-
1
-
-
84858098791
-
Paralel makineli çizelgeleme probleminde ögrenme etkili hazirlik zamanlari, Huten, Cilt 2
-
s
-
Eren, T. ve Güner, E., "Paralel makineli çizelgeleme probleminde ögrenme etkili hazirlik zamanlari", Huten, Cilt 2, Sayi 4, s. 67-72, 2006.
-
(2006)
Sayi
, vol.4
, pp. 67-72
-
-
Eren, T.1
ve Güner, E.2
-
2
-
-
0002134507
-
Two-machine flowshop with separated sequence-independent setup times: Mean completion time criterion
-
Bagga, P.C. ve Khurana, K., "Two-machine flowshop with separated sequence-independent setup times: mean completion time criterion", Indian Journal of Management and Systems, Volume 2, pp. 47-57, 1986.
-
(1986)
Indian Journal of Management and Systems
, vol.2
, pp. 47-57
-
-
Bagga, P.C.1
ve Khurana, K.2
-
3
-
-
0032162519
-
Total flowtime in no-wait flowshops with separated setup times
-
Aldowaisan, T. ve Allahverdi, A., "Total flowtime in no-wait flowshops with separated setup times", Computers & Operations Research, Volume 25(9), pp. 757-765, 1998.
-
(1998)
Computers & Operations Research
, vol.25
, Issue.9
, pp. 757-765
-
-
Aldowaisan, T.1
ve Allahverdi, A.2
-
4
-
-
0034141527
-
Minimizing mean flowtime in a two-machine flowshop with sequenceindependent setup times
-
Allahverdi, A., "Minimizing mean flowtime in a two-machine flowshop with sequenceindependent setup times", Computers & Operations Research, Volume 27(2), pp. 111-127, 2000.
-
(2000)
Computers & Operations Research
, vol.27
, Issue.2
, pp. 111-127
-
-
Allahverdi, A.1
-
5
-
-
85006730976
-
No-wait and separate setup three-machine flowshop with total completion time criterion
-
Allahverdi, A. ve Aldowaisan, T., "No-wait and separate setup three-machine flowshop with total completion time criterion", International Transactions in Operational Research, Volume 7(3), pp. 245-264,2000.
-
(2000)
International Transactions in Operational Research
, vol.7
, Issue.3
, pp. 245-264
-
-
Allahverdi, A.1
ve Aldowaisan, T.2
-
6
-
-
0035324669
-
A new heuristic and dominance relations for no-wait flowshops with setups
-
Aldowaisan, T., "A new heuristic and dominance relations for no-wait flowshops with setups", Computers & Operations Research, Volume 28(6), pp. 563-584, 2001.
-
(2001)
Computers & Operations Research
, vol.28
, Issue.6
, pp. 563-584
-
-
Aldowaisan, T.1
-
7
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi, A. Ve Gupta, J.N.D. and Aldowaisan, T., "A review of scheduling research involving setup considerations", Omega, 27: pp.219-239, 1999.
-
(1999)
Omega
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Ve Gupta, J.N.D.2
Aldowaisan, T.3
-
8
-
-
0033078946
-
Survey of scheduling reseach involving setup times
-
Yang, W-H. ve Liao, C-J., "Survey of scheduling reseach involving setup times", International Journal of Systems Science, 30 (2): 143-155, 1999.
-
(1999)
International Journal of Systems Science
, vol.30
, Issue.2
, pp. 143-155
-
-
Yang, W.-H.1
ve Liao, C.-J.2
-
9
-
-
0000647451
-
A review of flowshop scheduling research with setup times
-
Cheng, T.C.E., Gupta, J.N.D. ve Wang, G., "A review of flowshop scheduling research with setup times", Production and Operations Management, 9 (3): 262-282, 2000.
-
(2000)
Production and Operations Management
, vol.9
, Issue.3
, pp. 262-282
-
-
Cheng, T.C.E.1
Gupta, J.N.D.2
ve Wang, G.3
-
10
-
-
84858101001
-
-
Eren, T. ve Güner, E., Akiş tipi çizelgeleme problemlerinde işe-baǧimh öǧrenme etkisi, K.H.O. Savunma Bilimleri Dergisi, Cilt 2(2), s.1-11, 2003.
-
Eren, T. ve Güner, E., "Akiş tipi çizelgeleme problemlerinde işe-baǧimh öǧrenme etkisi", K.H.O. Savunma Bilimleri Dergisi, Cilt 2(2), s.1-11, 2003.
-
-
-
-
11
-
-
3042587565
-
Öǧrenme etkili akiş tipi çizelgeleme probleminde ortalama akis zamammn enküç üklenmesi
-
Cilt , s
-
Eren, T. ve Güner, E., "Öǧrenme etkili akiş tipi çizelgeleme probleminde ortalama akis zamammn enküç üklenmesi", Gazi Üniversitesi Mühendislik Mimarlik Fakültesi Dergisi, Cilt 19(2), s. 119-124, 2004.
-
(2004)
Gazi Üniversitesi Mühendislik Mimarlik Fakültesi Dergisi
, vol.19
, Issue.2
, pp. 119-124
-
-
Eren, T.1
ve Güner, E.2
-
12
-
-
0742284281
-
-
Lee W.-C. ve Wu C.-C. Minimizing total completion time in a two-machine flowshop with a learning effect, International Journal of Production Economics, 88, pp. 85-93, 2004.
-
Lee W.-C. ve Wu C.-C. "Minimizing total completion time in a two-machine flowshop with a learning effect", International Journal of Production Economics, Volume 88, pp. 85-93, 2004.
-
-
-
-
14
-
-
0016952078
-
The complexity of flowshop and jobshop scheduling
-
Garey, M.R., Johnson, D.S. ve Sethi, R., "The complexity of flowshop and jobshop scheduling", Mathematics of Operations Research, Volume 1(2), pp. 117-129, 1976.
-
(1976)
Mathematics of Operations Research
, vol.1
, Issue.2
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
ve Sethi, R.3
-
15
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
Nawaz, M., Enscore, E.E. ve Ham, I., "A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem", Omega, Volume 11, pp. 91-95, 1983.
-
(1983)
Omega
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
ve Ham, I.3
-
16
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
Glover F., "Future paths for integer programming and links to artificial intelligence", Computers and Operations Research, Volume 5, pp. 533-549, 1986.
-
(1986)
Computers and Operations Research
, vol.5
, pp. 533-549
-
-
Glover, F.1
-
17
-
-
0003753097
-
-
Prentice Hall, USA
-
Jang, J.-S.R., Sun, C.T. ve Mizutani, E., Neurofuzzy and soft computing: A computational approach to learning and machine intelligence, Prentice Hall, USA, 1997.
-
(1997)
Neurofuzzy and soft computing: A computational approach to learning and machine intelligence
-
-
Jang, J.-S.R.1
Sun, C.T.2
ve Mizutani, E.3
|