메뉴 건너뛰기




Volumn 12, Issue 4, 2003, Pages 445-463

Diagnosing order planning performance at a navy maintenance and repair organization, using logistic regression

Author keywords

Due date performance; Logistic regression; Order planning; Performance feedback; Theory driven empirical research

Indexed keywords


EID: 5644295866     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2003.tb00214.x     Document Type: Article
Times cited : (15)

References (33)
  • 1
    • 0027627910 scopus 로고
    • Due Date Assignment Procedures with Dynamically Updated Coefficients for Multi-Level Assembly Job Shops
    • ADAM, N. R., J. W. M. BERTRAND, D. C. MOREHEAD, AND J. SURKIS (1993), "Due Date Assignment Procedures with Dynamically Updated Coefficients for Multi-Level Assembly Job Shops," European Journal of Operational Research, 68, 2, 212-227.
    • (1993) European Journal of Operational Research , vol.68 , Issue.2 , pp. 212-227
    • Adam, N.R.1    Bertrand, J.W.M.2    Morehead, D.C.3    Surkis, J.4
  • 2
    • 0023418695 scopus 로고
    • Priority Assignment Procedures in Multi-Level Assembly Shops
    • ADAM, N. R., J. W. M. BERTRAND, AND J. SURKIS (1987), "Priority Assignment Procedures in Multi-Level Assembly Shops," IIE Transactions, 19, 3, 317-328.
    • (1987) IIE Transactions , vol.19 , Issue.3 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.W.M.2    Surkis, J.3
  • 4
    • 0021496929 scopus 로고
    • Sequencing Rules and Due-Date Assignments in a Job Shop
    • BAKER, K. R. (1984), "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, 30, 9, 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 5
    • 0020783525 scopus 로고
    • The Effect of Workload Dependent Due Dates on Job Shop Performance
    • BERTRAND, J. W. M. (1983), "The Effect of Workload Dependent Due Dates on Job Shop Performance," Management Science, 29, 7, 799-816.
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 6
  • 10
    • 0000538802 scopus 로고
    • Job Shop Lead Time Requirements under Conditions of Controlled Delivery Performance
    • ENNS, S. T. (1994), "Job Shop Lead Time Requirements Under Conditions of Controlled Delivery Performance," European Journal of Operational Research, 77, 3, 429-439.
    • (1994) European Journal of Operational Research , vol.77 , Issue.3 , pp. 429-439
    • Enns, S.T.1
  • 11
  • 12
    • 0024680497 scopus 로고
    • Due Date Assignment in a Multi-Stage Job Shop
    • FRY, T. D., P. R. PHILIPOOM, AND R. E. MARKLAND (1989), "Due Date Assignment in a Multi-Stage Job Shop," IIE Transactions, 21, 2, 153-161.
    • (1989) IIE Transactions , vol.21 , Issue.2 , pp. 153-161
    • Fry, T.D.1    Philipoom, P.R.2    Markland, R.E.3
  • 15
    • 0019059332 scopus 로고
    • Diagnostic Analysis of a Production and Distribution System
    • HAX, A. C., N. MAJLUF, AND M. PENDROCK (1980), "Diagnostic Analysis of a Production and Distribution System," Management Science, 26, 9, 871-889.
    • (1980) Management Science , vol.26 , Issue.9 , pp. 871-889
    • Hax, A.C.1    Majluf, N.2    Pendrock, M.3
  • 17
    • 0012298197 scopus 로고
    • Priority Dispatching with Operation Due Dates in a Job Shop
    • KANET, J. C. AND J. C. HAYYA (1982), "Priority Dispatching With Operation Due Dates in a Job Shop." Journal of Operations Management, 2, 3, 167-175.
    • (1982) Journal of Operations Management , vol.2 , Issue.3 , pp. 167-175
    • Kanet, J.C.1    Hayya, J.C.2
  • 20
    • 0001274658 scopus 로고
    • Multiple-Factor Rules for Sequencing with Assembly Constraints
    • MAXWELL, W. L. AND M. MEHRA (1968), "Multiple-Factor Rules for Sequencing With Assembly Constraints." Naval Research Logistics Quarterly, 15, 2, 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , Issue.2 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 21
    • 0345460675 scopus 로고    scopus 로고
    • The Impact of Enterprise Information Technology Adoption in Operational Performance: An Empirical Investigation
    • MCAFEE, A. (2002), "The Impact of Enterprise Information Technology Adoption in Operational Performance: An Empirical Investigation," Production and Operations Management, 11, 1, 33-53.
