-
1
-
-
0003501595
-
-
Vol., MIT Press, Cambridge, Mass.
-
Baldwin, C. Y., and Clark, K. B. (2000). Design rules: The power of modularity, Vol. 1, MIT Press, Cambridge, Mass.
-
(2000)
Design Rules: The Power of Modularity
, vol.1
-
-
Baldwin, C.Y.1
Clark, K.B.2
-
2
-
-
32144456186
-
Benefit evaluation for off-site production in construction
-
".
-
Blismas, N., Pasquire, C., and Gibb, A. (2006). " Benefit evaluation for off-site production in construction.." Constr. Manage. Econom., 24 (2), 121-130.
-
(2006)
Constr. Manage. Econom.
, vol.24
, Issue.2
, pp. 121-130
-
-
Blismas, N.1
Pasquire, C.2
Gibb, A.3
-
3
-
-
27744532171
-
Concurrent engineering approach to reducing design delivery time
-
".
-
Bogus, S. M., Molenaar, K. R., and Diekmann, J. E. (2005). " Concurrent engineering approach to reducing design delivery time.." J. Constr. Eng. Manage., 131 (11), 1179-1185.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.11
, pp. 1179-1185
-
-
Bogus, S.M.1
Molenaar, K.R.2
Diekmann, J.E.3
-
4
-
-
0004189853
-
-
Harvard Business School Press, Boston.
-
Clark, K., and Fujimoto, T. (1991). Product development performance: Strategy, organization, and management in the world auto industry, Harvard Business School Press, Boston.
-
(1991)
Product Development Performance: Strategy, Organization, and Management in the World Auto Industry
-
-
Clark, K.1
Fujimoto, T.2
-
5
-
-
0003107957
-
Stage-gate systems: A new tool for managing new products
-
Cooper, R. G. (1990). " Stage-gate systems: A new tool for managing new products.." Bus. Horiz., 33 (3), 44-54.
-
(1990)
Bus. Horiz.
, vol.33
, Issue.3
, pp. 44-54
-
-
Cooper, R.G.1
-
6
-
-
0000082527
-
Better stories and better constructs: The case for rigour and comparative logic
-
Dyer, W. G., and Wilkins, A. L. (1991). " Better stories and better constructs: The case for rigour and comparative logic.." Acad. Manage. Rev., 16 (3), 613-619.
-
(1991)
Acad. Manage. Rev.
, vol.16
, Issue.3
, pp. 613-619
-
-
Dyer, W.G.1
Wilkins, A.L.2
-
7
-
-
0019013785
-
Engineering information release prior to final design freeze
-
Eastman, R. M. (1980). " Engineering information release prior to final design freeze.." IEEE Trans. Eng. Manage., 27 (2), 37-41.
-
(1980)
IEEE Trans. Eng. Manage.
, vol.27
, Issue.2
, pp. 37-41
-
-
Eastman, R.M.1
-
8
-
-
4644346142
-
Change and customization in complex engineering domains
-
Eckert, C., Clarkson, P. J., and Zanker, W. (2004). " Change and customization in complex engineering domains.." Res. Eng. Des., 15, 1-21.
-
(2004)
Res. Eng. Des.
, vol.15
, pp. 1-21
-
-
Eckert, C.1
Clarkson, P.J.2
Zanker, W.3
-
9
-
-
0001073758
-
Building theories from case study research
-
Eisenhardt, K. M. (1989). " Building theories from case study research.." Acad. Manage. Rev., 14, 532-550.
-
(1989)
Acad. Manage. Rev.
, vol.14
, pp. 532-550
-
-
Eisenhardt, K.M.1
-
10
-
-
34047207566
-
Theory building from cases: Opportunities and challenges
-
Eisenhardt, K. M., and Graebner, M. E. (2007). " Theory building from cases: Opportunities and challenges.." Acad. Manage J., 50 (1), 25-32.
-
(2007)
Acad. Manage J.
, vol.50
, Issue.1
, pp. 25-32
-
-
Eisenhardt, K.M.1
Graebner, M.E.2
-
11
-
-
84867993298
-
No project is an island: Linking projects to history and context
-
Engwall, M. (2003). " No project is an island: Linking projects to history and context.." Res. Policy, 32 (5), 789-808.
