Volumn 134, Issue 12, 2008, Pages 991-1001

Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program

Author keywords

Airports and airfields; Fast track construction; Flexibility; Infrastructure; Uncertainty principles

Indexed keywords

AIRPORT BUILDINGS; AIRPORTS; PROBLEM SOLVING; SEMANTICS; STRUCTURAL PANELS;

EID: 56349121227     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2008)134:12(991)     Document Type: Article
Times cited : (4)

References (35)
  • 2
    • 32144456186 scopus 로고    scopus 로고
    • Benefit evaluation for off-site production in construction
    • ".
    • Blismas, N., Pasquire, C., and Gibb, A. (2006). " Benefit evaluation for off-site production in construction.." Constr. Manage. Econom., 24 (2), 121-130.
    • (2006) Constr. Manage. Econom. , vol.24 , Issue.2 , pp. 121-130
    • Blismas, N.1    Pasquire, C.2    Gibb, A.3
  • 3
    • 27744532171 scopus 로고    scopus 로고
    • Concurrent engineering approach to reducing design delivery time
    • ".
    • Bogus, S. M., Molenaar, K. R., and Diekmann, J. E. (2005). " Concurrent engineering approach to reducing design delivery time.." J. Constr. Eng. Manage., 131 (11), 1179-1185.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.11 , pp. 1179-1185
    • Bogus, S.M.1    Molenaar, K.R.2    Diekmann, J.E.3
  • 5
    • 0003107957 scopus 로고
    • Stage-gate systems: A new tool for managing new products
    • Cooper, R. G. (1990). " Stage-gate systems: A new tool for managing new products.." Bus. Horiz., 33 (3), 44-54.
    • (1990) Bus. Horiz. , vol.33 , Issue.3 , pp. 44-54
    • Cooper, R.G.1
  • 6
    • 0000082527 scopus 로고
    • Better stories and better constructs: The case for rigour and comparative logic
    • Dyer, W. G., and Wilkins, A. L. (1991). " Better stories and better constructs: The case for rigour and comparative logic.." Acad. Manage. Rev., 16 (3), 613-619.
    • (1991) Acad. Manage. Rev. , vol.16 , Issue.3 , pp. 613-619
    • Dyer, W.G.1    Wilkins, A.L.2
  • 7
    • 0019013785 scopus 로고
    • Engineering information release prior to final design freeze
    • Eastman, R. M. (1980). " Engineering information release prior to final design freeze.." IEEE Trans. Eng. Manage., 27 (2), 37-41.
    • (1980) IEEE Trans. Eng. Manage. , vol.27 , Issue.2 , pp. 37-41
    • Eastman, R.M.1
  • 8
    • 4644346142 scopus 로고    scopus 로고
    • Change and customization in complex engineering domains
    • Eckert, C., Clarkson, P. J., and Zanker, W. (2004). " Change and customization in complex engineering domains.." Res. Eng. Des., 15, 1-21.
    • (2004) Res. Eng. Des. , vol.15 , pp. 1-21
    • Eckert, C.1    Clarkson, P.J.2    Zanker, W.3
  • 9
    • 0001073758 scopus 로고
    • Building theories from case study research
    • Eisenhardt, K. M. (1989). " Building theories from case study research.." Acad. Manage. Rev., 14, 532-550.
    • (1989) Acad. Manage. Rev. , vol.14 , pp. 532-550
    • Eisenhardt, K.M.1
  • 10
    • 34047207566 scopus 로고    scopus 로고
    • Theory building from cases: Opportunities and challenges
    • Eisenhardt, K. M., and Graebner, M. E. (2007). " Theory building from cases: Opportunities and challenges.." Acad. Manage J., 50 (1), 25-32.
    • (2007) Acad. Manage J. , vol.50 , Issue.1 , pp. 25-32
    • Eisenhardt, K.M.1    Graebner, M.E.2
  • 11
    • 84867993298 scopus 로고    scopus 로고
    • No project is an island: Linking projects to history and context
    • Engwall, M. (2003). " No project is an island: Linking projects to history and context.." Res. Policy, 32 (5), 789-808.
    • (2003) Res. Policy , vol.32 , Issue.5 , pp. 789-808
    • Engwall, M.1
  • 13
