메뉴 건너뛰기




Volumn 22, Issue 3, 2007, Pages 1834-1840

A risk evaluation based approach to replacement strategy of aged HVDC components and its application at BCTC

Author keywords

Aging failures; HVDC system; Power system reliability; Replacement strategy; Risk evaluation

Indexed keywords

ELECTRIC CABLES; ELECTRIC NETWORK ANALYSIS; ELECTRIC POWER SUPPLIES TO APPARATUS; ELECTRIC POWER SYSTEMS; ELECTRIC POWER TRANSMISSION NETWORKS; POWER TRANSMISSION; RISK ANALYSIS; RISK PERCEPTION; TELECOMMUNICATION EQUIPMENT; TELEGRAPH;

EID: 55149113244     PISSN: 08858977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRD.2007.899280     Document Type: Article
Times cited : (22)

References (16)
  • 1
    • 55149116994 scopus 로고    scopus 로고
    • High-Voltage Direct Current Handbook, EPRI TR-104166, GE Industrial and Power Systems, 1994.
    • High-Voltage Direct Current Handbook, EPRI TR-104166, GE Industrial and Power Systems, 1994.
  • 5
    • 0033079764 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation: 1992-1996
    • Feb
    • R. N. Allan, R. Billinton, A. M. Breipold, and C. H. Grigg, "Bibliography on the application of probability methods in power system reliability evaluation: 1992-1996," IEEE Trans. Power Syst., vol. 14, no. 1, pp. 51-57, Feb., 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.1 , pp. 51-57
    • Allan, R.N.1    Billinton, R.2    Breipold, A.M.3    Grigg, C.H.4
  • 6
    • 85008048742 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation 1996-1999
    • Nov
    • R. Billinton, M. Fotuhi-Fir-uzabad, and L. Bertling, "Bibliography on the application of probability methods in power system reliability evaluation 1996-1999," IEEE Trans. Power Syst., vol. 16, no. 4, pp. 595-602, Nov. 2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.4 , pp. 595-602
    • Billinton, R.1    Fotuhi-Fir-uzabad, M.2    Bertling, L.3
  • 7
    • 55149087927 scopus 로고    scopus 로고
    • Framework for Stochastic Reliability of Bulk Power System Palo Alto, CA
    • TR-110048, 1998
    • Framework for Stochastic Reliability of Bulk Power System Palo Alto, CA, EPRI Rep. TR-110048, 1998.
    • EPRI Rep
  • 8
    • 55149116330 scopus 로고    scopus 로고
    • Electric Delivery System Reliability Evaluation, IEEE Tutorial Course Text, 2005, 05TPI75.
    • Electric Delivery System Reliability Evaluation, IEEE Tutorial Course Text, 2005, 05TPI75.
  • 9
    • 0035505636 scopus 로고    scopus 로고
    • The present status of maintenance strategies and the impacts of maintenance on reliability
    • Nov
    • "The present status of maintenance strategies and the impacts of maintenance on reliability," IEEE Trans. Power Syst., vol. 16, no. 4, pp. 638-646, Nov. 2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.4 , pp. 638-646
  • 10
    • 21444450111 scopus 로고
    • Composite power system reliability analysis
    • CIGRE Task Force 38-03-10, Sep. 16-18
    • CIGRE Task Force 38-03-10, "Composite power system reliability analysis," in Proc. CIGRE Symp. Electric Power System Reliability Sep. 16-18, 1991.
    • (1991) Proc. CIGRE Symp. Electric Power System Reliability
  • 12
    • 0029306711 scopus 로고
    • Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver south metro system
    • May
    • W. Li, Y. Mansour, J. K. Korczynski, and B. J. Mills, "Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver south metro system," IEEE Trans. Power Syst., vol. 10, no. 2, pp. 964-970, May 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.2 , pp. 964-970
    • Li, W.1    Mansour, Y.2    Korczynski, J.K.3    Mills, B.J.4
  • 13
    • 0346076729 scopus 로고    scopus 로고
    • A reliability based approach to transmission maintenance planning and its application in BCTC system
    • Jan
    • W. Li and J. K. Korczynski, "A reliability based approach to transmission maintenance planning and its application in BCTC system," IEEE Trans. Power Del., vol. 19, no. 1, pp. 303-308, Jan. 2004.
    • (2004) IEEE Trans. Power Del , vol.19 , Issue.1 , pp. 303-308
    • Li, W.1    Korczynski, J.K.2
  • 14
    • 1442314555 scopus 로고    scopus 로고
    • Evaluating mean life of power system equipment with limited end-of-Life failure data
    • Feb
    • W. Li, "Evaluating mean life of power system equipment with limited end-of-Life failure data," IEEE Trans. Power Syst., vol. 19, no. 1, pp. 236-242, Feb. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.1 , pp. 236-242
    • Li, W.1
  • 15
    • 33244487759 scopus 로고    scopus 로고
    • Probability distribution of HVDC capacity considering repairable and aging failures
    • Jan
    • W. Li, "Probability distribution of HVDC capacity considering repairable and aging failures," IEEE Trans. Power Del., vol. 21, no. 1, pp. 523-525, Jan. 2006.
    • (2006) IEEE Trans. Power Del , vol.21 , Issue.1 , pp. 523-525
    • Li, W.1
  • 16
    • 55149094339 scopus 로고    scopus 로고
    • Pole 1 and Pole 2 DC Cable -2005 ROV Inspection (Summary of Results), BC Hydro Rep., Vancouver, BC, Canada, 2006.
    • Pole 1 and Pole 2 DC Cable -2005 ROV Inspection (Summary of Results), BC Hydro Rep., Vancouver, BC, Canada, 2006.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.