-
(2003)
Res. Policy
, vol.32
, Issue.5
, pp. 789-808
-
-
Engwall, M.1
-
13
-
-
39849109592
-
Reflections on designing and architectural practice
-
R. J. Boland, Jr. and F. Collopy, eds., Stanford Business Books, Stanford, Calif..
-
Gehry, F. O. (2004). " Reflections on designing and architectural practice.." Managing as designing, R. J. Boland, Jr., and, F. Collopy, eds., Stanford Business Books, Stanford, Calif., 19-35.
-
(2004)
Managing As Designing
, pp. 19-35
-
-
Gehry, F.O.1
-
14
-
-
0000683034
-
Standardization and pre-assembly-Distinguishing myth from reality using case study research
-
Gibb, A. G. F. (2001). " Standardization and pre-assembly- Distinguishing myth from reality using case study research.." Constr. Manage. Econom., 6 (3), 307-315.
-
(2001)
Constr. Manage. Econom.
, vol.6
, Issue.3
, pp. 307-315
-
-
Gibb, A.G.F.1
-
15
-
-
49149112435
-
Upstream problem-solving under uncertainty and ambiguity: Evidence from airport expansion projects
-
".
-
Gil, N., Beckman, S., and Tommelein, I. (2008). " Upstream problem-solving under uncertainty and ambiguity: Evidence from airport expansion projects.." IEEE Trans. Eng. Manage., 55 (3), 508-522.
-
(2008)
IEEE Trans. Eng. Manage.
, vol.55
, Issue.3
, pp. 508-522
-
-
Gil, N.1
Beckman, S.2
Tommelein, I.3
-
16
-
-
33746656287
-
External change in large engineering design projects: The role of the client
-
".
-
Gil, N., Tommelein, I. D., and Schruben, L. W. (2006). " External change in large engineering design projects: The role of the client.." IEEE Trans. Eng. Manage., 53 (3), 426-439.
-
(2006)
IEEE Trans. Eng. Manage.
, vol.53
, Issue.3
, pp. 426-439
-
-
Gil, N.1
Tommelein, I.D.2
Schruben, L.W.3
-
17
-
-
15944418637
-
Embodying product and process flexibility to cope with challenging project deliveries
-
".
-
Gil, N., Tommelein, I. D., Stout, A., and Garrett, T. (2005). " Embodying product and process flexibility to cope with challenging project deliveries.." J. Constr. Eng. Manage., 131 (4), 439-448.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 439-448
-
-
Gil, N.1
Tommelein, I.D.2
Stout, A.3
Garrett, T.4
-
19
-
-
0035707626
-
Performance of coupled product development activities with a deadline
-
".
-
Joglekar, N. R., Yassine, A. A., Eppinger, S. D., and Whitney, D. E. (2001). " Performance of coupled product development activities with a deadline.." Manage. Sci., 47 (12), 1605-1620.
-
(2001)
Manage. Sci.
, vol.47
, Issue.12
, pp. 1605-1620
-
-
Joglekar, N.R.1
Yassine, A.A.2
Eppinger, S.D.3
Whitney, D.E.4
-
21
-
-
0031108561
-
A model-based framework to overlap product development activities
-
".
-
Krishnan, V., Eppinger, S. D., and Whitney, D. E. (1997). " A model-based framework to overlap product development activities.." Manage. Sci., 43 (4), 437-451.
-
(1997)
Manage. Sci.
, vol.43
, Issue.4
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
22
-
-
25444435990
-
Quality and change management model for large scale concurrent design and construction projects
-
".
-
Lee, S., Pea-Mora, F., and Park, M. (2005). " Quality and change management model for large scale concurrent design and construction projects.." J. Constr. Eng. Manage., 131 (8), 890-902.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.8
, pp. 890-902
-
-
Lee, S.1
Pea-Mora, F.2
Park, M.3
-
23
-
-
0032140351
-
Communication and uncertainty in concurrent engineering
-
Loch, C. H., and Terwiesch, C. (1998). " Communication and uncertainty in concurrent engineering.." Manage. Sci., 44 (8), 1032-1048.
-
(1998)
Manage. Sci.
, vol.44
, Issue.8
, pp. 1032-1048
-
-
Loch, C.H.1
Terwiesch, C.2
-
24
-
-
33646180784
-
Application of dependency structure matrix for activity sequencing in concurrent engineering projects
-
" ().