    • 39849109592 scopus 로고    scopus 로고
    • Reflections on designing and architectural practice
    • R. J. Boland, Jr. and F. Collopy, eds., Stanford Business Books, Stanford, Calif..
    • Gehry, F. O. (2004). " Reflections on designing and architectural practice.." Managing as designing, R. J. Boland, Jr., and, F. Collopy, eds., Stanford Business Books, Stanford, Calif., 19-35.
    • (2004) Managing As Designing , pp. 19-35
    • Gehry, F.O.1
  • 14
    • 0000683034 scopus 로고    scopus 로고
    • Standardization and pre-assembly-Distinguishing myth from reality using case study research
    • Gibb, A. G. F. (2001). " Standardization and pre-assembly- Distinguishing myth from reality using case study research.." Constr. Manage. Econom., 6 (3), 307-315.
    • (2001) Constr. Manage. Econom. , vol.6 , Issue.3 , pp. 307-315
    • Gibb, A.G.F.1
  • 15
    • 49149112435 scopus 로고    scopus 로고
    • Upstream problem-solving under uncertainty and ambiguity: Evidence from airport expansion projects
    • ".
    • Gil, N., Beckman, S., and Tommelein, I. (2008). " Upstream problem-solving under uncertainty and ambiguity: Evidence from airport expansion projects.." IEEE Trans. Eng. Manage., 55 (3), 508-522.
    • (2008) IEEE Trans. Eng. Manage. , vol.55 , Issue.3 , pp. 508-522
    • Gil, N.1    Beckman, S.2    Tommelein, I.3
  • 16
    • 33746656287 scopus 로고    scopus 로고
    • External change in large engineering design projects: The role of the client
    • ".
    • Gil, N., Tommelein, I. D., and Schruben, L. W. (2006). " External change in large engineering design projects: The role of the client.." IEEE Trans. Eng. Manage., 53 (3), 426-439.
    • (2006) IEEE Trans. Eng. Manage. , vol.53 , Issue.3 , pp. 426-439
    • Gil, N.1    Tommelein, I.D.2    Schruben, L.W.3
  • 17
    • 15944418637 scopus 로고    scopus 로고
    • Embodying product and process flexibility to cope with challenging project deliveries
    • ".
    • Gil, N., Tommelein, I. D., Stout, A., and Garrett, T. (2005). " Embodying product and process flexibility to cope with challenging project deliveries.." J. Constr. Eng. Manage., 131 (4), 439-448.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 439-448
    • Gil, N.1    Tommelein, I.D.2    Stout, A.3    Garrett, T.4
  • 19
    • 0035707626 scopus 로고    scopus 로고
    • Performance of coupled product development activities with a deadline
    • ".
    • Joglekar, N. R., Yassine, A. A., Eppinger, S. D., and Whitney, D. E. (2001). " Performance of coupled product development activities with a deadline.." Manage. Sci., 47 (12), 1605-1620.
    • (2001) Manage. Sci. , vol.47 , Issue.12 , pp. 1605-1620
    • Joglekar, N.R.1    Yassine, A.A.2    Eppinger, S.D.3    Whitney, D.E.4
  • 21
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • ".
    • Krishnan, V., Eppinger, S. D., and Whitney, D. E. (1997). " A model-based framework to overlap product development activities.." Manage. Sci., 43 (4), 437-451.
    • (1997) Manage. Sci. , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 22
    • 25444435990 scopus 로고    scopus 로고
    • Quality and change management model for large scale concurrent design and construction projects
    • ".
    • Lee, S., Pea-Mora, F., and Park, M. (2005). " Quality and change management model for large scale concurrent design and construction projects.." J. Constr. Eng. Manage., 131 (8), 890-902.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.8 , pp. 890-902
    • Lee, S.1    Pea-Mora, F.2    Park, M.3
  • 23
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • Loch, C. H., and Terwiesch, C. (1998). " Communication and uncertainty in concurrent engineering.." Manage. Sci., 44 (8), 1032-1048.
