-
1
-
-
0037349155
-
Scheduling of drilling operations in printed circuit board factory
-
J.C. Hsieh, P.C. Chang, and L.C. Hsu, "Scheduling of drilling operations in printed circuit board factory," Computers and Industrial Engineering, vol. 44, no. 3, pp. 461-473, 2003.
-
(2003)
Computers and Industrial Engineering
, vol.44
, Issue.3
, pp. 461-473
-
-
Hsieh, J.C.1
Chang, P.C.2
Hsu, L.C.3
-
2
-
-
0036609211
-
Unrelated parallel machine scheduling with setup times using simulated annealing
-
D.W. Kim, K.H. Kim, W. Jang, and F.F. Chen, "Unrelated parallel machine scheduling with setup times using simulated annealing," Robotics and Computer Integrated Manufacturing, vol. 18, pp. 223-231, 2002.
-
(2002)
Robotics and Computer Integrated Manufacturing
, vol.18
, pp. 223-231
-
-
Kim, D.W.1
Kim, K.H.2
Jang, W.3
Chen, F.F.4
-
3
-
-
33744517681
-
-
C. Silva, and J.M. Magalhaes, 'Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry, Computers and Industrial Engineering, 50, pp. 76-89, 2006.
-
C. Silva, and J.M. Magalhaes, 'Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry," Computers and Industrial Engineering, vol. 50, pp. 76-89, 2006.
-
-
-
-
4
-
-
38149147585
-
Unrelated parallel machine scheduling using local search
-
C.A. Glass, C.N. Potts, and P. Shade, "Unrelated parallel machine scheduling using local search," Mathematical and Computer Modelling, vol. 20, no. 2, pp. 41-52, 1994.
-
(1994)
Mathematical and Computer Modelling
, vol.20
, Issue.2
, pp. 41-52
-
-
Glass, C.A.1
Potts, C.N.2
Shade, P.3
-
5
-
-
0030295335
-
A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search
-
N. Piersma, and W. van Dijk, "A local search heuristic for unrelated parallel machine scheduling with efficient neighborhood search," Mathematical and Computer Modelling, vol. 24, no. 9, pp. 11-19, 1996.
-
(1996)
Mathematical and Computer Modelling
, vol.24
, Issue.9
, pp. 11-19
-
-
Piersma, N.1
van Dijk, W.2
-
6
-
-
13444278719
-
Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach
-
M. Ghirardi and C.N. Potts, "Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach," European Journal of Operational Research, vol. 165, pp. 457-467, 2005.
-
(2005)
European Journal of Operational Research
, vol.165
, pp. 457-467
-
-
Ghirardi, M.1
Potts, C.N.2
-
7
-
-
54949125330
-
A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times
-
M. Helal, G. Rabadi, and A. Al-Salem, "A tabu search algorithm to minimize the makespan for the unrelated parallel machines scheduling problem with setup times," International Journal of Operations Research, vol. 3, pp. 182-192, 2006.
-
(2006)
International Journal of Operations Research
, vol.3
, pp. 182-192
-
-
Helal, M.1
Rabadi, G.2
Al-Salem, A.3
-
8
-
-
0035906316
-
Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
-
M.X. Weng, J. Lu, and H. Ren, "Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective," International Journal of Production Economics, vol. 70, pp. 215-226, 2001.
-
(2001)
International Journal of Production Economics
, vol.70
, pp. 215-226
-
-
Weng, M.X.1
Lu, J.2
Ren, H.3
-
9
-
-
0002214019
-
Scheduling independent jobs on uniform parallel machines to minimize tardiness criteria
-
A. Guinet, "Scheduling independent jobs on uniform parallel machines to minimize tardiness criteria," Journal of Intelligent Manufacturing, vol. 6, pp. 95-103, 1995.