-
Maheswari, J. U., Varghese, K., and Sridharan, T. (2006). " Application of dependency structure matrix for activity sequencing in concurrent engineering projects.." J. Constr. Eng. Manage. 132 (5), 482-490.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 482-490
-
-
Maheswari, J.U.1
Varghese, K.2
Sridharan, T.3
-
25
-
-
0003784156
-
-
Sage, Thousand Oaks, Calif.
-
Miles, M. B., and Huberman, A. M. (1984). Qualitative data analysis: A sourcebook of new methods, Sage, Thousand Oaks, Calif.
-
(1984)
Qualitative Data Analysis: A Sourcebook of New Methods
-
-
Miles, M.B.1
Huberman, A.M.2
-
26
-
-
17244362051
-
Dynamic planning and control methodology for design-build fast-track construction projects
-
Pena-Mora, F., and Lee, M. (2001). " Dynamic planning and control methodology for design-build fast-track construction projects.." J. Constr. Eng. Manage., 127 (1), 1-17.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 1-17
-
-
Pena-Mora, F.1
Lee, M.2
-
27
-
-
0035510392
-
Dynamic planning for fast-tracking building construction projects
-
Pena-Mora, F., and Park, M. (2001). " Dynamic planning for fast-tracking building construction projects.." J. Constr. Eng. Manage., 127 (6), 445-456.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 445-456
-
-
Pena-Mora, F.1
Park, M.2
-
28
-
-
0027609245
-
Choice over uncertainty and ambiguity in technical problem solving
-
Schrader, S., Riggs, W. M., and Smith, R. P. (1993). " Choice over uncertainty and ambiguity in technical problem solving.." J. Eng. Technol. Manage., 10, 73-99.
-
(1993)
J. Eng. Technol. Manage.
, vol.10
, pp. 73-99
-
-
Schrader, S.1
Riggs, W.M.2
Smith, R.P.3
-
30
-
-
8344229311
-
Selectionism and learning in projects with complexity and unforeseeable uncertainty
-
Sommer, S. C., and Loch, C. H. (2004). " Selectionism and learning in projects with complexity and unforeseeable uncertainty.." Manage. Sci., 50 (10), 1334-1347.
-
(2004)
Manage. Sci.
, vol.50
, Issue.10
, pp. 1334-1347
-
-
Sommer, S.C.1
Loch, C.H.2
-
31
-
-
0037941821
-
-
Sage, Newbury Park, Calif.
-
Strauss, A. L., and Corbin, J. (1990). Basics of qualitative research: Grounded theory procedures and techniques, Sage, Newbury Park, Calif.
-
(1990)
Basics of Qualitative Research: Grounded Theory Procedures and Techniques
-
-
Strauss, A.L.1
Corbin, J.2
-
32
-
-
0032635365
-
Measuring the effectiveness of overlapping development activities
-
Terwiesch, C., and Loch, C. H. (1999). " Measuring the effectiveness of overlapping development activities.," Manage. Sci., 45 (4), 455-465.
-
(1999)
Manage. Sci.
, vol.45
, Issue.4
, pp. 455-465
-
-
Terwiesch, C.1
Loch, C.H.2
-
33
-
-
0036638665
-
Exchanging preliminary information in concurrent engineering: Alternative coordination strategies
-
".
-
Terwiesch, C., Loch, C. H., and De Meyer, A. (2002). " Exchanging preliminary information in concurrent engineering: Alternative coordination strategies.," Org. Sci., 13 (4), 402-419.
-
(2002)
Org. Sci.
, vol.13
, Issue.4
, pp. 402-419
-
-
Terwiesch, C.1
Loch, C.H.2
De Meyer, A.3
-
34
-
-
58149321832
-
The role of product architecture in the manufacturing firm
-
Ulrich, K. (1995). " The role of product architecture in the manufacturing firm.." Res. Policy, 24, 19-440.
-
(1995)
Res. Policy
, vol.24
, pp. 19-440
-
-
Ulrich, K.1
-
35
-
-
0003673547
-
-
1st Ed., Applied Social Research Methods Series, L. Bickman, ed., Vol., Sage, Beverly Hills, Calif.
-
Yin, R. K. (1984). Case study research: Design and methods, 1st Ed., Applied Social Research Methods Series, L. Bickman, ed., Vol. 5, Sage, Beverly Hills, Calif.
-
(1984)
Case Study Research: Design and Methods
, vol.5
-
-
Yin, R.K.1
|