    • (2002) Production and Operations Management , vol.11 , Issue.1 , pp. 33-53
    • McAfee, A.1
  • 22
    • 0027146758 scopus 로고
    • Addressing the Gap in Scheduling Research: A Review of Optimization and Heuristic Models in Production Scheduling
    • MCCARTHY, B. L. AND J. LIU (1993), "Addressing the Gap in Scheduling Research: A Review of Optimization and Heuristic Models in Production Scheduling," International Journal of Production Research, 31, 1, 59-79.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • McCarthy, B.L.1    Liu, J.2
  • 23
    • 0345589184 scopus 로고
    • Schedulers and Planners: What and How Can We Learn from Them
    • D. E. Brown and W. T. Scherer (eds.), Kluwer, Dordrecht
    • MCKAY, K. N., F. R. SAFAYENI, AND J. A. BUZACOTT (1995a), "Schedulers and Planners: What and How Can We Learn From Them," in Intelligent Scheduling Systems, D. E. Brown and W. T. Scherer (eds.), Kluwer, Dordrecht, 41-62.
    • (1995) Intelligent Scheduling Systems , pp. 41-62
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 24
    • 0029323355 scopus 로고
    • Common Sense' Realities of Planning and Scheduling in Printed Circuit Board Production
    • MCKAY, K. N., F. R. SAFAYENI, AND J. A. BUZACOTT (1995b), "Common Sense' Realities of Planning and Scheduling in Printed Circuit Board Production," International Journal of Production Research, 33, 6, 1587-1603.
    • (1995) International Journal of Production Research , vol.33 , Issue.6 , pp. 1587-1603
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 25
    • 0001466208 scopus 로고
    • Putting Production Decisions Where They Belong
    • MEAL, H. C. (1984), "Putting Production Decisions Where They Belong," Harvard Business Review, 62, 102-111.
    • (1984) Harvard Business Review , vol.62 , pp. 102-111
    • Meal, H.C.1
  • 26
    • 0037973200 scopus 로고    scopus 로고
    • From Buyer to Integrator: The Transformation of the Supply-Chain Manager in the Vertically Disintegrating Firm
    • PARKER, G. C. AND E. G. ANDERSON JR (2002), "From Buyer to Integrator: The Transformation of the Supply-Chain Manager in the Vertically Disintegrating Firm," Production and Operations Management, 11, 1, 75-91.
    • (2002) Production and Operations Management , vol.11 , Issue.1 , pp. 75-91
    • Parker, G.C.1    Anderson Jr., E.G.2
  • 28
    • 0026140380 scopus 로고
    • A Preliminary Investigation of Multi-Attribute Based Sequencing Rules for Assembly Shops
    • PHILIPOOM, P. R., R. S. RUSSELL, AND T. D. FRY (1991), "A Preliminary Investigation of Multi-Attribute Based Sequencing Rules for Assembly Shops," International Journal of Production Research, 29, 4, 739-753.
    • (1991) International Journal of Production Research , vol.29 , Issue.4 , pp. 739-753
    • Philipoom, P.R.1    Russell, R.S.2    Fry, T.D.3
  • 30
    • 84987044773 scopus 로고
    • Planning and Scheduling the Repair Shops of the Deutsche Lufthansa AG: A Hierarchical Approach
    • SCHNEEWEISS, C. A. AND H. SCHRÖDER (1992), "Planning and Scheduling the Repair Shops of the Deutsche Lufthansa AG: A Hierarchical Approach," Production and Operations Management, 1, 1, 22-33.
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 22-33
    • Schneeweiss, C.A.1    Schröder, H.2
  • 32
    • 16144366858 scopus 로고    scopus 로고
    • A Comparison of Loglinear Modeling and Logistic Regression in Management Research
    • TANSEY, R. M., M. WHITE, R. G. LONG, AND M. SMITH (1996), "A Comparison of Loglinear Modeling and Logistic Regression in Management Research," Journal of Management, 22, 2, 339-358.
    • (1996) Journal of Management , vol.22 , Issue.2 , pp. 339-358
    • Tansey, R.M.1    White, M.2    Long, R.G.3    Smith, M.4
  • 33
    • 0030191589 scopus 로고    scopus 로고
    • A Quantitative Field Study of the Decision Behaviour of Four Shopfloor Schedulers
    • WIERS, V. C. S. (1996), "A Quantitative Field Study of the Decision Behaviour of Four Shopfloor Schedulers," Production Planning and Control, 7, 4, 383-392.
    • (1996) Production Planning and Control , vol.7 , Issue.4 , pp. 383-392
    • Wiers, V.C.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.