-
(1995)
Journal of Intelligent Manufacturing
, vol.6
, pp. 95-103
-
-
Guinet, A.1
-
10
-
-
0031120267
-
Evaluating scheduling heuristics for nonidentical parallel processors
-
S.U. Randhawa and C.H. Kuo, "Evaluating scheduling heuristics for nonidentical parallel processors," International Journal of Production Research, vol. 35, pp. 969-981, 1997.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 969-981
-
-
Randhawa, S.U.1
Kuo, C.H.2
-
11
-
-
0037328729
-
Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective
-
D.W. Kim, D.G. Na, and F.F. Chen, "Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective," Robotics and Computer Integrated Manufacturing, vol. 19, pp. 173-181, 2003.
-
(2003)
Robotics and Computer Integrated Manufacturing
, vol.19
, pp. 173-181
-
-
Kim, D.W.1
Na, D.G.2
Chen, F.F.3
-
12
-
-
0042311378
-
Scheduling unrelated parallel machines to minimize total weighted tardiness
-
C.F. Liaw, Y.K. Lin, C.Y. Cheng, and M. Chen, "Scheduling unrelated parallel machines to minimize total weighted tardiness," Computers and Operations Research, vol. 30, pp. 1777-1789, 2003.
-
(2003)
Computers and Operations Research
, vol.30
, pp. 1777-1789
-
-
Liaw, C.F.1
Lin, Y.K.2
Cheng, C.Y.3
Chen, M.4
-
13
-
-
24144456258
-
Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints
-
J.F. Chen and T.H. Wu, "Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints," Omega, vol. 34, no. 1, pp. 81-89, 2006.
-
(2006)
Omega
, vol.34
, Issue.1
, pp. 81-89
-
-
Chen, J.F.1
Wu, T.H.2
-
14
-
-
34047130624
-
Scheduling unrelated parallel machines with sequence-dependent setups
-
R. Logendran, B. McDonell, and B. Smucker, "Scheduling unrelated parallel machines with sequence-dependent setups," Computers and Operations Research, vol. 34, pp. 3420-3438, 2007.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 3420-3438
-
-
Logendran, R.1
McDonell, B.2
Smucker, B.3
-
15
-
-
0029343603
-
Minimizing the number of tardy jobs for mparallel machines
-
J.C. Ho and Y.L. Chang, "Minimizing the number of tardy jobs for mparallel machines," European Journal of Operation Research, vol. 84, pp. 343-55, 1995.
-
(1995)
European Journal of Operation Research
, vol.84
, pp. 343-355
-
-
Ho, J.C.1
Chang, Y.L.2
-
16
-
-
4344704194
-
Minimizing the weighted number of tardy jobs on parallel processors
-
R. M'Hallah and R.L. Bulfin, "Minimizing the weighted number of tardy jobs on parallel processors," European Journal of Operational Research, vol. 160, no. 2, pp. 471-484, 2005.
-
(2005)
European Journal of Operational Research
, vol.160
, Issue.2
, pp. 471-484
-
-
M'Hallah, R.1
Bulfin, R.L.2
-
17
-
-
0014571702
-
A functional equation and its application to resource allocation and sequencing problems
-
E.L. Lawler and J.M. Moore, "A functional equation and its application to resource allocation and sequencing problems," Management Science, vol. 16, pp. 77-84, 1969.
-
(1969)
Management Science
, vol.16
, pp. 77-84
-
-
Lawler, E.L.1
Moore, J.M.2
-
18
-
-
0005386585
-
Iterated Local Search
-
F. Glover, G. A. Kochenberger eds, Kluwer Academic Publishers, Boston
-
H.R. Lourenco, O.C. Martin, and T. Stutzle, Iterated Local Search, in Handbook of Metaheuristics, F. Glover, G. A. Kochenberger (eds), Kluwer Academic Publishers, Boston, 2003, pp. 321-353.
-
(2003)
Handbook of Metaheuristics
, pp. 321-353
-
-
Lourenco, H.R.1
Martin, O.C.2
Stutzle, T.3
-
19
-
-
0000411214
-
Tabu search, part I
-
F. Glover, "Tabu search, part I," ORSA Journal on Computing, vol. 1, pp. 190-206, 1989.
-
(1989)
ORSA Journal on Computing
, vol.1
, pp. 190-206
-
-
Glover, F.1
|