메뉴 건너뛰기




Volumn 134, Issue 12, 2008, Pages 928-941

Knowledge-driven ANP approach to vendors evaluation for sustainable construction

Author keywords

Bids; Construction management; Decision making; Evaluation; Procurement; Sustainable development

Indexed keywords

CONSTRUCTION INDUSTRY; PLANNING; PROJECT MANAGEMENT; STRATEGIC PLANNING; SUSTAINABLE DEVELOPMENT;

EID: 56349099299     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2008)134:12(928)     Document Type: Article
Times cited : (29)

References (52)
  • 2
    • 0000365630 scopus 로고    scopus 로고
    • Project procurement system selection model
    • Alhazmi, T., and McCaffer, R. (2000). " Project procurement system selection model.." J. Constr. Eng. Manage., 126 (3), 176-184.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.3 , pp. 176-184
    • Alhazmi, T.1    McCaffer, R.2
  • 3
    • 55249111483 scopus 로고    scopus 로고
    • Construction procurement strategy selection using analytical hierarchy process
    • Al-Tabtabai, H. M. (2002). " Construction procurement strategy selection using analytical hierarchy process.." J. Constr. Procure., 8 (2), 117-132.
    • (2002) J. Constr. Procure. , vol.8 , Issue.2 , pp. 117-132
    • Al-Tabtabai, H.M.1
  • 5
    • 56349096004 scopus 로고    scopus 로고
    • Australian Bureau of Statistics (ABS).., The Australian Bureau of Statistics (ABS), Belconnen, Australia.
    • Australian Bureau of Statistics (ABS). (2004). ANZSIC review: Construction division paper, The Australian Bureau of Statistics (ABS), Belconnen, Australia.
    • (2004) ANZSIC Review: Construction Division Paper
  • 6
    • 33644778302 scopus 로고    scopus 로고
    • Australian Government Department of the Environment and Heritage (DEH).., Industry Partnerships Section, Environment Protection Branch, Australia, 〈〉 (Nov. 23, 2004).
    • Australian Government Department of the Environment and Heritage (DEH). (2004). National Australian built environment rating system (NABERS) project, Industry Partnerships Section, Environment Protection Branch, Australia, 〈 http://www.deh.gov.au/industry/construction/nabers/index.html 〉 (Nov. 23, 2004).
    • (2004) National Australian Built Environment Rating System (NABERS) Project
  • 7
    • 0031103720 scopus 로고    scopus 로고
    • Demystifying the local agency procurement and selection process for professional engineering consultant services
    • Avila, E. A. (1997). " Demystifying the local agency procurement and selection process for professional engineering consultant services.." J. Manage. Eng., 13 (2), 92-95.
    • (1997) J. Manage. Eng. , vol.13 , Issue.2 , pp. 92-95
    • Avila, E.A.1
  • 11
    • 3142577470 scopus 로고    scopus 로고
    • An integrative analytical system for environmental management in construction projects
    • ".
    • Chen, Z., Li, H., Hong, J., and Xu, Q. (2004). " An integrative analytical system for environmental management in construction projects.." Autom. Constr., 13 (5), 621-628.
    • (2004) Autom. Constr. , vol.13 , Issue.5 , pp. 621-628
    • Chen, Z.1    Li, H.2    Hong, J.3    Xu, Q.4
  • 12
    • 0034227664 scopus 로고    scopus 로고
    • Environmental management of urban construction projects in China
    • ".
    • Chen, Z., Li, H., and Wong, C. T. C. (2000). " Environmental management of urban construction projects in China.." J. Constr. Eng. Manage., 126 (4), 320-324.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 320-324
    • Chen, Z.1    Li, H.2    Wong, C.T.C.3
  • 13
    • 12344287194 scopus 로고    scopus 로고
