메뉴 건너뛰기




Volumn 11, Issue 6, 2008, Pages 457-473

Bicriteria robotic cell scheduling

Author keywords

Bicriteria optimization; CNC; Controllable processing times; Robotic cell

Indexed keywords

BICRITERIA; BICRITERIA OPTIMIZATION; CNC; CNC MACHINES; CONTROLLABLE PROCESSING TIMES; COST STRUCTURES; COST VALUES; CYCLE TIMES; EFFICIENT SETS; FLOW SHOPS; MACHINE CELLS; MACHINE MANUFACTURING; MACHINING CONDITIONS; MANUFACTURING COSTS; PROCESSING TIMES; ROBOTIC CELL; ROBOTIC CELLS; SCHEDULING PROBLEMS; SUFFICIENT CONDITIONS;

EID: 55849147638     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-007-0033-9     Document Type: Article
Times cited : (14)

References (20)
  • 2
    • 0002804434 scopus 로고    scopus 로고
    • On the conjecture in robotic cells: New simplified proof for the three-machine case
    • N. Brauner G. Finke 1999 On the conjecture in robotic cells: new simplified proof for the three-machine case INFOR: Information Systems and Operational Research 37 20 36
    • (1999) INFOR: Information Systems and Operational Research , vol.37 , pp. 20-36
    • Brauner, N.1    Finke, G.2
  • 3
    • 0032222091 scopus 로고    scopus 로고
    • Bicriterion single machine scheduling with resource dependent processing times
    • T. C. E. Cheng A. Janiak M. Y. Kovalyov 1998 Bicriterion single machine scheduling with resource dependent processing times SIAM Journal on Optimization 8 617 630
    • (1998) SIAM Journal on Optimization , vol.8 , pp. 617-630
    • Cheng, T.C.E.1    Janiak, A.2    Kovalyov, M.Y.3
  • 4
    • 33745207776 scopus 로고    scopus 로고
    • A faster polynomial algorithm for 2-cyclic robotic scheduling
    • C. Chu 2006 A faster polynomial algorithm for 2-cyclic robotic scheduling Journal of Scheduling 9 453 468
    • (2006) Journal of Scheduling , vol.9 , pp. 453-468
    • Chu, C.1
  • 5
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • 6
    • Y. Crama J. Van de Klundert 1997 Cyclic scheduling of identical parts in a robotic cell Operations Research 45 6 952 965
    • (1997) Operations Research , vol.45 , pp. 952-965
    • Crama, Y.1    Van De Klundert, J.2
  • 6
    • 0002604088 scopus 로고    scopus 로고
    • Cyclic scheduling in 3-machine robotic flow shops
    • Y. Crama J. Van de Klundert 1999 Cyclic scheduling in 3-machine robotic flow shops Journal of Scheduling 4 35 54
    • (1999) Journal of Scheduling , vol.4 , pp. 35-54
    • Crama, Y.1    Van De Klundert, J.2
  • 8
    • 0024769314 scopus 로고
    • Single machine scheduling with controllable processing times and number of jobs tardy
    • R. L. Daniels R. K. Sarin 1989 Single machine scheduling with controllable processing times and number of jobs tardy Operations Research 37 981 984
    • (1989) Operations Research , vol.37 , pp. 981-984
    • Daniels, R.L.1    Sarin, R.K.2
  • 10
    • 0031142587 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Classification, two and three machine cells
    • 3
    • N. G. Hall H. Kamoun C. Sriskandarajah 1997 Scheduling in robotic cells: classification, two and three machine cells Operations Research 45 3 421 439
    • (1997) Operations Research , vol.45 , pp. 421-439
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 12
    • 0030263104 scopus 로고    scopus 로고
    • Single machine scheduling subject to deadlines and resource dependent processing times
    • A. Janiak M. Y. Kovalyov 1996 Single machine scheduling subject to deadlines and resource dependent processing times European Journal of Operational Research 94 284 291
    • (1996) European Journal of Operational Research , vol.94 , pp. 284-291
    • Janiak, A.1    Kovalyov, M.Y.2
  • 13
    • 13544276185 scopus 로고    scopus 로고
    • A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
    • R. K. Kayan M. S. Akturk 2005 A new bounding mechanism for the CNC machine scheduling problems with controllable processing times European Journal Operational Research 167 624 643
    • (2005) European Journal Operational Research , vol.167 , pp. 624-643
    • Kayan, R.K.1    Akturk, M.S.2
  • 15
    • 0000976158 scopus 로고
    • A survey of results for sequencing problems with controllable processing times
    • E. Nowicki S. Zdrzalka 1995 A survey of results for sequencing problems with controllable processing times Discrete Applied Mathematics 63 237 256
    • (1995) Discrete Applied Mathematics , vol.63 , pp. 237-256
    • Nowicki, E.1    Zdrzalka, S.2
  • 17
    • 2942731249 scopus 로고    scopus 로고
    • Minimizing the total weighted flow time in a single machine with controllable processing times
    • D. Shabtay M. Kaspi 2004 Minimizing the total weighted flow time in a single machine with controllable processing times Computers & Operations Research 31 2279 2289
    • (2004) Computers & Operations Research , vol.31 , pp. 2279-2289
    • Shabtay, D.1    Kaspi, M.2
  • 19
    • 0019058538 scopus 로고
    • Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine
    • R. G. Vickson 1980 Choosing the job sequence and processing times to minimize processing plus flow cost on a single machine Operations Research 28 1155 1167
    • (1980) Operations Research , vol.28 , pp. 1155-1167
    • Vickson, R.G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.