메뉴 건너뛰기




Volumn 1, Issue , 2006, Pages 633-641

Configuration management and maintenance ranking by reliability importance measures

Author keywords

[No Author keywords available]

Indexed keywords

LARGE SCALE SYSTEMS; MAINTENANCE; PREVENTIVE MAINTENANCE; QUALITY ASSURANCE; RELIABILITY THEORY; RISK ASSESSMENT; RISK MANAGEMENT;

EID: 56249138989     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (11)
  • 1
    • 56249146561 scopus 로고
    • Advanced Accident Sequence Quantification Techniques Developed in Loviisa 1 PSA
    • Pittsburgh, 2-7 April, La Grange Park: American Nuclear Society
    • Andsten, R. & Vaurio, J.K. 1989. Advanced Accident Sequence Quantification Techniques Developed in Loviisa 1 PSA. Proc. PSA'89 Intl. Mtg. on Probability, Reliability and Safety Assessment: 965-971. Pittsburgh, 2-7 April 1989. La Grange Park: American Nuclear Society.
    • (1989) Proc. PSA'89 Intl. Mtg. on Probability, Reliability and Safety Assessment , pp. 965-971
    • Andsten, R.1    Vaurio, J.K.2
  • 2
    • 0026869847 scopus 로고
    • Sensitivity, Uncertainty and Importance Analysis of a Risk Assessment
    • Andsten, R.S. & Vaurio, J.K. 1992. Sensitivity, Uncertainty and Importance Analysis of a Risk Assessment. Nuclear Technology 98: 160-170.
    • (1992) Nuclear Technology , vol.98 , pp. 160-170
    • Andsten, R.S.1    Vaurio, J.K.2
  • 3
    • 0035341687 scopus 로고    scopus 로고
    • A new importance measure for risk informed decision making
    • Borgonovo, E. & Apostolakis, G. 2000. A new importance measure for risk informed decision making. Reliab Engng Syst Safety 72: 195-212.
    • (2000) Reliab Engng Syst Safety , vol.72 , pp. 195-212
    • Borgonovo, E.1    Apostolakis, G.2
  • 4
    • 5444274004 scopus 로고    scopus 로고
    • Issues and recommendations for advancement of PRA technology in risk-informed decision making
    • Report NUREG/CR-6813. Washington, DC: U.S. Nuclear Regulatory Commission
    • Fleming, K.N. 2003. Issues and recommendations for advancement of PRA technology in risk-informed decision making. Report NUREG/CR-6813. Washington, DC: U.S. Nuclear Regulatory Commission.
    • (2003)
    • Fleming, K.N.1
  • 6
    • 56249097130 scopus 로고    scopus 로고
    • 10 CFR 50.69 SSC Categorization Guideline
    • NEI
    • NEI. 2003.10 CFR 50.69 SSC Categorization Guideline. NEI 00-04 (Draft-Revision D).
    • (2003) NEI 00-04 (Draft-Revision D)
  • 8
    • 0029237571 scopus 로고
    • Optimization of test and maintenance intervals based on risk and cost
    • Vaurio, J.K. 1995. Optimization of test and maintenance intervals based on risk and cost. Reliability Engineering and System Safety 49: 23-36.
    • (1995) Reliability Engineering and System Safety , vol.49 , pp. 23-36
    • Vaurio, J.K.1
  • 9
    • 0032181593 scopus 로고    scopus 로고
    • Safety-related decision making at a nuclear power plant
    • Vaurio, J.K. 1998. Safety-related decision making at a nuclear power plant. Nuclear Engineering and Design 185: 335-346.
    • (1998) Nuclear Engineering and Design , vol.185 , pp. 335-346
    • Vaurio, J.K.1
  • 10
    • 0035501182 scopus 로고    scopus 로고
    • Fault tree analysis of phased mission systems with repairable and non-repairable components
    • Vaurio, J.K. 2001. Fault tree analysis of phased mission systems with repairable and non-repairable components, Reliability Engineering and System Safety 74: 169-180.
    • (2001) Reliability Engineering and System Safety , vol.74 , pp. 169-180
    • Vaurio, J.K.1
  • 11
    • 84892649490 scopus 로고    scopus 로고
    • Developments in importance measures for risk-informed ranking and other applications
    • New Orleans, 14-19 May, ASME
    • Vaurio, J.K. 2006. Developments in importance measures for risk-informed ranking and other applications. In Proc. PSAM 8 conf, New Orleans, 14-19 May 2006: ASME.
    • (2006) Proc. PSAM 8 conf
    • Vaurio, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.