    • Environal Planning: An analytic network process model for environmentally conscious, construction planning
    • Chen, Z., and Li, H., and Wong, C. T. C. (2005). " Environal Planning: An analytic network process model for environmentally conscious, construction planning.." J. Constr. Eng. Manage., 131 (1), 92-101.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 92-101
    • Chen, Z.1    Li, H.2    Wong, C.T.C.3
  • 14
    • 0035399186 scopus 로고    scopus 로고
    • Improving objectivity in procurement selection
    • ".
    • Cheung, S. O., Lam, T. I., and Wan, W. Y. (2001). " Improving objectivity in procurement selection.." J. Manage. Eng., 17 (3), 132-139.
    • (2001) J. Manage. Eng. , vol.17 , Issue.3 , pp. 132-139
    • Cheung, S.O.1    Lam, T.I.2    Wan, W.Y.3
  • 15
    • 0034269643 scopus 로고    scopus 로고
    • Key factors in bid reasoning model
    • Chua, D. K. H., and Li, D. (2000). " Key factors in bid reasoning model.." J. Constr. Eng. Manage., 126 (5), 349-357.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 349-357
    • Chua, D.K.H.1    Li, D.2
  • 16
    • 2142839396 scopus 로고
    • Risk assessment of competitive procurement
    • Crowley, L. G., and Hancher, D. E. (1995). " Risk assessment of competitive procurement.." J. Constr. Eng. Manage., 121 (2), 230-237.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 230-237
    • Crowley, L.G.1    Hancher, D.E.2
  • 17
    • 56349088472 scopus 로고    scopus 로고
    • Department for Environment, Food and Rural Affairs.. "." U.K., 〈〉 (June 10, 2008).
    • Department for Environment, Food and Rural Affairs. (2006). " What is sustainable development? The sustainable development unit (SDU).." U.K., 〈 http://www.sustainable-development.gov.uk/what/index.htm 〉 (June 10, 2008).
    • (2006) What Is Sustainable Development? the Sustainable Development Unit (SDU)
  • 18
    • 0030213483 scopus 로고    scopus 로고
    • Petroleum pipeline construction planning: A conceptual framework
    • ".
    • Dey, P. K., Tabucanon, M. T., and Ogunlana, S. O. (1996). " Petroleum pipeline construction planning: a conceptual framework.." Int. J. Proj. Manage., 14 (4), 231-240.
    • (1996) Int. J. Proj. Manage. , vol.14 , Issue.4 , pp. 231-240
    • Dey, P.K.1    Tabucanon, M.T.2    Ogunlana, S.O.3
  • 20
    • 32944469606 scopus 로고    scopus 로고
    • Comparing procurement methods for design-build projects
    • ".
    • El Wardani M. M. A., Messner J. I., and Horman, M. J. (2006). " Comparing procurement methods for design-build projects.." J. Constr. Eng. Manage., 132 (3), 230-238.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.3 , pp. 230-238
    • El Wardani, M.M.A.1    Messner, J.I.2    Horman, M.J.3
  • 21
    • 56349132837 scopus 로고    scopus 로고
    • EmaConstruction Network.., EmaConstruction Network, London, 〈〉 (October 10, 2008).
    • Emap Construction Network. (2008). Construction plus: Knowledge for construction, Emap Construction Network, London, 〈 http://www. constructionplus.co.uk/ 〉 (October 10, 2008).
    • (2008) Construction Plus: Knowledge for Construction
  • 22
    • 56349110543 scopus 로고    scopus 로고
    • Expert Choice.. "." Expert Choice, Inc., USA, 〈〉 (May 12, 2007).
    • Expert Choice. (2005). " Client list.." Expert Choice, Inc., USA, 〈 http://www.expertchoice.com 〉 (May 12, 2007).
    • (2005) Client List
  • 23
    • 56349166237 scopus 로고    scopus 로고
    • A synthesis of design-builder selection methods for public infrastructure projects
    • Gransberg, D. G., and Molenaar, D. (2003). " A synthesis of design-builder selection methods for public infrastructure projects.." J. Constr. Procure., 9 (2), 40-51.
