메뉴 건너뛰기




Volumn 115, Issue 2, 2008, Pages 528-541

Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain

Author keywords

Master production scheduling; Materials requirement planning; Simulation; Supply chain management

Indexed keywords

COST BENEFIT ANALYSIS; PRODUCTION CONTROL; SUPPLY CHAIN MANAGEMENT;

EID: 55349139038     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2008.05.019     Document Type: Article
Times cited : (44)

References (50)
  • 1
    • 84989493292 scopus 로고
    • An experimental study of the effectiveness of rolling schedules in production planning
    • Baker, K.R., 1977. An experimental study of the effectiveness of rolling schedules in production planning. Decision Sciences 8(1), 19-27.
    • (1977) Decision Sciences , vol.8 , Issue.1 , pp. 19-27
    • Baker, K.R.1
  • 2
    • 84989444315 scopus 로고
    • Heuristic lot-sizing performance in a rolling-schedule environment
    • Blackburn, J.D., Millen, R.A., 1980. Heuristic lot-sizing performance in a rolling-schedule environment. Decision Sciences 11, 691-701.
    • (1980) Decision Sciences , vol.11 , pp. 691-701
    • Blackburn, J.D.1    Millen, R.A.2
  • 3
    • 0040553743 scopus 로고
    • The impact of a rolling schedule in a multi-level MRP system
    • Blackburn, J.D., Millen, R.A., 1982a. The impact of a rolling schedule in a multi-level MRP system. Journal of Operations Management 2 (2). 125-134.
    • (1982) Journal of Operations Management , vol.2 , Issue.2 , pp. 125-134
    • Blackburn, J.D.1    Millen, R.A.2
  • 4
    • 0019913634 scopus 로고
    • Improved heuristics for multi-stage requirements planning systems
    • Blackburn, J.D., Millen, R.A., 1982b. Improved heuristics for multi-stage requirements planning systems. Management Science 28 (1), 44-56.
    • (1982) Management Science , vol.28 , Issue.1 , pp. 44-56
    • Blackburn, J.D.1    Millen, R.A.2
  • 5
    • 0022693736 scopus 로고
    • A comparison of strategies to dampen nervousness in MRP systems
    • Blackburn, J.D., Kropp, D.H., Millen, R.A., 1986. A comparison of strategies to dampen nervousness in MRP systems. Management Science 32 (4), 413-429.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 413-429
    • Blackburn, J.D.1    Kropp, D.H.2    Millen, R.A.3
  • 6
    • 0022812314 scopus 로고
    • Rolling horizon production planning for probabilistic time-varying demands
    • Bookbinder, J.H., H'ng, B.T., 1986. Rolling horizon production planning for probabilistic time-varying demands. International Journal of Production Research 24 (6), 1439-1458.
    • (1986) International Journal of Production Research , vol.24 , Issue.6 , pp. 1439-1458
    • Bookbinder, J.H.1    H'ng, B.T.2
  • 8
    • 84985788311 scopus 로고
    • Master production scheduling under rolling planning horizons with fixed order intervals
    • Campbell, G.M., 1992. Master production scheduling under rolling planning horizons with fixed order intervals. Decision Sciences 23, 312-331.
    • (1992) Decision Sciences , vol.23 , pp. 312-331
    • Campbell, G.M.1
  • 9
    • 84989491970 scopus 로고
    • The effectiveness of extending the horizon in rolling production scheduling
    • Carlson, R.C., Beckman, S.L., Kropp, D.H., 1982. The effectiveness of extending the horizon in rolling production scheduling. Decision Sciences 13, 129-146.
    • (1982) Decision Sciences , vol.13 , pp. 129-146
    • Carlson, R.C.1    Beckman, S.L.2    Kropp, D.H.3
  • 10
    • 0018507737 scopus 로고
    • Less nervous MRP systems: A dynamic economic lot-sizing approach
    • Carlson. R.C., Jucker, F.V., Kropp, D.H., 1979. Less nervous MRP systems: A dynamic economic lot-sizing approach. Management Science 25 (8), 754-761.
    • (1979) Management Science , vol.25 , Issue.8 , pp. 754-761
    • Carlson, R.C.1    Jucker, F.V.2    Kropp, D.H.3
  • 11
    • 84989463359 scopus 로고
    • A note on dynamic lot sizing in a rolling-horizon environment
    • Chand, S., 1982. A note on dynamic lot sizing in a rolling-horizon environment. Decision Sciences 13, 113-119.
    • (1982) Decision Sciences , vol.13 , pp. 113-119
    • Chand, S.1
  • 12
    • 84985759070 scopus 로고
    • Re-planning frequencies for master production schedules-Notes and recommendations
    • Chung, C., Krajewski, L.J., 1986. Re-planning frequencies for master production schedules-Notes and recommendations. Decision Sciences 17, 263-273.
    • (1986) Decision Sciences , vol.17 , pp. 263-273
    • Chung, C.1    Krajewski, L.J.2
  • 13
