Petroleum pipeline construction planning: A conceptual framework

Author keywords

Goal programming; Integration; Pipeline construction; Project control; Project planning; Risk analysis

Indexed keywords

CONSTRUCTION; DECISION MAKING; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; OPERATIONS RESEARCH; PETROLEUM PIPELINES; PLANNING; PROBABILITY; RESOURCE ALLOCATION; RISK ASSESSMENT; SCHEDULING; SPECIFICATIONS;

EID: 0030213483     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/0263-7863(95)00092-5     Document Type: Article
Times cited : (31)

References (9)
  • 4
    • 0042122525 scopus 로고
    • Project breakdown structure: The tool for representing the project system in project management
    • Scasso, R de H and Larenas, G S 'Project breakdown structure: the tool for representing the project system in project management' International Journal of Project Management 9 (1991) 157-161
    • (1991) International Journal of Project Management , vol.9 , pp. 157-161
    • De Scasso, R.H.1    Larenas, G.S.2
  • 5
    • 0025503588 scopus 로고
    • Risk classification of estimates and contingency management
    • Yeo, K T 'Risk classification of estimates and contingency management' Journal of Management in Engineering 6 (1990) 458-470
    • (1990) Journal of Management in Engineering , vol.6 , pp. 458-470
    • Yeo, K.T.1
  • 6
    • 0001848701 scopus 로고
    • Planning for project control through risk analysis: A case of petroleum pipeline laying project
    • Dey, P K, Tabucanon, M T and Ogunlana, S O 'Planning for project control through risk analysis: a case of petroleum pipeline laying project' International Journal of Project Management (1) (1994) 23-33
    • (1994) International Journal of Project Management , Issue.1 , pp. 23-33
    • Dey, P.K.1    Tabucanon, M.T.2    Ogunlana, S.O.3
  • 7
    • 0042122526 scopus 로고
    • The application of goal programming techniques to the CPM problem
    • Hannan, E L 'The application of goal programming techniques to the CPM problem' Socio-economic Planning Sciences 12 (1978) 267-270
    • (1978) Socio-economic Planning Sciences , vol.12 , pp. 267-270
    • Hannan, E.L.1
  • 8
    • 0022735435 scopus 로고
    • A GP model for project crashing with piecewise linear time-cost trade-off
    • Vrat, P and Kriengkrairut, C 'A GP model for project crashing with piecewise linear time-cost trade-off' Engineering Cost and Production Economics 10 (1986) 161-172
    • (1986) Engineering Cost and Production Economics , vol.10 , pp. 161-172
    • Vrat, P.1    Kriengkrairut, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.