    • (2003) J. Constr. Procure. , vol.9 , Issue.2 , pp. 40-51
    • Gransberg, D.G.1    Molenaar, D.2
  • 25
    • 0028548226 scopus 로고
    • Procurement issues
    • Hampton, D. (1994). " Procurement issues.." J. Manage. Eng., 10 (6), 45-49.
    • (1994) J. Manage. Eng. , vol.10 , Issue.6 , pp. 45-49
    • Hampton, D.1
  • 26
    • 27644447547 scopus 로고    scopus 로고
    • 2nd Ed., Performance Based Studies Research Grou(PBSRG), Arizona State University Press, Tempe, Ariz.
    • Kashiwagi, D. T. (2004). Best value procurement, 2nd Ed., Performance Based Studies Research Group (PBSRG), Arizona State University Press, Tempe, Ariz.
    • (2004) Best Value Procurement
    • Kashiwagi, D.T.1
  • 27
    • 13944284513 scopus 로고    scopus 로고
    • State of Utah performance information procurement system tests
    • Kashiwagi, D. T., and Byfield, R. (2002a). " State of Utah performance information procurement system tests.." J. Constr. Eng. Manage., 128 (4), 338-347.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 338-347
    • Kashiwagi, D.T.1    Byfield, R.2
  • 28
    • 13944254017 scopus 로고    scopus 로고
    • Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement
    • Kashiwagi, D. T., and Byfield, R. (2002b). " Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement.." J. Constr. Eng. Manage., 128 (6), 496-502.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.6 , pp. 496-502
    • Kashiwagi, D.T.1    Byfield, R.2
  • 29
    • 0036850877 scopus 로고    scopus 로고
    • Comparative study of two techniques of transit performance assessment
    • ".
    • Khasnabis, S., Alsaidi, E., Liu, L., and Ellis, R. D. (2002). " Comparative study of two techniques of transit performance assessment.." J. Transp. Eng., 128 (6), 499-508.
    • (2002) J. Transp. Eng. , vol.128 , Issue.6 , pp. 499-508
    • Khasnabis, S.1    Alsaidi, E.2    Liu, L.3    Ellis, R.D.4
  • 31
    • 0032075066 scopus 로고    scopus 로고
    • Contractor selection process for Taipei mass rapid transit system
    • ".
    • Lo, W., Chao, C. H., Hadavi, A., and Krizek, R. J. (1998). " Contractor selection process for Taipei mass rapid transit system.." J. Manage. Eng., 14 (3), 57-65.
    • (1998) J. Manage. Eng. , vol.14 , Issue.3 , pp. 57-65
    • Lo, W.1    Chao, C.H.2    Hadavi, A.3    Krizek, R.J.4
  • 32
    • 56349086091 scopus 로고    scopus 로고
    • McGraw-Hill.., The McGraw-Hill Companies, Inc., New York, 〈〉 (October 10, 2008).
    • McGraw-Hill. (2008). Construction, building, and engineering news: ENR, The McGraw-Hill Companies, Inc., New York, 〈 http://enr.construction.com/ Default.asp 〉 (October 10, 2008).
    • (2008) Construction, Building, and Engineering News: ENR
  • 33
    • 0032785135 scopus 로고    scopus 로고
    • Analyzing organizational project alternatives for agile manufacturing processes
    • Meade, L. M., and Sarkis, J. (1999). " Analyzing organizational project alternatives for agile manufacturing processes.." Int. J. Prod. Res., 37 (2), 241-261.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.2 , pp. 241-261
    • Meade, L.M.1    Sarkis, J.2
  • 35
    • 13944260593 scopus 로고    scopus 로고
    • Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply
    • ".
    • Muya, M., Price, A. D. F., Thorpe, A., and Edum-Fotwe, F. (1999). " Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply.." J. Constr. Procure., 5 (2), 99-117.
    • (1999) J. Constr. Procure. , vol.5 , Issue.2 , pp. 99-117
    • Muya, M.1    Price, A.D.F.2    Thorpe, A.3    Edum-Fotwe, F.4
  • 36