    • 84989457223 scopus 로고
    • Cost increases due to demand uncertainty in MRP lot sizing
    • De Bodt, M.A., Wassenhove, L.N.V., 1983. Cost increases due to demand uncertainty in MRP lot sizing. Decision Sciences 14, 345-361.
    • (1983) Decision Sciences , vol.14 , pp. 345-361
    • De Bodt, M.A.1    Wassenhove, L.N.V.2
  • 15
    • 0033285260 scopus 로고    scopus 로고
    • Supply chain benefits from advanced customer commitments
    • Gilbert, S.M., Ballou, R.H., 1999. Supply chain benefits from advanced customer commitments. Journal of Operations Management 18, 61-73.
    • (1999) Journal of Operations Management , vol.18 , pp. 61-73
    • Gilbert, S.M.1    Ballou, R.H.2
  • 16
    • 19844377525 scopus 로고    scopus 로고
    • Build-to-order supply chain management: A literature review and framework for development
    • Gunasekaran, A., Ngai, E.W.T., 2005. Build-to-order supply chain management: A literature review and framework for development. Journal of Operations Management 23, 423-451.
    • (2005) Journal of Operations Management , vol.23 , pp. 423-451
    • Gunasekaran, A.1    Ngai, E.W.T.2
  • 17
    • 0029389855 scopus 로고
    • Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
    • Kadipasaoglu, S.N., Sridharan, V., 1995. Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. Journal of Operations Management 13, 193-211.
    • (1995) Journal of Operations Management , vol.13 , pp. 193-211
    • Kadipasaoglu, S.N.1    Sridharan, V.2
  • 18
    • 0021373333 scopus 로고
    • A lot-sizing algorithm for reducing nervousness in MRP system
    • Kropp, D.H., Carlson. R.C., 1984. A lot-sizing algorithm for reducing nervousness in MRP system. Management Science 30 (2), 240-244.
    • (1984) Management Science , vol.30 , Issue.2 , pp. 240-244
    • Kropp, D.H.1    Carlson, R.C.2
  • 19
    • 84989427471 scopus 로고
    • Heuristic lot-sizing approaches for dealing with MRP system nervousness
    • Kropp, D.H., Carlson, R.C., Jucker, J.V., 1983. Heuristic lot-sizing approaches for dealing with MRP system nervousness. Decision Sciences 14(2), 156-169.
    • (1983) Decision Sciences , vol.14 , Issue.2 , pp. 156-169
    • Kropp, D.H.1    Carlson, R.C.2    Jucker, J.V.3
  • 21
    • 84985848296 scopus 로고
    • A model for master production scheduling in uncertain environments
    • Lin, N., Krajewski, L.J., 1992. A model for master production scheduling in uncertain environments. Decision Sciences 23, 839-861.
    • (1992) Decision Sciences , vol.23 , pp. 839-861
    • Lin, N.1    Krajewski, L.J.2
  • 22
    • 0028401193 scopus 로고
    • The effects of environmental factors on the design of master production scheduling systems
    • Lin, N., Krajewski, L.J., Leong, G.K., Benton, W.C., 1994. The effects of environmental factors on the design of master production scheduling systems. Journal of Operations Management 11, 367-384.
    • (1994) Journal of Operations Management , vol.11 , pp. 367-384
    • Lin, N.1    Krajewski, L.J.2    Leong, G.K.3    Benton, W.C.4
  • 23
    • 0001396613 scopus 로고
    • Planning horizons for the dynamic lot-size model: Zabel vs. protective procedures and computational results
    • Lundin, R.A., Morton, T.E., 1975. Planning horizons for the dynamic lot-size model: Zabel vs. protective procedures and computational results. Operations Research 23, 711-733.
    • (1975) Operations Research , vol.23 , pp. 711-733
    • Lundin, R.A.1    Morton, T.E.2
  • 24
    • 0017417271 scopus 로고
    • Reschedule the reschedules you just rescheduled-Way of life for MRP?
    • Mather, H.F., 1977. Reschedule the reschedules you just rescheduled-Way of life for MRP? Production and Inventory Management 18 (1), 60-79.
    • (1977) Production and Inventory Management , vol.18 , Issue.1 , pp. 60-79
    • Mather, H.F.1
  • 25
    • 0022735070 scopus 로고
    • Multi-item single level capacitated dynamic lotsizing heuristics: A computational comparison (Part II: Rolling horizon)
    • Maes, J., Van Wassenhove, L.N., 1986. Multi-item single level capacitated dynamic lotsizing heuristics: A computational comparison (Part II: Rolling horizon). IIE Transactions, 124-129.
    • (1986) IIE Transactions , pp. 124-129
    • Maes, J.1    Van Wassenhove, L.N.2
  • 26
    • 0025638208 scopus 로고
    • Simulation of ordering rules for single level MRP with a rolling horizon and no forecast error
    • Ristroph, J.H., 1990. Simulation of ordering rules for single level MRP with a rolling horizon and no forecast error. Computers and Industrial Engineering 19 (1-4), 155-159.