    • (1998) Manage. Sci. , vol.44 , Issue.8 , pp. 1032-1048
    • Loch, C.H.1    Terwiesch, C.2
  • 24
    • 33646180784 scopus 로고    scopus 로고
    • Application of dependency structure matrix for activity sequencing in concurrent engineering projects
    • " ().
    • Maheswari, J. U., Varghese, K., and Sridharan, T. (2006). " Application of dependency structure matrix for activity sequencing in concurrent engineering projects.." J. Constr. Eng. Manage. 132 (5), 482-490.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 482-490
    • Maheswari, J.U.1    Varghese, K.2    Sridharan, T.3
  • 26
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design-build fast-track construction projects
    • Pena-Mora, F., and Lee, M. (2001). " Dynamic planning and control methodology for design-build fast-track construction projects.." J. Constr. Eng. Manage., 127 (1), 1-17.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 1-17
    • Pena-Mora, F.1    Lee, M.2
  • 27
    • 0035510392 scopus 로고    scopus 로고
    • Dynamic planning for fast-tracking building construction projects
    • Pena-Mora, F., and Park, M. (2001). " Dynamic planning for fast-tracking building construction projects.." J. Constr. Eng. Manage., 127 (6), 445-456.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 445-456
    • Pena-Mora, F.1    Park, M.2
  • 28
    • 0027609245 scopus 로고
    • Choice over uncertainty and ambiguity in technical problem solving
    • Schrader, S., Riggs, W. M., and Smith, R. P. (1993). " Choice over uncertainty and ambiguity in technical problem solving.." J. Eng. Technol. Manage., 10, 73-99.
    • (1993) J. Eng. Technol. Manage. , vol.10 , pp. 73-99
    • Schrader, S.1    Riggs, W.M.2    Smith, R.P.3
  • 30
    • 8344229311 scopus 로고    scopus 로고
    • Selectionism and learning in projects with complexity and unforeseeable uncertainty
    • Sommer, S. C., and Loch, C. H. (2004). " Selectionism and learning in projects with complexity and unforeseeable uncertainty.." Manage. Sci., 50 (10), 1334-1347.
    • (2004) Manage. Sci. , vol.50 , Issue.10 , pp. 1334-1347
    • Sommer, S.C.1    Loch, C.H.2
  • 32
    • 0032635365 scopus 로고    scopus 로고
    • Measuring the effectiveness of overlapping development activities
    • Terwiesch, C., and Loch, C. H. (1999). " Measuring the effectiveness of overlapping development activities.," Manage. Sci., 45 (4), 455-465.
    • (1999) Manage. Sci. , vol.45 , Issue.4 , pp. 455-465
    • Terwiesch, C.1    Loch, C.H.2
  • 33
    • 0036638665 scopus 로고    scopus 로고
    • Exchanging preliminary information in concurrent engineering: Alternative coordination strategies
    • ".
    • Terwiesch, C., Loch, C. H., and De Meyer, A. (2002). " Exchanging preliminary information in concurrent engineering: Alternative coordination strategies.," Org. Sci., 13 (4), 402-419.
    • (2002) Org. Sci. , vol.13 , Issue.4 , pp. 402-419
    • Terwiesch, C.1    Loch, C.H.2    De Meyer, A.3
  • 34
    • 58149321832 scopus 로고
    • The role of product architecture in the manufacturing firm
    • Ulrich, K. (1995). " The role of product architecture in the manufacturing firm.." Res. Policy, 24, 19-440.
    • (1995) Res. Policy , vol.24 , pp. 19-440
    • Ulrich, K.1
  • 35
    • 0003673547 scopus 로고
    • 1st Ed., Applied Social Research Methods Series, L. Bickman, ed., Vol., Sage, Beverly Hills, Calif.
    • Yin, R. K. (1984). Case study research: Design and methods, 1st Ed., Applied Social Research Methods Series, L. Bickman, ed., Vol. 5, Sage, Beverly Hills, Calif.
    • (1984) Case Study Research: Design and Methods , vol.5
    • Yin, R.K.1