flow shop problems. Eur J Oper Res 80 (1995) 389-396
    • (1995) Eur J Oper Res , vol.80 , pp. 389-396
    • Chen, C.L.1    Vempati, V.S.2    Aljaber, N.3
  • 26
    • 0004374576 scopus 로고    scopus 로고
    • time-cost tradeoff model with resource consideration using genetic algorithm
    • Chua D.K.H., Can W.T., and Govinan K.A. time-cost tradeoff model with resource consideration using genetic algorithm. Civil Eng Syst 14 (1997) 291-311
    • (1997) Civil Eng Syst , vol.14 , pp. 291-311
    • Chua, D.K.H.1    Can, W.T.2    Govinan, K.A.3
  • 27
    • 0029224965 scopus 로고
    • A genetic algorithm for flowshop sequencing
    • Reeves C.R. A genetic algorithm for flowshop sequencing. Comput Oper Res 22 1 (1995) 5-13
    • (1995) Comput Oper Res , vol.22 , Issue.1 , pp. 5-13
    • Reeves, C.R.1
  • 28
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost tradeoff problems
    • Feng C.W., Liu L., and Burns S.A. Using genetic algorithms to solve construction time-cost tradeoff problems. J Constr Eng Manage ASCE 11 3 (1997) 184-189
    • (1997) J Constr Eng Manage ASCE , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.2    Burns, S.A.3
  • 29
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive scheduling model with shareable resource constraint
    • Leu S.S., and Hwang S.T. Optimal repetitive scheduling model with shareable resource constraint. J Constr Eng Manage ASCE 127 4 (2001) 270-280
    • (2001) J Constr Eng Manage ASCE , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.S.1    Hwang, S.T.2
  • 30
    • 12144266471 scopus 로고    scopus 로고
    • A heuristic to maximize the net present value for resource-constrained project-scheduling problems
    • Abbasi G.Y., and Arabiat Y.A. A heuristic to maximize the net present value for resource-constrained project-scheduling problems. Project Manage J 32 2 (2001) 17-24
    • (2001) Project Manage J , vol.32 , Issue.2 , pp. 17-24
    • Abbasi, G.Y.1    Arabiat, Y.A.2
  • 31
    • 0347410241 scopus 로고
    • Net-present-value cost-time tradeoff
    • Sunde L., and Lichtenberg S. Net-present-value cost-time tradeoff. Int J Project Manage 13 1 (1995) 45-49
    • (1995) Int J Project Manage , vol.13 , Issue.1 , pp. 45-49
    • Sunde, L.1    Lichtenberg, S.2
  • 32
    • 0030784381 scopus 로고    scopus 로고
    • Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows
    • Etgar R., Shtub A., and LeBlanc L.J. Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows. Eur J Oper Res 96 1 (1996) 90-96
    • (1996) Eur J Oper Res , vol.96 , Issue.1 , pp. 90-96
    • Etgar, R.1    Shtub, A.2    LeBlanc, L.J.3
  • 33
    • 85009511502 scopus 로고    scopus 로고
    • Sun KS. Scheduling and optimization of workgroup-based repetitive projects, Doctoral dissertation. Taiwan: National Central University; 2005.
    • Sun KS. Scheduling and optimization of workgroup-based repetitive projects, Doctoral dissertation. Taiwan: National Central University; 2005.
  • 34
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • Harmelink D.J., and Rowings J.E. Linear scheduling model: Development of controlling activity path. J Constr Eng Manage ASCE 124 4 (1998) 263-268
    • (1998) J Constr Eng Manage ASCE , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, J.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.