    • (1990) Computers and Industrial Engineering , vol.19 , Issue.1-4 , pp. 155-159
    • Ristroph, J.H.1
  • 27
    • 23344436675 scopus 로고    scopus 로고
    • Information sharing and coordination in make-to-order supply chains
    • Sahin, F., Robinson, E.P., 2005. Information sharing and coordination in make-to-order supply chains. Journal of Operations Management 23, 579-598.
    • (2005) Journal of Operations Management , vol.23 , pp. 579-598
    • Sahin, F.1    Robinson, E.P.2
  • 28
    • 1142268284 scopus 로고    scopus 로고
    • Flow coordination and information sharing in supply chains: Review, implications and directions for future research
    • Sahin, F., Robinson, E.P., 2002. Flow coordination and information sharing in supply chains: Review, implications and directions for future research. Decision Sciences 33 (4), 505-536.
    • (2002) Decision Sciences , vol.33 , Issue.4 , pp. 505-536
    • Sahin, F.1    Robinson, E.P.2
  • 29
    • 0033116507 scopus 로고    scopus 로고
    • Multiple level production planning in rolling horizon assembly environments
    • Simpson, N.C., 1999. Multiple level production planning in rolling horizon assembly environments. European Journal of Operational Research 114, 15-28.
    • (1999) European Journal of Operational Research , vol.114 , pp. 15-28
    • Simpson, N.C.1
  • 30
    • 0035427489 scopus 로고    scopus 로고
    • Questioning the relative virtues of dynamic lot sizing rules
    • Simpson. N.C., 2001. Questioning the relative virtues of dynamic lot sizing rules. Computers & Operations Research 28, 899-914.
    • (2001) Computers & Operations Research , vol.28 , pp. 899-914
    • Simpson, N.C.1
  • 31
    • 84985759548 scopus 로고
    • Freezing the master production schedule under demand uncertainty
    • Sridharan, V., Berry, W.L., 1990a. Freezing the master production schedule under demand uncertainty. Decision Sciences 21, 97-120.
    • (1990) Decision Sciences , vol.21 , pp. 97-120
    • Sridharan, V.1    Berry, W.L.2
  • 32
    • 0025399203 scopus 로고
    • Master production scheduling, make-to-stock products: A framework for analysis
    • Sridharan, V., Berry, W.L., 1990b. Master production scheduling, make-to-stock products: A framework for analysis. International Journal of Production Research 28 (3), 541-558.
    • (1990) International Journal of Production Research , vol.28 , Issue.3 , pp. 541-558
    • Sridharan, V.1    Berry, W.L.2
  • 33
    • 21844485482 scopus 로고
    • Freezing the master production schedule: Implications for fill rate
    • Sridharan, V., LaForge, R.L., 1994a. Freezing the master production schedule: Implications for fill rate. Decision Sciences 25 (3), 461-469.
    • (1994) Decision Sciences , vol.25 , Issue.3 , pp. 461-469
    • Sridharan, V.1    LaForge, R.L.2
  • 34
    • 0028434143 scopus 로고
    • A model to estimate service levels when a portion of the master production schedule is frozen
    • Sridharan, V., LaForge, R.L., 1994b. A model to estimate service levels when a portion of the master production schedule is frozen. Computers & Operations Research 21 (5), 477-486.
    • (1994) Computers & Operations Research , vol.21 , Issue.5 , pp. 477-486
    • Sridharan, V.1    LaForge, R.L.2
  • 35
    • 0023404035 scopus 로고
    • Freezing the master production schedule under rolling planning horizons
    • Sridharan, V., Berry, W.L., Udayabhanu, V., 1987. Freezing the master production schedule under rolling planning horizons. Management Science 33 (9), 1137-1149.
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1137-1149
    • Sridharan, V.1    Berry, W.L.2    Udayabhanu, V.3
  • 36
    • 84985855322 scopus 로고
    • Measuring master production schedule stability under rolling planning horizons
    • Sridharan, V., Berry, W.L., Udayabhanu, V., 1988. Measuring master production schedule stability under rolling planning horizons. Decision Sciences 19, 147-166.
    • (1988) Decision Sciences , vol.19 , pp. 147-166
    • Sridharan, V.1    Berry, W.L.2    Udayabhanu, V.3
  • 37
    • 0033886730 scopus 로고    scopus 로고
    • Improved rolling schedules for the dynamic single-level lot-sizing problem
    • Stadtler, H., 2000. Improved rolling schedules for the dynamic single-level lot-sizing problem. Management Science 2, 318-326.
    • (2000) Management Science , vol.2 , pp. 318-326
    • Stadtler, H.1
  • 38
    • 27844536452 scopus 로고    scopus 로고