    • 0003775779 scopus 로고    scopus 로고
    • National Academy of Engineering (NAE).., Committee on Industrial Environmental Performance Metrics, National Research Council, Washington, D.C..
    • National Academy of Engineering (NAE). (1999). Industrial environmental performance metrics: Challenges and opportunities, Committee on Industrial Environmental Performance Metrics, National Research Council, Washington, D.C..
    • (1999) Industrial Environmental Performance Metrics: Challenges and Opportunities
  • 37
    • 85014373962 scopus 로고    scopus 로고
    • National Academy of Sciences (NAS).., Committee on the Human Dimensions of Global Change (HDGC), and Center for Economic, Governance, and International Studies (CEGIS), Washington, D.C.
    • National Academy of Sciences (NAS). (2005). Decision making for the environment: Social and behavioral science research priorities, Committee on the Human Dimensions of Global Change (HDGC), and Center for Economic, Governance, and International Studies (CEGIS), Washington, D.C.
    • (2005) Decision Making for the Environment: Social and Behavioral Science Research Priorities
  • 38
    • 0023363645 scopus 로고
    • Constructibility concepts for engineering and procurement
    • ".
    • O'Connor, J. T., Rusch, S. E., and Schulz, M. J. (1987). " Constructibility concepts for engineering and procurement.." J. Constr. Eng. Manage., 113 (2), 235-248.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 235-248
    • O'Connor, J.T.1    Rusch, S.E.2    Schulz, M.J.3
  • 40
    • 0034271075 scopus 로고    scopus 로고
    • Contractor selection for design/build projects
    • Palaneeswaran, E., and Kumaraswamy, M. M. (2000). " Contractor selection for design/build projects.." J. Constr. Eng. Manage., 126 (5), 331-339.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 331-339
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2
  • 41
    • 33646579413 scopus 로고    scopus 로고
    • Legal issues associated with emergent actor roles in innovative U.K. procurement: Prime contracting cast study
    • Pryke, S. D. (2006). " Legal issues associated with emergent actor roles in innovative U.K. procurement: Prime contracting cast study.." J. Profl. Issues Eng. Educ. Pract., 132 (1), 67-76.
    • (2006) J. Profl. Issues Eng. Educ. Pract. , vol.132 , Issue.1 , pp. 67-76
    • Pryke, S.D.1
  • 49
    • 33644890627 scopus 로고    scopus 로고
    • UK Government Department of Trade and Industry (UK DTI).., Sustainable construction team (DTI), London, 〈〉 (Nov. 23, 2004).
    • UK Government Department of Trade and Industry (UK DTI). (2004). Sustainable construction brief 2, Sustainable construction team (DTI), London, 〈 http://www.dti.gov.uk/construction/sustain/ 〉 (Nov. 23, 2004).
    • (2004) Sustainable Construction Brief 2
  • 51
    • 34447288191 scopus 로고    scopus 로고
    • U.S. Census Bureau., census. gov, 〈〉 (Nov. 23, 2004).
    • U.S. Census Bureau (2002). 2002 NAICS codes and titles, census. gov, 〈 http://www.census.gov/epcd/naics02/naicod02.htm 〉 (Nov. 23, 2004).
    • (2002) 2002 NAICS Codes and Titles
  • 52
    • 0018668887 scopus 로고
    • Transportation Research Board and Washington, D.C., Transportation Research Record. 698.
    • Zeeger, C. V., and Rizenbergs, R. L. (1979). " Priority programming for highway reconstruction.." Transportation Research Board and Washington, D.C., Transportation Research Record. 698, 15-23.
    • (1979) Priority Programming for Highway Reconstruction , pp. 15-23
    • Zeeger, C.V.1    Rizenbergs, R.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.