    • Manufacturing practices and strategy integration: Effects on cost efficiency, flexibility, and market-based performance
    • Swink. M., Narasimhan, R., Kim, S.W., 2005. Manufacturing practices and strategy integration: Effects on cost efficiency, flexibility, and market-based performance. Decision Sciences 36 (3), 427-457.
    • (2005) Decision Sciences , vol.36 , Issue.3 , pp. 427-457
    • Swink, M.1    Narasimhan, R.2    Kim, S.W.3
  • 39
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M., Whitin, T.M., 1958. Dynamic version of the economic lot size model. Management Science 5, 89-96.
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 41
    • 0037464628 scopus 로고    scopus 로고
    • Freezing the master production schedule under single resource constraint and demand uncertainty
    • Xie, J., Zhao, X., Lee, T.S., 2003. Freezing the master production schedule under single resource constraint and demand uncertainty. International Journal of Production Economics 83 (1), 65-84.
    • (2003) International Journal of Production Economics , vol.83 , Issue.1 , pp. 65-84
    • Xie, J.1    Zhao, X.2    Lee, T.S.3
  • 42
    • 0022236783 scopus 로고
    • An analysis of scheduling policies in multiechelon production systems
    • Yano, C.A., Carlson, R.C., 1985. An analysis of scheduling policies in multiechelon production systems. IIE Transactions 17 (4), 370-377.
    • (1985) IIE Transactions , vol.17 , Issue.4 , pp. 370-377
    • Yano, C.A.1    Carlson, R.C.2
  • 43
    • 0023288994 scopus 로고
    • Interaction between frequency of rescheduling and the role of safety stock in MRP systems
    • Yano, C.A., Carlson, R.C., 1987. Interaction between frequency of rescheduling and the role of safety stock in MRP systems. International Journal of Production Research 25 (2), 221-232.
    • (1987) International Journal of Production Research , vol.25 , Issue.2 , pp. 221-232
    • Yano, C.A.1    Carlson, R.C.2
  • 44
    • 0010741473 scopus 로고    scopus 로고
    • A new family of power transformations to improve normality or symmetry
    • Yao, I., Johnson, R.A., 2000. A new family of power transformations to improve normality or symmetry. Biometrika 87 (4), 954-959.
    • (2000) Biometrika , vol.87 , Issue.4 , pp. 954-959
    • Yao, I.1    Johnson, R.A.2
  • 46
    • 0031553213 scopus 로고    scopus 로고
    • Lot-sizing rules and freezing the master production schedule in material requirements planning systems
    • Zhao, X., Lam, K., 1997. Lot-sizing rules and freezing the master production schedule in material requirements planning systems. International Journal of Production Economics 53, 281-305.
    • (1997) International Journal of Production Economics , vol.53 , pp. 281-305
    • Zhao, X.1    Lam, K.2
  • 47
    • 0030107956 scopus 로고    scopus 로고
    • Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand
    • Zhao, X., Lee, T.S., 1993. Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand. Production Planning and Control 7 (2), 144-161.
    • (1993) Production Planning and Control , vol.7 , Issue.2 , pp. 144-161
    • Zhao, X.1    Lee, T.S.2
  • 48
    • 0030107956 scopus 로고    scopus 로고
    • Freezing the master production schedule in multilevel material requirements planning system under deterministic demand
    • Zhao. X. Lee, T.S., 1996. Freezing the master production schedule in multilevel material requirements planning system under deterministic demand. Production Planning & Control 7 (2), 144-161.
    • (1996) Production Planning & Control , vol.7 , Issue.2 , pp. 144-161
    • Zhao, X.1    Lee, T.S.2
  • 49
    • 84884343507 scopus 로고
    • Lot-sizing rules and freezing the MPS in material requirements planning systems under demand uncertainty
    • Zhao, X., Goodale, J.C., Lee, T.S., 1995. Lot-sizing rules and freezing the MPS in material requirements planning systems under demand uncertainty. International Journal of Production Research 33 (8), 2241-2276.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 2241-2276
    • Zhao, X.1    Goodale, J.C.2    Lee, T.S.3
  • 50
    • 0012315837 scopus 로고    scopus 로고
    • Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand
    • Zhao, X., Xie, J., Jiang, Q., 2001. Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand. Production and Operations Management 10 (1), 45-67.
    • (2001) Production and Operations Management , vol.10 , Issue.1 , pp. 45-67
    • Zhao, X.1    Xie, J.2    Jiang, Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.